A corner wardrobe arrives on site in dozens of panels, rails, tracks and hardware sets. If the packaging is not agreed before production, the same order can reach the project as three separate deliveries, a crate of damaged mitred corners, or a full container whose panels will not pass through the bedroom door. Below is what buyers should confirm about packaging for sliding door corner wardrobes — from carton construction and component labelling right through to the container plan.
Why a corner wardrobe is harder to pack than a straight one
A built-in wardrobe for a straight wall is a run of identical carcasses. A corner unit is not. The returns, splayed or radius ends, bridging panels and the two door tracks meeting at an angle are all unique pieces cut for one specific opening. Two consequences follow directly:
- The geometry is unforgiving. Panels cut to a project-specific angle cannot be trimmed on site to fix a chipped edge, and a replacement part means a second sea shipment.
- The pieces are awkward. Long vertical panels, wide sliding leaves and deep corner carcasses travel badly in standard flat furniture cartons, so the pack design has to follow the parts rather than the other way round.
Because our corner wardrobes are made-to-measure — size, layout, material and finish specified per project — the packaging is part of the specification. It is drawn up with the shop drawings, not improvised at the end of production.
Confirm the pack design before production starts
Ask for the packing list and carton drawing together with the shop drawings for approval. Reading them side by side is where most problems get caught.
| Item to confirm | What a good answer looks like |
|---|---|
| Carton construction | Thick-walled five-ply export cartons with edge protectors and corner boards; sliding leaves and glass-fronted leaves packed vertically in their own sleeve, never stacked flat on top of carcass panels. |
| Internal protection | Foam or EPE between finished faces, sealed edges protected against rubbing, hardware boxed separately so screws and cam locks cannot bruise a panel through the carton wall. |
| Moisture control | Desiccants and a vapour barrier inside each carton, plus container liners for long sea passages — relevant to any board-based built-in, not only ours. |
| Marking and labelling | Carton numbers keyed to the shop drawings, room or unit name on every carton, and a "this face up / do not stack" mark on crates holding doors and glass. |
| Weight per carton | Each carton within a handling limit your own installers can carry upstairs — an over-weight crate is what turns a two-person job into damage. |
Component labelling has to match the drawings, not the invoice
A sliding door corner wardrobe goes together in a fixed sequence: corner carcass first, then bridging panel, then rails and tracks, then the leaves last. If the labels only carry purchase-order numbers, the fitter on site has to reverse-engineer that order from a stack of identical boxes.
- Every carton marked with the drawing reference for the parts inside it.
- Hardware kits bagged and labelled per sub-assembly (carcass, rail set, leaf set), not one bulk bag of fittings.
- A printed assembly sequence sheet and a copy of the elevation drawings packed in the first carton.
- For multi-unit projects, unit or apartment number on every carton so crates for different rooms never end up on the same floor.
Door leaves, glass and finishes need their own crate plan
The doors are the visible part of the order, and they are also the most fragile. Sliding leaves in a high gloss lacquer or a glass-fronted frame travel vertically on edge with padded separators; mirror and glass leaves get an additional timber-framed crate. Confirm how many leaves share one crate, whether the crate is braced for lateral movement, and that the crate is marked as fragile on all four faces rather than just one.
Finish choice also affects protection. A matte or textured surface shows handling scuffs differently from a high gloss one, so state the finish on the packing specification sheet — we match the protective interleaving to the selected finish when the order is confirmed.
Container planning: consolidate, but keep the sequence intact
As a door-to-door delivery and logistics service provider, we load wardrobe components with the rest of the fit-out rather than shipping each product line on its own. For corner wardrobes that means two things to agree in advance:
- Load sequence. Crates needed first at site — carcasses and rails — loaded so they come off first, doors and glass not buried under flooring or cabinetry cartons.
- Container mix. Whether the wardrobes travel with other custom bedroom cabinetry, joinery and fixtures in one consolidated container, and who prepares the commercial invoice, packing list and customs paperwork for that mix.
For villa and apartment projects we quote global freight forwarding by sea, air or rail, with customs paperwork and container loading prepared together with the packing list; which mode is used depends on the project schedule and destination, so it is confirmed per order rather than assumed.
Inspection on arrival: what to check before signing
- Carton count against the packing list, before the crates move off the truck.
- Photographs of any crushed corner, split carton wall or wet staining, taken at the tailgate.
- Crate seals on glass and mirror leaves intact.
- One carton opened at random to confirm labels match the shop drawings.
Report damage with those photographs against the shipment reference the same day. Our installation and after-sales support covers spare parts and replacement panels; how quickly a replacement is produced and shipped depends on the part and the freight mode, so we confirm that per case instead of promising a fixed turnaround.
Frequently asked questions
Do you pack corner wardrobes in one carton per room?
No. A corner unit is split into as many cartons as its panels and hardware require, all numbered against the same drawing reference so the sequence stays clear on site.
Can the packaging be changed to suit our own site handling?
Yes. Smaller cartons for narrow staircases or a goods lift, different crate sizes, and per-unit labelling are all set during order confirmation — tell us the access constraints with the drawings.
Who is responsible for packaging to the port versus to the site?
The packing specification is the same; what changes is the freight leg. We handle export packaging, container loading and paperwork, and agree delivery scope to your site address case by case.
Send us the room elevation or your joinery drawing and we will return the shop drawings for the wardrobe together with its carton plan and packing list, so packaging is agreed before a single panel is cut. Enquiries go through our contact page, where enquiries receive a response within 24 hours.