A 7-metre swim spa is not an off-the-shelf purchase. When a villa developer, resort operator or landscape contractor in Australia decides to add one, the question is rarely "does this model exist" — it is "who will build it to our specification, ship it to our site and stand behind the installation". That is where OEM sourcing changes the picture, and the Outdoor Swim Spa WS-S07B is a good example of how the process runs from first drawing to handover.

What "OEM sourcing" means for a swim spa

Buying a standard unit means accepting somebody else's specification: fixed jet count, fixed pump layout, fixed cabinet finish. OEM manufacturing means your project becomes the reference point instead. You supply the plan — dimensions to suit the plot, jets arranged for how residents actually use the water, finishes that match the surrounding deck and facade — and the factory builds against your drawings rather than its own catalogue sheet.

For buyers who already trade under their own brand, OEM work goes a step further: engraving, embossing, logos and packaging can be applied so the unit arrives carrying your identity, not ours. Minimum order quantities are set per project rather than by a blanket rule, which matters when you are specifying one swim spa for a single villa rather than fifty for a chain.

SANTERSON is a China-based furniture and building materials manufacturer that also supplies spas, outdoor furniture, lighting, cabinetry, ceramics and interior fixtures. That breadth is the practical reason an OEM swim spa is easy to coordinate: the same team handling your pool shell is already producing the pergola, loungers, tiles and joinery around it, so one specification set governs the whole outdoor area.

The WS-S07B as a starting point, not a fixed answer

Our catalogue lists this model at 7000 × 2200 × 1335 mm, with three water pumps, one filter pump, a jet total of 48 pcs, LED lighting (3 lights plus 26 small LEDs), ozone sanitisation and a waterfall feature. Total power is shown as 13.35 kW. Treat those figures as the reference configuration — the numbers your engineer measures against when they compare your site's power supply, structural pad and clearance requirements.

Catalogue itemShown for WS-S07B
Catalogue dimensions7000 × 2200 × 1335 mm
Water pump / filter pump3 pcs / 1 pc
Jet total48 pcs
LED lighting3 lights; 26 small LED lights
Features shownWater jets, LED lighting, Ozone, Waterfall
Total power13.35 kW

Two cautions before anyone draws up a foundation. First, the swim training system is not listed for this model in our captured specifications; if your residents want counter-current swimming, say so at the enquiry stage, because the variant built for that duty — WS-S07B-T — carries a different pump arrangement, jet count and power figure. Second, the total power shown on the page is not the same thing as the supply your site needs after local earthing, protection and circuit design are added. Confirm included equipment and electrical requirements for the selected configuration with your engineer before any concrete is poured.

How the OEM process runs, step by step

1. Brief and space planning

You send the site plan, the intended use (lap swimming, hydrotherapy, children's play, guest villa), and the finishes already chosen for the terrace. Our design team returns a layout proposal with 3D visual renderings showing where the shell sits relative to the pool deck, pergola and drainage runs. This is the stage at which a metre of length either side gets argued over, because it decides whether the unit ships in one piece.

2. Specification and quotation

Everything becomes explicit on paper: shell dimensions, jet positions and types, pump count, filtration route, ozone or UV sterilisation, heat pump sizing, insulation for cooler climates, steps, control system, cabinet and coping finishes. Options catalogued for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps — availability and compatibility vary by model, so each line is confirmed rather than assumed.

3. Prototyping and material selection

For bespoke work we move through 3D modelling and prototyping before series production, with material choices covering wood, metals, engineered stone and laminates for the surrounding deck, coping and cabinetry. If your brand needs to appear on the equipment or packaging, engraving, embossing and logo work is arranged here.

4. Production and quality control

The unit is built inside our own facility alongside the other products in the same project — outdoor furniture, pergolas, wall panels, lighting and bathroom ceramics — under a single production schedule. One factory calendar means fewer surprises when a site needs the spa and the poolside furniture to land together.

5. Freight, customs and door-to-door delivery

Freight is arranged by sea, air or rail, with packaging and container loading planned around the shell's dimensions. We prepare commercial invoices, packing lists, certificates of origin and the paperwork import permits require, then track the shipment to your address. Import terms, duties and transit time for Australia are settled case by case; we do not quote them as a standing guarantee.

6. Installation, snags and after-sales

On-site installation follows with an inspection and snag list before handover, plus warranty coverage, spare parts and ongoing maintenance for pumps, jets, lighting and controls. A swim spa is a mechanical plant that will run for years, so the parts conversation should happen at the specification stage — not when a pump fails in year three.

Why buyers group the spa with the rest of the fit-out

A swim spa specified alone tends to arrive as its own contract, its own freight booking and its own defect liability. Specified as part of a wider package, it becomes one line in a single procurement: one-stop supply covering the shell, the poolside furniture, the pergola or cabana daybed, wall and ceiling finishes, lighting and any adjacent bathroom. Fewer suppliers means fewer clashes between trades and one accountable party when something does not match the drawing.

If you are comparing configurations rather than committing to one, our wider product catalogue lists the full swim spa range with dimensions and equipment for each model, which makes it straightforward to shortlist two or three sizes before the design stage begins.

Questions buyers ask us about OEM spas

Can the dimensions be changed from 7000 × 2200 mm?

Within the range, yes — the catalogue carries shorter and longer shells with different widths and depths. What matters is that the revised size still clears your access route, crane or lifting point, and structural pad. Send the site constraints early and we will tell you which size fits rather than promising any size.

Do you build to another company's drawings?

Yes, under our custom and OEM service. Send the technical drawing and we confirm feasibility, materials and tolerances before quoting. Where a detail falls outside what the plant can produce reliably, we say so at that stage.

Who handles Australian import and site installation?

We arrange freight forwarding, customs documentation and door-to-door delivery, and we provide on-site installation with inspection and snagging. Duties, local electrical connection and any builder's works on your side are confirmed per project, since they depend on the site and jurisdiction.

What is the minimum order for an OEM run?

Minimum order quantities are flexible and set with you. A single villa unit and a multi-townhouse rollout are both workable; the commercial terms differ, so raise the quantity at the enquiry rather than after the drawings are finished.

Before you sign an OEM order for the WS-S07B, get three things in writing: the confirmed equipment list for your configuration, the electrical load and protection requirements as they apply to your site, and the delivery scope down to kerb or pad level. Anything left as a verbal agreement at that point becomes a variation later.
Start with your site plan. Send the plot dimensions, intended use and target completion date, and our team will come back with a configuration proposal for the WS-S07B or the variant that suits — including production schedule and door-to-door delivery to your project. Contact PHILLIP on WhatsApp +86-13928214007, email santerson@qq.com, or use our contact page. Enquiries receive a response within 24 hours, Monday to Saturday, 8:00 AM – 6:00 PM (GMT+8).