A sliding wall that divides a villa living room, hides a work corner or closes off a guest suite looks simple on site. The specification behind it is not. Before Santerson Partition Sliding Systems can be quoted and produced, someone has to decide what the wall must do, how large each panel may travel, and which finish carries through from the surrounding joinery. This guide sets out the measurements and project inputs that make that handover clean — the same list our design and production teams work from on villa, hospitality and office projects.
Start With The Job The Wall Has To Do
Dimensions alone produce a panel, not a working system. Write down the function first, because it changes the hardware, the panel count and the tolerances we need to allow.
- Divide one room into two usable spaces — a living area that becomes a sleeping space, a meeting room that opens onto a lounge. Panel height and travel length matter most here.
- Conceal storage or services — the wall closes an alcove or cupboard. Access clearance and handle detail lead the design.
- Screen without sealing — visual separation while light and air pass through. Panel infill and spacing become the decision.
- Match existing joinery — the wall should read as part of a fitted scheme, so finish, edge profile and grain direction have to align with the cabinetry already specified.
If you need sound separation rather than visual separation, that is a different product line. Santerson Acoustic Sliding Panels are configured for acoustic performance, and the target level has to be agreed for the selected build before production. State the requirement early so we quote the right system rather than adjusting one later.
The Measurements We Ask For
These listings are configurable, made-to-measure products, so there is no standard size to pick from a chart. Send what you have measured and we will confirm what the opening allows.
| Input | How To Take It | Why It Matters |
|---|---|---|
| Clear opening width | Measure the finished floor-to-floor or finished-wall-to-finished-wall span at three points across the opening, and record the smallest figure. | Sets total travel and the number of panels; an out-of-square opening changes the reveal on each end. |
| Clear opening height | Measure at left, centre and right of the opening after floor and ceiling finishes are in place. | Panels are built to the finished dimension; measuring before screed or flooring leaves the wall short. |
| Panel count and stacking side | Say which side the panels should gather on when open, and how many leaves you expect. | Determines panel width, pocket depth and how much wall the stack covers when parked. |
| Track position | Note whether the rail runs at ceiling level, floor level or both, plus clear ceiling height and any beam, duct or light fixture in that line. | Fixings need solid support; obstructions in the track line are the most common site surprise. |
| Substrate behind the run | Tell us what the rail and jambs fix into — masonry, framed partition, plasterboard or an existing built-in. | Fixing detail and packing depend on the substrate; it is decided before shipping, not on site. |
| Floor finish at the threshold | Identify the floor material across the opening and whether a recessed or surface-mounted track is acceptable. | Threshold detail has to suit the finished floor level and remain walkable. |
| Opening operation | Describe how the wall should move: bi-parting from the centre, all panels to one pocket, or a bypass arrangement. | Drives hardware selection and the clear space needed for the stack. |
| Finish reference | Send the finish name, sample, drawing note or the cabinetry schedule entry you want the panels to match. | Keeps the sliding wall consistent with the rest of the fitted furniture package. |
A floor plan, an elevation of the opening and a couple of photographs of the space in place tell us more than a single dimension. If the drawings are still moving, send the current revision and mark what is likely to change.
Project Inputs That Shape The Quote
Alongside dimensions, four project details decide how the work is packaged and priced.
- Quantity and repetition. One opening in a private residence is specified differently from the same wall repeated across guest rooms or office suites, where consistency of hardware and finish becomes the priority.
- Interface partners. Name the builder, fit-out contractor or designer coordinating the site. Track level, floor levels and handover dates get agreed with them, not with us alone.
- Programme. Give the required delivery window and the date the opening will be ready. Made-to-measure work has to be released against a real site sequence.
- Destination and access. Delivery address, port of entry, lift or stair constraints and any restricted access hours all affect packaging and container loading.
Where the wall is part of a wider interior package, Turnkey Interior Project Solutions cover design coordination, production, logistics, installation and after-sales support in one sequence, so the sliding wall is scheduled with the joinery, doors and finishes around it instead of arriving as a separate purchase order.
Related Configurations In The Same Collection
Partition walls rarely sit alone. These are the neighbouring configurations buyers most often specify alongside them:
- Santerson Closet Sliding Panels — for wardrobe and storage fronts, where access clearance and hardware choice lead the layout.
- Santerson Glass Sliding Panels — where daylight and sightlines matter; glass type and safety requirements are confirmed per project.
- Santerson Textured Sliding Panels — where the panel face itself carries the decorative effect.
- Wall Panel Systems — fixed panelling that keeps the sliding wall visually continuous with the rest of the room.
How The Specification Is Confirmed And Where To Send It
Send your measurements, drawings and finish references to the SANTERSON team through our Interior Design Services desk. You receive a proposal with layout, finish and hardware options; details and quotation are confirmed together; then production, shipment and follow-up follow. Track, hardware and opening dimensions are confirmed for each project before manufacture begins, so anything unusual about your opening is resolved on paper rather than on site.
If you are specifying from a drawing package that has not yet reached fixings, send it anyway. We will tell you which dimensions to lock and which can stay open until the fit-out stage.
A Short Checklist Before You Enquire
- Clear width and height of the opening, taken at three points, after finishes.
- Stacking side, panel count and how the wall should operate when open.
- Track line drawn on plan, with beams, ducts and lighting marked.
- Substrate behind the run and floor finish at the threshold.
- Finish reference matched to your joinery schedule.
- Acoustic requirement stated explicitly if separation is needed.
- Quantities, delivery address and required site-ready date.
Every Santerson sliding panel listing is configured per project. Dimensions, materials, hardware and safety requirements are confirmed for your specific opening before production, so treat published descriptions as a starting point rather than a fixed technical sheet.
Send your opening dimensions, drawings and finish references to the SANTERSON team and we will return a specification for Santerson Partition Sliding Systems that fits your project — coordinated with the joinery, doors and finishes around it.