A request for quote for aluminum honeycomb panel usually comes back with a number, not an answer. Two suppliers can price the same elevation very differently because one quoted a heavier skin on a different alloy and the other quoted a lighter skin, a different finish system and a subframe nobody mentioned. The difference is rarely dishonesty — it is missing information in the enquiry itself.
Aluminum honeycomb panel is a sandwich: two aluminium face sheets bonded to an aluminium honeycomb core. That construction is what gives you a large, flat, stiff sheet at a fraction of the weight of solid plate, which matters on facades where every kilogram loads the fixing system and every handling crew on site. It also means the quote depends on details that generic cladding RFQ templates never ask for. Below is what to put in your enquiry so the prices you receive are actually comparable.
1. The panel build-up, stated explicitly
Do not write "aluminium honeycomb panel, 25 mm". That single number tells a supplier nothing about what you are buying. Break the thickness into its three parts.
- Face sheet thickness — skin gauge on both sides, and whether the two skins are the same gauge or the outer one is heavier.
- Total panel thickness — 10 mm, 15 mm, 20 mm, 25 mm and above are all ordinary configurations; thicker panels carry larger core height and more bending stiffness.
- Core cell size and foil thickness — the honeycomb cell dimension and the gauge of the aluminium foil in the core. These drive weight and cost more than most buyers expect.
- Alloy and temper of the skins — state what your engineer specified rather than leaving it to the factory's default.
If you do not have a specification yet, say so and give the panel size plus the application. A manufacturer who makes cladding as a standard product line will propose a build-up and tell you why. That is a better starting point than inventing numbers to sound technical.
2. Panel dimensions, and the maximum sheet you can actually accept
Give the panel widths, heights and the largest single panel on your elevation drawings. Flatness across a large panel is the real engineering challenge with honeycomb — the material's advantage is that it keeps a flat surface at large sizes, but only within what the factory's line and the chosen build-up can hold.
- Send the setting-out drawing or a marked elevation, not just a square-metre total.
- Ask for the maximum panel size available at your specified thickness, and the maximum weight per panel for handling on your site.
- State whether panels are rectangular only, or whether you need radiused, curved, folded or cut-to-shape pieces.
3. Surface finish and colour system
The finish is where exterior durability is decided, and it is the most common place quotes go wrong because buyers write "silver" or "grey".
- Name the coating system: PVDF/fluoropolymer for external exposure, polyester for controlled internal use, anodised, brushed, mirror, wood-grain transfer or a natural stone veneer laminate.
- Give the colour reference — RAL code, Pantone, or a physical sample you already hold. For metallic and pearl shades, say so; they cost more than flat colours.
- For stone-finish honeycomb panel, specify the stone type and the veneer thickness, because the face construction changes with it.
- State gloss level and any directional grain, and whether interior and exterior panels share one finish or two.
Exterior work in coastal or high-UV exposure needs a coating system chosen for that environment. Ask the supplier which finish they use on their own facade projects and what has been specified before — do not assume an interior-grade coating will be substituted unless you have said which side of the building each panel goes on.
4. Fabrication scope: does the price include the finished cassette?
This is the single biggest source of incomparable quotes. A panel supplied flat and a fabricated cassette ready to fix are different products.
| Item | Ask for it explicitly in the enquiry |
|---|---|
| Cutting and sizing | Panels cut to the setting-out drawing, with tolerances stated. |
| Folding / return legs | Whether panels are formed into cassettes (truncated pans) or supplied flat for site folding. |
| Stiffeners and inserts | Back stiffeners, threaded inserts, angle brackets bonded or mechanically fixed to the panel back. |
| Edge treatment | Open or closed edges, exposed core on reveals, sealant joints versus mechanical joints. |
| Cut-outs | Openings for lights, vents, handles and brackets, dimensioned from a fixed face. |
| Perforation | Hole pattern, open area percentage, perforated face on one or both sides, backing fleece if acoustic performance is wanted. |
| Protection film | Laser-marked or printed protective film with panel marks matching the drawing. |
Also ask what is not in the price. Subframes, brackets, rails, anchors, sealants, flashings and trims are frequently quoted separately — and if one supplier includes them and another does not, your comparison table is meaningless.
5. Fixing system and interface with the substrate
Cladding panels do not stand up by themselves. Tell the supplier what exists on site and what you expect them to provide.
- Substrate type: masonry, concrete, steel frame or existing wall build-up, and whether a cavity and insulation layer sit behind the panels.
- Fixing method you prefer: ventilated rainscreen subframe with clip-on cassettes, mechanically fixed open-joint panels, or adhesive on a prepared internal background.
- Who designs the subframe — the supplier, your facade engineer, or a local installer. If the supplier is designing it, send wall sections and the drawing scale.
- Whether you need samples of the assembly: a fabricated corner panel, a mock-up panel, or a full sample bay for approval before production.
A mock-up or sample panel is worth requesting on any facade package. It settles colour, joint detail and flatness questions while they are still cheap to change.
