A pocket door looks simple on a drawing. One leaf, one opening, no swing clearance, and the wall reads as a clean plane when the door is closed. That simplicity is exactly why proposals for Classic Pocket Doors are so easy to approve quickly — and so easy to get wrong. In a commercial fit-out, the door leaf is only one part of an assembly that includes the wall cavity, the track, the frame, the finish schedule and the trades who install all of it. This article walks through what a complete proposal should contain before you sign off on pricing.
Why pocket doors keep appearing in commercial scopes
Pocket doors solve a space problem that hinged and sliding surface-mounted doors cannot. They remove the swing arc, so circulation stays clear in tight corridors, bathroom clusters, meeting-room lobbies and guest-suite entries. They also let a wall finish run uninterrupted when the door is shut, which matters when the design intent is flush, minimal joinery rather than visible door furniture.
That is why they show up repeatedly in villas, serviced apartments, hotel guest rooms and office back-of-house areas: places where floor area is expensive and where a protruding leaf or an exposed sliding track would clash with the interior language. If your project also needs openings that disappear into the wall at other points, the same cavity logic applies to Santerson Flush Sliding Doors, and it is worth pricing those two items together rather than as separate line items from separate suppliers.
What a complete proposal should state
Before comparing prices, check whether the proposal actually answers the questions an installer will ask on site. A quotable proposal for made-to-measure pocket doors normally covers the following:
- Opening and leaf dimensions. Clear opening width and height, leaf thickness, and how each dimension was measured — from the structural opening or from the finished lining. Ask for a dimensioned drawing, not a table of sizes alone.
- Wall cavity build-up. Total wall thickness required, including track housing and frame. A pocket door needs the full leaf depth plus hardware clearance; if your partition build-up is thinner than the assembly, the proposal should say so now rather than on site.
- Track, hangers and stop details. Track type, mounting method, number of hangers per leaf, and whether floor guidance or a bottom stop is included. These items decide how the door behaves after a year of daily use.
- Frame and architrave finish. Material, edge detail and how the frame meets the wall finish. Where the surrounding wall is clad in Wood Panel Partitions or a stone-look panel, the frame detail has to be drawn against that specific finish.
- Leaf surface and colour reference. The exact finish name, board or veneer construction, and a physical sample reference. For matched joinery, ask for the same finish code used on your cabinetry and wall panelling.
- Hardware exclusions. Pull handles, recessed pulls, locks, door closers and any access-control cutouts are frequently quoted separately or left out entirely. State who supplies them.
- Schedule by room. A door schedule listing each opening by room number with quantity, hand/side of pocket, and finish. Without it, site substitutions become inevitable.
If any of these are missing, the low price you are looking at is almost certainly an incomplete price. Send the list back as a clarification request before the tender closes.
Reading the product data honestly
Manufacturer pages for made-to-measure doors are deliberately short: they confirm that sizing, layout and finish are specified per project, and they ask you to confirm dimensions and selected specifications for each order. That is a feature of custom manufacturing, not an omission. It means the responsibility for accurate dimensions sits with whoever issues the shop drawings, and it means two identical-looking doors can carry different prices depending on cavity depth, finish and hardware.
The same caution applies to finish names. A wood-veneer leaf ordered for a guest-room corridor should be specified with the veneer species, cut direction and lacquer sheen written out, because those three variables change appearance far more than the word "veneer" suggests. If your proposal simply says "wood veneer, as shown", ask for the sample before award.
Comparing suppliers on scope, not unit price
Commercial projects rarely buy doors in isolation. The table below shows how a narrow door-only quotation differs from one issued by a supplier covering the wider fit-out.
| Item to check | Door-only supplier | Fit-out supplier |
|---|---|---|
| Finish matching to cabinetry and panelling | You coordinate samples between two or more vendors | One finish schedule covers doors, joinery and wall surfaces |
| Shop drawings | Door opening only; wall build-up is someone else's drawing | Opening, pocket cavity and adjacent finishes drawn together |
| Shipping and packaging | Separate consignment, separate container cost | Consolidated with other joinery and fixtures in one shipment |
| Responsibility for snags | Split between door vendor, framer and finisher | Single point of contact for the assembly |
A fit-out supplier is not automatically cheaper per leaf. It usually costs less in coordination hours and rework, which is where pocket-door budgets actually leak. When we talk with project buyers about Turnkey Interior Project Solutions, the doors are specified alongside cabinetry, wall systems and bathroom fixtures precisely so that one drawing set governs all of them.
Five questions to put in writing before award
- Confirm the required wall thickness for the proposed track and frame, and tell us whether your partition build-up meets it.
- State which hardware is included and which you expect us to supply locally.
- Provide the door schedule by room number, with quantity and pocket side for each opening.
- Name the finish reference and confirm whether a physical sample will be issued before production.
- Confirm who prepares the shop drawings and who signs off the dimensions.
These five answers let you compare two proposals on the same basis. They also protect the site programme: pocket-door problems discovered after the wall is closed are demolition jobs, not adjustments.
Where to take it next
If your project needs made-to-measure pocket doors as part of a wider joinery and finishes package, send us the door schedule and the partition build-up. We will confirm the cavity requirement, the finish reference and what sits outside the quotation before pricing — so the number you approve is the number that arrives on site.
SANTERSON has manufactured furniture and building materials since 2008 and supplies project packages covering custom joinery, interior doors, wall systems, fixtures and finishes, with production coordination, consolidated shipping and installation support arranged for each project.