Sliding wall systems rarely fail because of the panel face. They fail because a track, an opening dimension or a finish approval was never written down. If your team is specifying Santerson Textured Sliding Panels for a villa guest room, a residence media wall or a hotel suite, the documentation you gather before production starts decides whether installation day runs to plan. The list below is what we ask buyers, designers and site contractors to record on every project.
1. Where the panels will be used
Start with the room, not the product. Sliding panel systems are configured per space, so each opening needs its own record. Note the building and unit reference, the function of the wall (closet front, media wall, partition between two areas), expected daily use, and who operates it - guests, residents or housekeeping staff. A system in a busy corridor is handled far more often than one in a private bedroom, and that changes what hardware you ask for.
Our project work spans villas and hospitality interiors, and the same catalogue item behaves differently in each setting. For related wall systems on the same job, record which line applies: Santerson Partition Sliding Systems for room separation, or Santerson Textured Panels where the wall is fixed rather than moving.
2. Openings, dimensions and site conditions
These listings are made to measure, so a dimension taken off a drawing is not the same as a dimension taken on site. Record both, and mark where they differ. For every opening, document:
- Clear width and clear height at finished floor and finished wall levels, plus the tolerance you allow.
- Floor levelness and wall plumb; sliding tracks only work as well as the surface they sit on.
- The structural backing available above and beside the opening, and what it can carry.
- Adjacent finishes: flooring type at the track line, skirting detail, ceiling junction, and any reveal or shadow gap.
- Services in the wall: wiring, sockets, switches, lighting feeds or data points that a moving panel could cover.
Where the specification calls for integrated lighting or an illuminated media wall behind the panels, note that requirement early. It affects cable routing and access before the panels are fixed in place.
3. Track, hardware and operating detail
Hardware is where procurement notes save the most rework. Confirm and write down the track type, whether the system is top-hung or floor-guided, the number of panels, the stacking direction, and how much pocket space each panel needs when open. Record the handle or profile edge detail, soft-close or plain runners if specified, and any lock requirement for guest-room or storage applications.
Then record access. Panels move, so the wall behind them needs inspection points for anything you may need to reach later. Note what must stay reachable, and confirm that with the mechanical and electrical trades before fabrication.
4. Finish, texture and sample approval
Textured surfaces are judged in raking light, so a swatch on a desk tells you very little. Approve a physical sample held against the actual wall finish and viewed under the room's own lighting. In the record, keep the sample reference, the supplier's finish name, the sheen level, and who signed it off with a date.
Also state how texture runs across multiple panels - grain direction, joint alignment and the sequence panels should be installed in. For multi-unit projects, note which units repeat the same schedule, so one approval covers them instead of eight separate sign-offs.
5. Packaging, delivery and handling on site
Oversized panels arriving without a plan cause damage. Document the container or consignment type, the packaging specification, panel orientation in the crate, protection at edges and corners, and the labelled reference that ties each crate to a specific opening. Record who receives the goods, where they are stored, and the route from the delivery point to the floor - including lift dimensions and stair widths if panels must travel up.
We arrange freight by sea, air or rail with customs paperwork and door-to-door delivery, but import terms, duties and transit arrangements differ by project and destination. Put the agreed Incoterms, insurance responsibility and delivery address in writing for each order rather than assuming a standard arrangement.
6. Installation sequence and handover
Name the party installing the system - our site team or your contractor - and record who prepares the opening, who supplies fixings and sealants, and who protects the finished panels while other trades finish nearby. Note the order of work: track setting, panel hanging, alignment adjustment, then final cleaning.
At handover, capture a snag list per unit, the spare-parts items handed over, and the contact route for any later adjustment. For warranty coverage and response arrangements, keep the terms that apply to your specific order on file; published service claims vary between pages, so rely on what is stated in your own contract documents.
A short documentation checklist
| Record | Owner | Needed before |
|---|---|---|
| Room, function and user | Design team | Specification |
| Site-verified opening dimensions | Site contractor | Production release |
| Track, hardware and stacking layout | Supplier and designer | Production release |
| Signed finish sample with reference | Client representative | Production release |
| Crate labels matched to openings | Supplier and site | Dispatch |
| Installer, sequence and snag list | Project manager | Handover |
Procurement teams specifying wall systems for villa or hotel projects can send drawings, opening schedules and finish preferences to our project desk through the contact page, and we will confirm configuration options against your schedule.