A wardrobe line item that reads "mahogany, built-in" will come back from three suppliers as three different products. If the joinery is for a villa bedroom wing or a hotel guest room floor, the brief needs to carry enough detail that every quotation lands on the same specification. Below is the checklist we work from when a buyer sends us a mahogany solid wood wardrobe enquiry, and what you should expect to see returned.
Start with the room data, not the finish
Finish decisions are easy to change on paper and expensive to change after cutting. Lock the shell first: finished internal dimensions at head, middle and foot of each wall; floor-to-ceiling heights at both ends, because slab levels rarely match across a long wall; the position of skirtings, architraves, switches, sockets and any radiator or pipework that a carcass has to clear; and the door swing, including whether a bedroom door pushes into the wardrobe run. Send the drawing set with room reference numbers so we can tie every wardrobe back to a room on your schedule rather than to a photo.
State what "mahogany" means for this project
Mahogany covers a wide band of species, colours and prices, and it behaves differently depending on whether it appears as solid timber, as a veneer over a stable substrate, or as a tinted finish on another wood. In the brief, name the part that must be mahogany — door fronts, drawer fronts, visible carcass edges, interior boxes — and name the part where a different substrate is acceptable. Our Solid Wood Wardrobes collection is offered with material and finish options specified per project, so this distinction is normal rather than unusual; what matters is that it is written down before quotation.
Then fix the appearance: grain pattern (plain-sawn or quarter-sawn look), colour tone against a sample reference, sheen level, and whether visible mineral streaks or colour variation are acceptable. A signed physical approval sample, kept on site with your project number written on the back, settles more arguments than any email thread.
Interior layout belongs in the brief, not in production
Hanging heights, shelf depths, drawer counts and the location of a mirror or ironing board change the carcass build, so list them per unit. Practical items to record: long-hang section for each wardrobe (guest rooms usually need one, master bedrooms two); shelf depth and whether shelves are adjustable; drawer widths and whether they sit above or beside the hanging rail; lighting in the cavity and where the transformer is allowed to sit; and any accessories you expect us to supply rather than your local joiner. Layouts can be tailored to each space, but only if the layout arrives with the enquiry.
Interface details that cause most site problems
- Cornice, scribe and filler: state whether the wardrobe meets a ceiling, a bulkhead or an open soffit, and who supplies the closing detail.
- Doors: hinged, sliding or open; reveal sizes; handle or push-open; and clearance needed for the chosen door type.
- Thresholds and floor finishes: give the finished floor build-up so the carcass base is set at the right height.
- Fire and safety interfaces: record any sprinkler head, detector or grille that falls inside the wardrobe footprint.
- Access route: lift car dimensions, stair widths and corridor turns decide whether a unit ships assembled or in panels.
For multi-unit jobs, ask for a numbered elevation pack — one drawing per wardrobe, marked with the room reference from your schedule — before production starts. That pack is also what your site team will use on installation day.
Commercial terms worth writing into the brief
State quantity and phasing up front, since a villa project releasing wardrobes in three bedroom wings quotes differently from one hotel floor released at once. Our custom and OEM service covers bespoke finishes and prototyping with flexible order quantities, so tell us whether you need a first article for approval before the balance is cut. Confirm what the price includes: packaging to your access route, freight to site or to port, spare doors and panels, and hardware make and model. As part of our turnkey furniture and building materials supply, we can carry production through delivery and installation, but the scope you write is the scope we price.
A short brief template that works
Send: project name and location; room schedule with wardrobe quantities; measured drawings or the architect's joinery details; the parts required in mahogany and the acceptable alternatives; approved finish reference; interior layout per unit; door type and ironmongery make; phasing and required on-site dates; access constraints; and your inspection point before shipment. With those items in one file, we can return a specification that matches what your architect drew, and you can compare suppliers on the same basis.
If you have a joinery package to price, send the drawings with room references and quantities and we will come back with a wardrobe specification built around them.