A swim spa quotation for a hotel, resort or residential development is easy to approve on paper and hard to approve on site. The shell looks identical in every proposal; the differences that decide budget, programme and handover sit in the line items around it — power, structure, access, water treatment and who carries each of them. This guide takes one catalogue model, the Outdoor Swim Spa WS-PC05ST, and walks through how to read its proposal line by line: what each figure covers, which scope items are usually missing at quotation stage, and what to ask the supplier so that two or three bids can be compared on the same basis before you sign.
What the model designation actually tells you
SANTERSON lists the PC-series swim spas as configurable outdoor swim and hydrotherapy units, which means the base shell is fixed but the equipment around it is selected per project. Before treating any number in a proposal as final, read it against the published catalogue entry for the exact model.
| Catalogue item | What appears on the WS-PC05ST listing | What to confirm in your quotation |
|---|---|---|
| Overall size | 5000 × 2400 × 1470 mm | Whether the figure is shell only or includes steps, coping and plant access |
| Control system | 1 set | Location of the control panel and who supplies the remote/off-site mounting |
| Swim training system | 1 set | Type of swim unit and required water flow for the intended use |
| Filter pump | 1 pc | Filtration cycle time and whether a second speed or separate circulation pump is quoted |
| Jets | 6 pcs | Jet layout drawing, and whether jet positions conflict with the swim lane |
| LED lights | 4 pcs | Fitting positions and low-voltage supply arrangement |
| Ozone | Listed as a shown feature | Whether ozone is included in the quoted configuration or offered as an option |
| Total power | 6.55 kW | Whether this covers heating, or only pumps, jets, ozone and lighting |
The same catalogue page also notes that the water pump is not listed for this model, and that options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps vary by configuration. That note matters more than it first appears: two quotations carrying the same model number can sit far apart in price depending on which of those options are inside the box.
Read the specification as a scope boundary, not a product sheet
Commercial buyers usually receive the equipment specification and then assume the rest of the works are covered elsewhere. They are not. Split every proposal into three columns before you compare prices.
- Supplied by the spa manufacturer: shell, cabinet, control system, swim training unit, filtration, jets, lighting, ozone or optional sterilisation, plus any quoted heat pump and insulation package.
- Supplied by others on site: structural support to the finished level, power distribution and isolation, drainage, water top-up, deck or surround finishes, handrails and steps where local access rules apply.
- Still open at quotation stage: freight mode and Incoterms, import clearance, offloading equipment, crane or forklift needs, and installation supervision.
If a proposal shows only the first column at a competitive price, it is not cheaper — it has moved cost into your main contractor's package. Ask each supplier to state which column every line item belongs to.
Power and services: where commercial swim spa budgets break
A published total power figure is a starting point for the electrical engineer, not the end of the discussion. Work through these points in writing with the supplier and your electrical consultant.
Electrical
- Confirm the supply arrangement required on site: phase, voltage, dedicated circuit ratings, and the location of the isolator relative to the spa.
- Ask whether heating load is included in the quoted power. If a heat pump is an option, request its input and output figures separately so the engineer can size both tariffs and generation.
- Request the wiring diagram, protection requirements and any residual-current or surge provisions the manufacturer expects.
- Check control-panel placement against guest experience: a panel in a poolside plant cupboard still needs to be reachable for routine settings changes.
Structure, access and drainage
- Confirm the finished load case with your structural engineer, including water volume plus occupant loading, and whether the unit is above ground, semi-recessed or fully recessed.
- For a recessed installation, agree inspection access on at least the pump and filter side before the surround is built — retrofits through finished decking are expensive.
- Confirm site access for delivery. A 5-metre shell reaching a rooftop terrace, courtyard or basement plant room changes the logistics plan, not just the freight cost.
- Agree overflow, drain-down and top-up arrangements, and who provides them in each phase of the programme.
Water treatment and daily operation
- Ozone is listed on this model; UV sterilisation appears as an option. Decide which one the operator actually wants, and confirm what disinfection remains their responsibility.
- Ask for the recommended filtration run time and chemical dosing regime so operating cost can be modelled over the asset life, not just at handover.
- If the spa will sit outdoors through a cold season, ask which insulation package and cover are quoted, and how heat retention is stated.
Useful specification questions for the supplier
Send the same short list to every bidder. It turns three different-looking proposals into one comparable set, and it surfaces omissions early.
