A tall bar cabinet looks simple on a drawing — one floor-to-ceiling box with glass in the middle. On site it is where three trades collide: the joiner, the electrician and the stone fabricator. Most of the rework we see on villa and apartment fit-outs starts with a unit that was specified as furniture when it should have been coordinated as an interior fixture. The checklist below is the one we use when a client sends us a bar wall for quotation, in the order the decisions actually have to be made.
1. Scope: what exactly is being ordered
Before any dimension is written down, fix which type of unit the drawing shows. A Tall Bar Cabinet, a wall-mounted bar unit and a full integrated bar system behave differently on site and price very differently.
Use this table to match the unit to the space, then confirm the site conditions in the right-hand column.
| Unit type | Where it works | What you must resolve early |
|---|---|---|
| Tall cabinet (floor to ceiling) | Kitchen ends, pantry walls, living-room bar niches | Floor level and ceiling line; whether the top is scribed or boxed; appliance recess if any |
| Glass-front tall unit | Display and bottle storage in open-plan living | Glass type, framing profile, internal shelving span, lighting feed |
| Integrated bar system | Villa entertainment walls, show apartment bars | Counter material, splashback, services for sink or wine column, joinery-to-wall detail |
| Wall-mounted unit | Compact apartments, wet bars with limited floor area | Substrate and fixing method behind the wall lining |
We manufacture these units to measure, so the unit type is decided from your drawing rather than chosen from a fixed catalogue size. Our Integrated Bar Systems and Glass Front Bar Cabinets are configured this way.
2. Dimensions and clearances — the numbers that cause call-backs
- Finished floor level confirmed on site, not taken from the architectural plan alone. Tall units expose every millimetre of slab variation.
- Total height to the finished ceiling, including the thickness of any cornice, skirting or shadow gap you intend to keep.
- Depth of carcase against depth of door and handle projection — a shallow niche with a protruding pull reads even shallower once fitted.
- Glass shelf span and shelf spacing set by the tallest bottle in the client's list, not by an average.
- Opening clearance: does the door swing hit an adjacent return wall, an appliance handle or a bar stool when fully open?
Where the unit is bespoke, we take these from your drawings and confirm them against the site survey before production. If you are combining the bar wall with general Custom Built-in Kitchen Cabinets, it is worth having one joiner package both so the door profile, grain direction and shadow gaps match.
3. Materials and finishes stated precisely
"Grey laminate" is not a specification. For each surface on the bar wall, the order should record:
- Door core and door face material — melamine, lacquer, acrylic, veneer or aluminium-framed glass.
- The exact finish name and sheen level, with a physical sample approved and signed before production.
- Edge treatment — matching edge band, mitred edge or metal trim — because this is what ages visibly when it is wrong.
- Internal carcase colour. A dark exterior with a light interior is a deliberate choice; a mismatched one is not.
- Glass specification for glazed doors: clear, bronze, smoked or ribbed, framed or frameless.
We supply these as project-specific material and finish options rather than a fixed palette, which keeps the bar cabinet consistent with the rest of the interior fixtures on the same floor.
4. Hardware and internal fit-out
Tall bar cabinets fail on hardware long before they fail on panels. Specify:
- Hinge type and load rating for tall, glazed doors — glazed doors are heavier than the sample door used in the showroom.
- Soft-close on every door and drawer that a guest or resident will use daily.
- Drawer slide rating against intended load, particularly for decanter and glassware storage.
- Lift-up or bi-fold mechanism if the working bar surface is concealed; check the door's parked position does not block the counter.
- Wine storage: racking layout, whether a wine fridge or column is being integrated, and its ventilation requirement.
Hardware — hinges, slide rails, support legs and connecting brackets — is supplied as part of the cabinet package on project orders, which removes one interface between suppliers at handover.
5. Lighting and services: settle this before production
This is the item most often left out of a joinery order and added as a site variation. For any lit display cabinet you need to fix, in writing:
- Light position — shelf edge, vertical channel or top panel — and how the fitting is concealed.
- Switching: door-activated, touch, remote or wall dimmer, and where the driver sits so it stays accessible after installation.
- An electrical feed run into the carcase cavity before the unit is fixed to the wall. Retrofitting a cable into an installed tall cabinet usually means removing it.
- Any water supply, waste or appliance power for a wet bar, coordinated with the plumbing and electrical drawings rather than assumed.
Where the design calls for lit shelving, our Integrated Cabinet Lighting is specified together with the cabinet so the profiles, driver location and cable routes are built into the carcase.
6. Installation conditions and site handover
Delivery does not end the job; tall units are where poor site preparation shows up.
- Wall substrate behind the unit — lining type and stud or backing positions for wall-mounted and anchored units.
- Floor screed fully dry and finished level before a tall carcase is delivered; packing a leaning unit is a visible compromise.
- Protection plan: glazed doors moving through a site that still has wet trades running.
- Snag list at handover — door alignment, glass condition, lighting circuits, hardware adjustment — signed off with the builder.
For projects shipped overseas we arrange freight and door-to-door delivery as part of the same package, and installation and after-sales support are coordinated through the same contact rather than split across three contractors.
7. Commercial terms worth confirming in writing
- What the quotation includes: carcase, doors, hardware, glass, lighting, packaging and freight — or which of these are excluded.
- Whether the price is ex-works or delivered to site, and who carries risk in transit.
- MOQ for a mixed package; bar cabinets ordered alone rarely ship economically alongside loose furniture.
- Approval sequence: shop drawing sign-off, material sample sign-off, then production release. Nothing should start before both are returned.
A short pre-production check against this list — dimensions taken from a site survey, finishes approved on physical samples, lighting and services resolved on the drawings — removes most of the variations that appear at handover. Send us the bar wall drawing and we will mark up what is missing before quoting.
Talk to us about your bar wall
SANTERSON is a China-based furniture and building materials manufacturer operating since 2008, supplying custom cabinetry for villa, apartment and hospitality projects. Send drawings and we will return a quotation with the specification gaps flagged.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com | Enquiries: https://www.santerson.com/contact/