6. Performance requirements you actually need documented
Honeycomb panel is specified for fire behaviour, weathering, sound and weight in real projects. Write down which of these your specification calls for, and ask the supplier to supply documentation rather than adjectives.
- Fire performance — the reaction-to-fire classification required by your specifier, and which test reports support the exact build-up being quoted, including the core and any adhesive.
- Weathertightness and coating durability — the coating standard applied and the warranty or tested exposure basis offered for the external finish.
- Acoustics — if perforated panels are used internally, the sound absorption data with the backing arrangement stated.
- Wind load and structural check — panel spans, load on fixings and deflection limits, checked by whoever is responsible for facade design.
Do not accept "fireproof" or "weather resistant" as an answer. Ask which report, which build-up it covers, and whether that build-up matches what is being quoted to you.
7. Quantities, phasing and the split between exterior and interior
Honeycomb panel goes onto both sides of the building envelope in most projects — facade and curtain wall outside, wall decoration and partition panels inside. Prices move with volume and with how many different finishes you are asking for at once.
- Total square metres by finish and by thickness, not one combined figure.
- The count of unique panel sizes; a job with 12 repeated modules is cheaper than one with 90 single-use panels.
- Whether interior and exterior panels are ordered together or in separate phases.
- Any spares quantity you want held, and whether replacements can be matched to the original batch later.
Colour matching across production batches is a genuine risk on large facades. Ask for the production batch plan, and order enough panels for one run where the elevation is visible together.
8. Packaging, delivery terms and site logistics
Large flat panels are damaged in transit more often than they are made wrong. Specify what you need before the price is fixed.
- Packaging standard: vertical or horizontal racking, edge protection, moisture barrier, and whether panels are marked to match the drawing.
- Delivery term — FOB, CIF or door-to-door — and who handles customs clearance and import formalities. A supplier running logistics and door-to-door delivery can quote freight and paperwork in the same package rather than leaving you to arrange it.
- Container type and loading plan, plus how panels are separated so cassettes do not travel face-to-face.
- Unloading arrangements at your site: crane, forklift or manual offload, and access limits on panel length.
9. Commercial terms worth locking down in the enquiry
- Price validity period, and which currency.
- Payment stages and what triggers each one; ask for the production schedule alongside them.
- Lead time from approved drawings, and what is on the critical path: coating, stone veneer supply or core production.
- What happens if colour or flatness fails inspection — rework, replacement and who pays freight.
- Documentation delivered with the goods: packing list by panel mark, test reports, installation drawings.
A short RFQ checklist you can paste into your enquiry
| Section | What to state |
|---|---|
| Project | Building type, location, interior and exterior areas involved. |
| Panel build-up | Skin gauge, alloy/temper, total thickness, core cell size, foil gauge. |
| Sizes | Setting-out drawing, max panel size, max weight per panel, unique-size count. |
| Finish | Coating system per side of the building, colour reference, gloss, grain direction, stone or wood finish if used. |
| Fabrication | Cassette or flat, returns, stiffeners, inserts, cut-outs, perforation, edge condition. |
| Fixing | Substrate, subframe responsibility, joint type, cavity and insulation behind panels. |
| Performance | Required fire class, coating durability basis, acoustic data if perforated, structural check responsibility. |
| Quantities | Square metres by finish and thickness, phasing, spares. |
| Logistics | Packaging standard, delivery term, container plan, site offload method. |
| Commercial | Currency, validity, payment stages, lead time from drawing approval, non-conformance handling. |
Related products on the same envelope package
Facade and interior cladding rarely sit alone in a bill of quantities. If you are already buying aluminium panel for external walls, the same supplier is often quoting aluminium ceiling panels for the ceilings behind them and other wall panels and wall cladding for internal feature and partition work. Grouping these in one enquiry reduces colour and joint mismatches between the wall, the reveal and the ceiling line — and it gives you one production schedule instead of three.
Frequently asked questions
Should I send drawings or just a square-metre quantity?
Send drawings. A square-metre figure produces a price per square metre that hides panel-size complexity, fabrication content and finish count. With a setting-out drawing the supplier can tell you whether your module sizes are practical before production starts.
Why do two quotes for "25 mm aluminium honeycomb panel" differ by such a large margin?
Almost always because of skin gauge, core specification, coating system and fabrication scope. Compare the build-up lines first, then the coating, then whether cassettes, stiffeners and subframe are included.
Can one panel type be used for both facade and interior wall cladding?
Honeycomb panel is used on external facades, curtain walls, internal wall decoration and partition panels. The build-up and coating should still be chosen per location — exterior exposure drives the finish system, while interior work may allow a different coating and may prioritise acoustic perforation or a decorative surface instead.
Is a sample panel worth the cost?
On facade packages, yes. A fabricated sample settles colour under real light, joint detail and flatness before the full order is committed.
SANTERSON manufactures and supplies aluminium honeycomb cladding panel alongside ceiling panels, wall finishes and interior fixtures for hotel, villa and commercial projects, with custom sizes, finishes and fabrication to drawing. Send your setting-out drawings, panel build-up and finish references to our team and you will receive a quotation built on the same specification line by line.