A bathroom package only moves from drawing to installation when the reviewer can see what is being supplied, how it fits the room and who confirms each interface. A product submittal does that job for the Santerson Integrated Countertop Vanity. Because this piece is made to measure rather than ordered off a shelf, the submittal has to carry the specification itself — dimensions, materials, basin and countertop arrangement, storage layout and the services that sit around production. Below is the package we recommend assembling before approval, written for specifiers, contractors and procurement teams working on residential bathroom projects.

1. Identification and scope of supply

Start with the boring part that prevents most disputes. The submittal should name the product exactly as it appears in the order, list the rooms or bathroom types it applies to, and state clearly which items are inside the package and which are not. An integrated countertop vanity covers the carcass, doors and drawers, the countertop and the basin arrangement; wall finishes, mirror cabinets, lighting, taps, waste fittings and tiling normally sit with other trades.

Write that boundary out. When a reviewer can see at a glance that the mirror cabinet or the vanity light is outside this line item, they stop asking for information that was never part of the order, and the pricing comparison between suppliers becomes an apples-to-apples exercise.

2. Made-to-measure dimensions and room interfaces

Configurable pieces in our interior fixtures range are built to the opening, not to a fixed catalogue width, so the submittal needs dimensioned drawings rather than a single reference image. For each vanity show overall height, width and projection; the finished front elevation; the plan view with door and drawer swing; and the setting-out dimension from at least two fixed references on site.

Then draw the interfaces that commonly cause rework: waste outlet position and type, tap hole positions relative to the basin, clearance for drawers opening over a skirting or plinth, and the distance to any adjacent wall, door reveal or shower screen. If the vanity meets a tiled wall, record the wall finish build-up so the carcass depth still works after tiling. State whether dimensions are given in millimetres and which face is taken as the finished surface.

3. Countertop and basin arrangement

The countertop is where an integrated design earns or loses its clean look, so specify it separately. The submittal should record the surface material and finish, slab thickness and edge profile, the fall on any wet surface, and how the upstand meets the wall. Our stone and marble surfaces are supplied to project dimensions, so a marked-up drawing of the cut is more useful than a photograph of a previous job.

For the basin, state which arrangement applies to this bathroom. An integrated basin reads as one continuous surface with no rim joint to seal; an undermount basin sits below the counter with the top left exposed around it; a vessel basin rests above the counter and raises both the tap height and the mirror height. For two basins sharing one top, as in our double basin countertop, record the basin centres, the distance from each centre to the nearest end, and where the waste and overflow sit. These are the numbers the plumber sets out on site.

4. Carcass, doors, drawers and finish schedule

List the substrate, the door construction and the finish for every visible face, including the inside of a door that opens against a wall. Name the hardware — hinge type, slide type, handle or push-to-open detail — and note whether soft closing is included. Because the double vanity and floating vanity in the same collection are configured the same way, a finish schedule that repeats for each bathroom type removes any guesswork about which room gets which specification.

Storage planning belongs here too. Show what sits behind each front: shallow drawers at the top, deep storage below, a cut-out drawer where the waste drops, and whether a tall unit or linen cabinet is being ordered alongside to carry what the vanity cannot.

5. Mirror cabinet, lighting and electrical details

Anything with a lamp or a driver needs its own line in the submittal. If the package includes an LED mirror cabinet, record the light source, where the supply point and isolator sit, and who is responsible for the circuit. The same applies to vanity lighting and other wall sconces in the bathroom: note mounting height, fixing method and the zone the fitting is expected to sit in.

Do not assume the electrician knows what you intend. A short schedule listing each item that needs a connection, with its position on the setting-out drawing, is enough to keep the electrical rough-in and the joinery delivery in step.

6. Manufacturing route and quality checks

For made-to-measure work, the submittal should say how the item will be produced and what is checked before it leaves. Our custom and OEM service covers bespoke finishes, textures and dimensions, so the approved sample or prototype reference belongs in the document — a finish board number, a photographed sample, or a signed-off first piece. Production inspection points and the packaging method follow on the same page, since bathroom joinery is easily damaged between the container and the bathroom door.

7. Logistics, delivery sequence and installation

Countertops and vanity carcasses rarely arrive at a convenient moment, so the submittal should state the handling plan: logistics and door-to-door delivery arrangements, packaging for stone tops, the delivery address, and who receives the goods. Then state the installation sequence and responsibility — installation and after-sales support, on-site guidance, snag inspection at handover, and how spare parts or replacement components are requested later.

A simple approval block at the end — consultant, contractor, client representative, date — is what turns the document into a controlled record rather than a brochure with measurements added.

A quick pre-submission check

  • Product named exactly as ordered, with rooms and quantities listed
  • Scope boundary stated: what is included, and what taps, waste, tiling and lighting are excluded
  • Dimensioned elevations, plan view and setting-out from two fixed site references
  • Countertop material, thickness, edge profile, upstand detail and cut drawing
  • Basin type confirmed as integrated, undermount or vessel, with centres and waste positions
  • Finish schedule for every visible face, plus named hinges, slides and handles
  • Electrical schedule for mirror cabinet and vanity lighting, with supply points marked
  • Approved finish sample or prototype reference attached
  • Delivery sequence, packaging method and installation responsibility written down

Send that package and the review normally comes back with comments on two or three lines instead of a rejected shop drawing. If you are specifying bathroom joinery for a villa or apartment project and want the submittal prepared from your drawings, contact our team with the room layouts and we will return dimensioned proposals for each vanity type.