- Is the quoted price EXW, FOB, CIF or delivered to site — and what is excluded from that term?
- Which options are included in this configuration, and what does each option cost if added later?
- Can you provide dimensioned drawings showing shell, service access, control panel and step positions?
- What installation supervision or on-site guidance is provided, and in what form?
- Which spare parts are stocked, how are they shipped, and what is the warranty scope for shell, equipment and lighting?
- If the project needs a different length or layout, which variants apply — for example the longer WS-PC05ST-L, the compact WS-PC05ST-S, or a wider format such as WS-PC07A — and how do their published dimensions change the deck design?
Where a project needs a non-standard footprint, ask about the customizable shape outdoor spa range instead of forcing a catalogue model into an awkward plan. Custom geometry costs more in engineering review but often saves structural rework.
Coordinate the swim spa with the rest of the outdoor package
A swim spa rarely appears alone on a hospitality or villa project. It sits beside loungers, shade structures and hard landscaping, and those items share a deck level, a drainage fall and a maintenance route. Buying them from separate suppliers multiplies interface risk: lounger footprints that mark the wrong surface, a pergola post that blocks plant access, or finishes that cannot tolerate chlorine drift.
Working with a one-stop furniture and building materials supplier lets the pool deck, sun loungers, shade structures and adjacent interior finishes be coordinated against one drawing set and one shipment plan. The swimming pools and swim spas range can then be scheduled together with the surrounding outdoor furniture and, for resort work, the guest-room and spa-interior fit-out. For an overseas development, that coordination also covers freight consolidation, customs paperwork and staged delivery — see logistics and door-to-door delivery and installation and after-sales support.
For project teams sourcing internationally, the practical advantage is a single point of contact across turnkey project solutions: one specification register, one set of shop drawings to review, and one party accountable when an item arrives late. That matters most on long-haul jobs — the Australian villa and hotel schemes we work on regularly run through this same sequence, from specification sign-off to staged delivery on site.
A simple scoring sheet before you award
| Criterion | Evidence to demand |
|---|---|
| Scope clarity | Line items marked manufacturer / contractor / open, with exclusions stated in writing |
| Technical completeness | Dimensioned drawings, electrical diagram, filtration and treatment regime, options list priced |
| Programme fit | Production lead time, freight mode options, delivery window tied to your site sequence |
| Site feasibility | Access route confirmed, structural load case agreed, plant access maintained |
| Lifecycle cost | Energy figures separated by function, consumables and spares priced, warranty scope defined |
| Accountability | Named project contact, documented coordination steps, after-sales route for faults |
Two checks worth doing before you sign. First, put both proposals side by side with the published catalogue entry for each model and highlight every figure that differs — dimensions, jet count, power. Differences are not errors; they show where the configuration changed and what it now costs. Second, ask your structural and electrical consultants to mark up the proposal as if it were a construction document. Whatever they cannot size is what you still need from the supplier.
Frequently asked questions
Is a 5-metre swim spa long enough for hotel fitness use?
It depends on the guest profile. A 5000 mm shell with a swim training unit suits short continuous swims, hydrotherapy and supervised sessions. If your brief calls for longer training sets, compare the longer variants or the larger catalogue models rather than over-specifying the deck around one unit.
Should ozone be standard or optional on a commercial unit?
Treat it as a decision, not an assumption. Ozone reduces the disinfectant load but does not remove the operator's dosing and monitoring duties. Where water quality targets are strict, ask whether UV sterilisation is offered alongside ozone and what each option adds to the quoted price.
Can the same model be used indoors and outdoors?
The catalogue presents this range as outdoor swim and hydrotherapy units. Indoor installation changes ventilation, humidity control and drainage requirements, so confirm the arrangement with the supplier and your services engineer before adopting an outdoor specification inside a building.
What is the biggest risk in an overseas swim spa purchase?
Interface gaps rather than product quality: nobody owning the power supply, the recess structure, or offloading at a restricted site. Close those gaps in the quotation stage with written scope boundaries, and consolidate related outdoor and interior items with one supplier so interfaces are resolved once instead of repeatedly.
Send us your swim spa enquiry with the model reference, site photographs and your target installation level. We will confirm which configuration options apply, provide dimensioned drawings and quotation terms, and coordinate delivery with the rest of your project package.