A swim spa quotation only works when the specification behind it is complete. For the Outdoor Swim Spa WS-PC07A, the difference between a smooth build and an expensive change order usually comes down to how precisely the buyer defines shell size, equipment count, water treatment, power supply and site access before the order is placed. The steps below follow the way we specify swim spas for villa gardens, resort poolsides and private training facilities.

Start with the footprint, not the jet count

The catalogue lists WS-PC07A at 7000 × 3000 × 1470 mm. Treat that as the starting point for three separate checks, because a single dimension line answers none of them.

  • Water footprint: the 7000 × 3000 mm shell plus the clearance your local authority or building manager requires around it. State whether steps, plant cabinets and any cover lift sit inside or outside that rectangle.
  • Excavation and structural support: a filled shell of this size loads the slab heavily. Record the finished water depth against the 1470 mm overall height, then confirm with your engineer whether the pad, deck or terrace can carry the wet load, including people.
  • Access route: note gate widths, turning radii, overhead beams and the crane or forklift available at the site. The delivery path decides whether a one-piece shell can be placed as built or whether the specification must change.

Write these three items into the enquiry with drawings attached. Quotations compared on jet count alone are not comparable quotations.

Record the equipment list line by line

For this model the catalogue shows the configuration below. Put it into your own table and mark every line as "included", "optional" or "supplied by others". That single habit removes most disputes at handover.

Specification itemCatalogue entry for WS-PC07AWhat to confirm in writing
ModelWS-PC07AExact model code on the quotation, invoice and shipping documents.
Catalogue dimensions7000 × 3000 × 1470 mmWhether dimensions include steps, cladding and plant housing.
Control system1 setControl location, waterproof rating and who wires the supply side.
Water pump4 pcsPump duty per jet zone and access for servicing.
Filter pump1 pcFiltration run time, filter grade and spare filter supply.
Jet total62 pcsJet layout by station: therapy, hydro-massage and seat positions.
LED lights1Fixture position, colour setting and control method.
Total power9.55 kWVoltage, phase, circuit sizing, protection and who supplies the final connection.
Features shownWater jets, LED lighting, OzoneWhether ozone is the only sanitisation or UV is added.

The catalogue also lists optional accessories for this range: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option needs written confirmation against the exact unit you are ordering — not a general statement that the option exists.

Two points we always flag for this code: a swim training system is not listed in the catalogue specification for WS-PC07A, and the 9.55 kW total power figure must be checked against your local supply before any circuit is designed. If lap swimming is part of the brief, ask us to confirm which configuration in this range includes that system rather than assuming it can be added later.

Outdoor Swim Spa WS-PC07A as listed in the SANTERSON catalogue

Outdoor Swim Spa WS-PC07A as published on santerson.com. Check the configuration shown against your own quotation.

Compare within the range before you fix the model

Buyers often shortlist one code too early. The Swimming Pools and Swim Spas catalogue holds several configurations around a similar length, and the equipment package changes with them. Two useful comparisons from the same catalogue:

  • Outdoor Swim Spa WS-PC07A-T shares the 7000 × 3000 × 1470 mm shell and adds a swim training system, with a different pump, jet and lighting package and a higher total power figure.
  • Outdoor Swim Spa WS-PC07ST keeps the 7000 mm length at a narrower 2400 mm width, with a swim training system and a lower total power figure — relevant where garden width or electrical supply is the limiting factor.

Put two or three candidates side by side on one table: shell size, jet count, pumps, treatment, power and options. The right model is usually the one that fits the site constraints first and the usage brief second.

Specify the services around the shell

A swim spa arrives as part of a project, not as a boxed item. Our one-stop furniture and building materials supply covers swim spas alongside the surrounding works, which is where most coordination happens:

  • Design and planning: deck finishes, drainage, plant position, wet-area lighting and any pergola, lounger or storage furniture around the water.
  • Custom work: cladding colours, step arrangements and cabinet finishes matched to the villa or resort palette through our custom and OEM service.
  • Logistics: freight by sea, air or rail with customs paperwork and door-to-door delivery under our logistics service. Confirm import terms, duties and insurance for the destination country on each order.
  • Installation and after-sales: site guidance, inspection with a snag list, spare parts and maintenance support through our installation and after-sales service. Warranty scope and response arrangements should be stated in the contract for your project.

For hospitality work, this is also where a swim spa specification has to align with the rest of the wet area — bathroom sanitary fixtures, shower systems and lighting are easier to coordinate when one supplier holds the whole schedule.

The six questions a good specification answers

  • Which exact model code is quoted, and does it match the drawing?
  • Which equipment items are included, optional or supplied by others?
  • What is the electrical supply on site, and who designs and installs the circuit?
  • How is the water sanitised and heated, and what running costs follow from that choice?
  • What is the delivery route, lifting method and installation sequence?
  • Who inspects on handover, and what is covered by spares and maintenance support?

Send those answers with your drawings and we will return a specification that matches them — model code, equipment list, options and power requirement stated line by line.

Preparing an enquiry for WS-PC07A, or comparing it with another configuration in the range? Send the site drawing, your electrical supply details and the intended use to SANTERSON, and we will confirm the specification, options and delivery scope before you commit.