A swim spa arrives on site as one shell, but it lands inside a much longer list of trades: slab and footings, power, water, drainage, paving, screening, landscaping and sometimes a pergola or pool house. The model itself is only the first line on the purchase order. This guide uses the Outdoor Swim Spa WS-S06C as a worked example, then shows how to turn that single product into a complete, conflict-free bill of materials before anything is ordered.

Start with the shell, not the quantity

Quantity planning for a swim spa is different from counting chairs or cabinets. A spa is one unit per location, so the number is set by how many pools the project actually needs — one villa terrace, or one unit per guest villa in a resort phase. What genuinely multiplies is everything around it: pumps and control sets are already inside the shell, while heat pumps, sterilisation, filtration upgrades, steps and insulation sit outside the standard specification and must be counted separately.

Before any quantity sheet is started, take the shell's own figures from the product page and write them into your drawing as fixed numbers. For the WS-S06C, the catalog lists:

ModelWS-S06C
Catalog dimensions5880 × 2380 × 1400 mm
Control system1 set
Water pump3 pcs
Filter pump1 pc
Jet total33 pcs
LED lights2
Total power9.95 kW
Features shown on the pageWater jets, Temperature setting, LED lighting, Ozone

Treat those numbers as the catalog entry for that exact model. Two habits protect you later: never copy a specification from a sister model in the same series, and never let an electrician or civil contractor size anything off a rendering. Sibling models in the 5.8-metre class look almost identical on a plan but carry different depths, pump counts and power loads, so a figure borrowed across the range will send the wrong load to the electrical engineer.

Read the dimensions as clearances, not just footprints

The 5880 × 2380 × 1400 mm entry is the shell. What you place on the drawing is the shell plus working space. Plan for four separate gaps:

  • —Access route. The delivery path from the truck to the final position has to clear gates, side setbacks and overhead lines. Measure it on site, not from the plan.
  • —Service access. Pumps, filters and the control set need reachable panels for routine maintenance; a spa boxed in on all four sides becomes expensive to service.
  • —Structural edge. Where the shell sits on a slab, deck or plinth, the supporting structure and any retaining edge sit outside the shell dimension.
  • —Water features around it. Paving falls, drainage channels and steps are drawn from the spa edge outward.

The depth of 1400 mm sets the finished water level relative to the surrounding deck, which is what the paving and step design have to match. Confirm that relationship with the supplier in writing before the slab is poured — it is far cheaper to move a dimension on paper than to rebuild a deck.

Count what is included separately from what is optional

The catalog entry for this range lists options that are ordered, not assumed: control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option has to be confirmed against the specific unit you are buying.

Build your bill of materials in three columns:

  • 1.Included as specified — the pumps, control set, jets and lighting shown for the model. These are counted once per unit and should appear on the packing list.
  • 2.Selected options — heat pump, UV sterilisation, sand filtration, insulation, steps. Each one changes both the price and the services required on site, so list them with quantities per unit.
  • 3.Site-supplied — slab or plinth, electrical feed and protection, water supply, drain, controls location, handovers. These never appear on the spa packing list, which is exactly why they get missed.

Total power is a catalog figure for the standard configuration. Adding a heat pump or an upgraded pump changes the load. Send the final option list to the electrical engineer and ask them to size the circuit from that list, not from the published number.

Coordinate the spa with the rest of the outdoor package

A swim spa is rarely specified alone. On villa and resort projects it sits in the same outdoor zone as loungers, a shaded structure, an outdoor dining set and often storage for towels and chemicals. Coordinating those items with the shell prevents the classic late-stage clashes: a lounger layout that blocks the access side, a pergola post inside the crane path, or a bar cabinet with no power run.

Sourcing that whole outdoor package from one outdoor furniture collection has a practical benefit beyond convenience — one technical file, one production schedule and one delivery window. Frames and finishes are matched across pieces, so the aluminium, rope weave, wicker and teak-look surfaces read as one scheme on handover instead of several suppliers' catalogues placed side by side.

Where a project needs more than the standard catalogue footprint — a terrace that cannot take a straight shell, or a spa alcove shaped to a courtyard — a customizable shape outdoor spa is the alternative. Custom geometry moves the coordination burden earlier: the shape has to be fixed before the civil drawings are issued, and lead time is longer than for a catalogue model.

Set quantities for spares and documentation, not just hardware

For a single villa, spares are a judgement call. For a resort phase or a multi-unit development, decide the spare policy before ordering:

  • —Order identical models across units so one set of spares and one maintenance routine covers the whole inventory. Mixed models multiply spare part numbers and training.
  • —Agree which consumables ship with the first delivery — filters, jet components, lighting spares — and which are ordered later.
  • —Request as-built documentation per unit: wiring schedule, pump and control nameplates, commissioning record. Handover packs are what facilities teams actually use.

A coordination checklist to close out before ordering

  • ✓Model code, catalog dimensions and option list confirmed in writing for each unit.
  • ✓Delivery route measured on site; lifting or crane needs flagged early.
  • ✓Slab, plinth or deck design signed off against the shell dimension and finished water level.
  • ✓Electrical load confirmed from the final option list, with isolation and control location shown on drawings.
  • ✓Water supply, drainage and overflow routed and dimensioned.
  • ✓Service access around pumps, filter and control set kept clear in the landscape design.
  • ✓Surrounding outdoor furniture, shading and storage coordinated with the spa footprint.
  • ✓Spare-parts policy and per-unit handover documentation agreed before production starts.

SANTERSON works as a one-stop furniture and building materials supplier, so swim spas, outdoor furniture, shading structures, paving-adjacent finishes and interior fixtures can be specified and shipped under one project schedule rather than split across vendors. Send us the plan, the room list and the option selections for each unit, and we will return a consolidated specification with quantities, confirmed options and a coordinated delivery sequence.