A grey two-tone kitchen quotation can look complete on the first read and still be impossible to compare against a second one. Flat panel doors, glass display cabinets and an integrated appliance wall are priced differently by different workshops, so the numbers rarely line up until every line item is defined at the same depth. The checklist below follows the order we use when reviewing enquiries for light & dark grey modern kitchen cabinets, so a buyer can put two or three quotes side by side without guessing what is missing.
1. The layout drawing behind the price
Ask which drawing the quote was built from. A cabinet price taken from a mood image and a cabinet price taken from a dimensioned plan are not the same product. The plan should show wall lengths, run heights, the tall-appliance zone, and where the glass display cabinets sit relative to the working triangle.
- Upper and lower runs given as linear metres or as numbered modules — both work, but mixing the two across suppliers kills comparison.
- Corner and blind-corner units listed separately, with the internal fitting named (carousel, pull-out, open shelf).
- Tall cabinets shown where ovens, a refrigerator or a wine fridge will be recessed, including ventilation clearance.
2. Doors, carcass and the grey you actually receive
Grey is not one finish. Two-tone designs pair light grey uppers with darker lowers, and each panel can be finished in matte lacquer, acrylic, melamine, PVC wrap or wood veneer. Those differ in price, edge treatment and how the surface behaves near a hob.
- Surface material named for doors and carcass interiors, not just doors.
- Edge banding specified by thickness and colour match — thin mismatched edging is the fastest way for a flat panel front to look cheap.
- A physical door sample in the exact finish, because a screen render flattens the difference between matte acrylic and matte melamine.
- Handle or handleless detail stated; a handleless minimalist kitchen cabinet run needs profile, rebate or push-open hardware priced in the line item.
Board quality is usually described with words like stable, scratch-resistant and easy to clean. Ask what those words are attached to: board type, thickness, density grade and the supplier's own moisture rating for areas around the sink.
3. Glass cabinets, lighting and appliance integration
The glass sections in a two-tone grey kitchen carry most of the visual weight, and they are where quotes get vague. Each glazed unit should be itemised with the glass type, the frame finish, the shelf layout and the lighting.
- Glass specification: clear, frosted, bronze-tinted or fluted, plus aluminium or timber-framed front.
- LED strip quantity, driver location, colour temperature (warm white against grey reads softer than cool white) and whether the transformer is accessible for replacement.
- Under-counter task lighting on a separate line — it is often left out of cabinet quotes entirely and then added on site.
- Appliance recesses: which ovens, hob, extractor and refrigerator the carcasses are built around. Send the appliance model list before pricing, otherwise cut-outs get re-made.
Where a wine display is part of the design, check whether it is a lit glass cabinet with shelving or a temperature-controlled unit. Those are different products at very different prices, and both appear in the same render.
4. What sits outside the cabinet price
Worktops, splashbacks, sinks, taps and appliances are frequently quoted by others or excluded. Confirm in writing which side supplies them, and confirm measurement responsibility for stone.
- Worktop material, thickness, edge profile, cut-outs for sink and hob, and who takes the site template.
- Backsplash or splashback panels, including joint locations.
- Plumbing, electrical first fix and any structural work — normally the site contractor, but it should be named.
5. Commercial terms that decide whether the quotes are comparable
- Incoterms and delivery address. A factory price and a delivered price are not competitors.
- Packing method for glazed doors and mirrors, and how breakage in transit is handled.
- Payment stages and what triggers each production release; sign-off of the final drawing before cutting should be one of them.
- Production window stated as a range from an approved drawing, not from the deposit date alone.
- Snag list process, spare parts availability and what after-sales cover excludes.
For multi-unit work — apartment floors, serviced blocks, boutique hotel kitchens — ask whether the price holds across all units and how variation between floors is handled. Repeating one unverified detail across forty kitchens turns a small error into a project-wide one.
6. Matching the quote to the range you are buying from
Cross-check every line against the supplier's own catalogue pages. If the quote references a two-tone grey design, find that page and confirm the finishes, glass options and internal partition choices listed there are the ones being quoted. Our own kitchen pages show how far customisation goes on size, layout, panel colour and finish, from grey modern kitchen cabinets with an LED glass wine cabinet to custom minimalist kitchen cabinets for a home renovation. A quote that cannot be traced back to a real product page usually means the detail was invented during estimating.
- Dimensioned drawing attached and referenced by revision number
- Doors, carcass, edging and hardware named by material and finish
- Glass units and lighting itemised separately
- Appliance list confirmed on both sides
- Worktops, splashback and site trades allocated in writing
- Delivery terms, packing, payment stages and snag process stated
Send the drawing you have, the appliance list, and the finish you are aiming for. We price against that information rather than an image, so what comes back can be compared line by line with any other quote on your desk.