A double basin countertop rarely fails at the production stage. It fails at the moment somebody reads a drawing, assumes a dimension and never writes it down. If your bathroom scheme calls for two basins side by side, the enquiry you send matters as much as the design itself. Below is the working sequence we use when a Santerson Double Basin Countertop moves from a designer's sheet into a manufacturing order.
Start with the room, not the product page
Product pages show configurations; they do not tell you whether a configuration suits your wall. Before you quote anything, fix three numbers on site: the clear run of wall the vanity must occupy, the position of the existing waste and water supply, and the finished floor level once tiling is complete. Tiles and screed change heights by more than people expect, and a countertop ordered against a sub-floor level will sit wrong on site.
Send those measurements as a marked-up sketch rather than a bare list of figures. A sketch that shows which wall the numbers run from removes half the questions in the reply. Where the wall is not square, say so — out-of-square walls are common in renovations, and a countertop cut to a nominal rectangle will leave a visible gap at one end.
Decide how the two basins sit before choosing the top
The basin mounting method drives everything downstream: cut-out size, tap hole positions, the underside support detail and the minimum distance between the two taps. Our Santerson Undermount Basin option needs a cut-out in the top, so the cut-out dimensions and countertop compatibility have to be confirmed together rather than ordered as separate line items. A Santerson Vessel Basin (Above Counter) sits on the surface instead, which changes the tap reach you need and the height of the mirror above it.
If the design wants the top and basins to read as one continuous form, an Integrated Basin removes the joint between them. That is a decision for the concept stage, not after the stone has been cut.
Specify the surface and the edge in the same message
Material and edge profile are usually quoted together, so sending them separately costs a round trip. For Santerson Stone & Marble Surfaces, state the slab you want, the finish (polished or honed), the edge profile and whether the splashback is made from the same material with a matching vein direction. Natural stone varies between slabs; if the vein direction matters to the design, say so in the enquiry and ask for the slab selection to be confirmed before cutting.
Where the scheme carries the same surface into the kitchen or a vanity carcass, mention that too. Ordering bathroom and kitchen surfaces in one batch keeps the material consistent and reduces the number of separate shipments arriving on site.
Match the countertop to the vanity it sits on
A double basin top is often specified alongside a Santerson Double Vanity, and the two must be dimensioned as one assembly. The carcass width, the overhang of the top on each side and the drawer clearance below all have to agree. Where the design calls for the top and cabinet to be built as a single unit, an Santerson Integrated Countertop Vanity is the simpler route, because the countertop, basins and storage are configured together instead of being reconciled across two orders.
For a wall-hung look, note that the fixing detail has to be designed into the carcass before manufacture. Say what the wall construction is — stud, timber frame or masonry — in the first message.
What to put in the enquiry itself
A complete enquiry saves at least one exchange of email. Include:
- Overall width, depth and thickness of the countertop, plus the required finished height above the completed floor.
- Basin type for each position, and the centre-to-centre distance between the two basins.
- Tapware you intend to use, with reach and mounting height, so tap hole positions follow from it.
- Waste and overflow type, and whether the wastes tie into one another or run separately.
- Cut-outs for anything else that penetrates the top: soap dispensers, an integrated Vanity Lighting fitting or a power point.
- Quantity of identical sets, the delivery address and how the goods will be received on site.
Send drawings in PDF with dimensions in millimetres, and keep the file named for the room rather than the product. Two files called "countertop.pdf" from different bathrooms is a predictable source of error.
How the enquiry moves into production
Once the details are settled, the sequence follows our usual project path: confirmation of the specification and quotation, then manufacturing with quality checks against the approved drawing, then packing and door-to-door delivery under the arrangement agreed for your site. Because these tops are made to the dimensions supplied rather than picked from stock, the approved drawing is the document production works from — read it carefully before you sign it off, since a correction after cutting begins is expensive and slow.
Where the countertop is part of a wider bathroom or whole-villa fit-out, group it with the other sanitary fixtures, joinery and finishes in one enquiry. Coordinating them as a single package means one set of dimensions governing the room, rather than several suppliers each working from their own reading of the drawing.
Before you send it
Three checks take two minutes and prevent most rework. Confirm every dimension against site, not against the architect's original plan, if the building has already been altered. Confirm that basin type, tapware and mirror height were chosen with each other in mind. And confirm who on site will receive the goods and check them — a made-to-measure top discovered to be wrong after it lands is a different problem from one caught in the drawing review.
Send your drawings and room dimensions to us with the product name in the subject line, and we will come back with the specification questions that need answering before the countertop goes into production.