A media wall that mixes open shelving with closed cabinetry looks simple on a drawing. In practice it is where design intent and procurement reality most often diverge: the designer is thinking about proportion, display and sightlines, while the buyer is thinking about lead time, packing, site access and who confirms the final dimensions. When both sides specify the same thing, Santerson Open & Closed Combo Units can be produced to the space instead of being forced to fit it.
Where the two sides usually disagree
The most common gap is not style. It is what "made to measure" actually covers at the moment the order is placed. Design drawings often show a combo unit as a single elevation with open niches, closed doors and a TV recess all resolved. Procurement then has to translate that into a production list: which bays are open, which are closed, which doors swing and which slide, where services sit behind the panel, and what the finished projection from the wall will be.
A second gap is vocabulary. A drawing may label one element "media unit", another "storage wall" and a third "modular system". If those labels are carried into the order without a matched specification, three similar items can arrive specified to three different standards. Our catalogue keeps these collections separate on purpose — Santerson Mixed Open & Closed Systems for modular living arrangements and Santerson Mixed Open & Closed Storage for integrated wall systems — so the specification references a defined family rather than a mood-board term.
The design side: what to fix before anyone quotes
Storage split, not just elevation. Decide how much of the unit is genuinely for display and how much has to hide everyday items. Open niches read as light and generous but show clutter immediately; closed fronts keep a living room or guest room tidy but add door weights, hinges and clearances. A combo unit only works if that ratio is decided deliberately.
Proportion and the TV recess. Screen size sets the opening, and the opening then constrains the bays either side of it. Fix the screen you intend to install, the mount type and the finished outer edge of the recess, so the framing around it is drawn to that dimension rather than assumed.
Services behind the panel. Power, network, aerial or HDMI routes are easy to draw and easy to lose between drawing issue and site. They should be shown on the same sheet as the unit, with their positions dimensioned from a fixed wall line.
Finish continuity across trades. Where the unit meets wall panelling, flooring or an adjacent wardrobe run, the designer should name the finish once and reuse it. A combo unit specified in isolation is the fastest way to end up with three close-but-not-matching shades on one wall.
The procurement side: what buyers need confirmed in writing
Dimensioned opening sizes and site conditions. Finished room dimensions, wall flatness and the position of skirtings, architraves and services determine whether a made-to-measure unit sits flush. These should be surveyed, not inherited from an architectural drawing alone.
A configuration list per bay. Each open bay, closed bay, drawer bank and door should appear once in the order, with its size and hardware. That list is what protects both sides at handover.
What is excluded from supply. Screens, appliances, electrical fittings and lighting are frequently shown on a design but supplied by others. Listing exclusions early prevents a completed unit sitting waiting for somebody else's equipment.
Delivery route and pack size. A full-height side panel is limited by lift dimensions, stair turns and door widths at the site. Pack sizes should be checked against the access route before the panels are cut.
The alignment checklist
- One agreed name for the unit, carried from drawing to purchase order.
- Open-to-closed ratio decided by the designer and recorded on the elevation.
- Screen size, mount type and recess dimensions fixed before quoting.
- Services positions dimensioned from a fixed wall line on the same drawing.
- Finish named once and shared with panelling, flooring and joinery packages.
- Site survey of finished dimensions and access route before manufacture.
- Exclusions stated in writing: screens, appliances, electrical and lighting.
How a single supplier reduces the gap
When design coordination, manufacturing and delivery sit with one party, these decisions stop being handovers. SANTERSON works as a one-stop furniture and building materials supplier for villa, hospitality and office projects, covering design consultation and space planning, material selection and product specification, production and quality control, project management and site coordination, through to installation and handover. The same team that cut the panel also answers the question about the hinge on site.
For Australian work this matters more than usual: the published project references include villas in Willoughby, Perth, North Turramurra, Melbourne and Sydney, where a combo unit has to travel by sea, clear an access route and be installed against finishes set by other trades. Turnkey interior project solutions keep the specification, the manufacture and the site coordination under one point of responsibility rather than three.
Before you issue the enquiry
Send the elevation, the room's finished dimensions, the intended screen size and the finish schedule together. That single step removes most of the arguments that would otherwise appear after production has started.
For project-specific sizing, finish options and configuration review, contact SANTERSON — PHILLIP, +86-13928214007, santerson@qq.com — or use the contact page.