A glass corner wardrobes submittal is the document package a contractor, designer or project owner reviews before a made-to-measure wardrobe goes into production. For a corner unit it matters more than for a straight run: two wall returns meet at an angle, door leaves have to clear that return, and the glazing specification has to survive being seen from both sides of the room. A submittal that answers those questions up front prevents the site measurement queries, re-cut panels and hold-ups that push a joinery package behind programme.

Below is the content we expect to see confirmed on our side of the quotation, and what buyers should expect to receive back before they release an order.

1. Measured drawings, not a room sketch

Corner wardrobes are built to the space, so the submittal should carry dimensioned elevations of both runs plus a plan showing how they join. At minimum it should record:

  • Overall width and height of each run, and the depth from the finished wall face to the finished door face.
  • The corner angle — 90° is assumed far too often. Out-of-plumb and out-of-square walls are normal in older villas and in refurbished apartments, and the scribe or filler panel has to be drawn, not improvised on site.
  • Floor finish build-up at the threshold and skirting treatment, so carcass bases sit on the completed floor level rather than the slab.
  • Ceiling detail: cornice, recessed lighting channels, sprinklers, air diffusers or curtain boxes that cut into the wardrobe height.
  • Everything the unit must avoid — switch plates, door architraves, radiator tails, handle swings of adjacent doors.

Where a designer has issued a general layout only, we produce made-to-measure sizing from the site dimensions agreed for that project and return marked-up drawings for confirmation before cutting. That step is where most corner problems get solved cheaply.

2. Layout and internal configuration

The dead corner is the real design decision. A submittal should show what happens in the return, not just the front elevation: a rotating carousel, a pull-out rack, a shallow shelf bank for folded items, or a blind carcass closed off and given back to the adjacent run. Hanging heights, drawer stacks and shelf pitches should be listed per zone with levels, so the reviewer can check them against actual storage habits rather than a generic template.

Where the brief calls for an open, handleless look instead of glass fronts, custom minimalist bedroom wardrobe detailing is a useful comparison in the same submittal — flat panels, integrated pulls and custom internal layouts for apartments, villas and hotel bedrooms. Comparing the two options on paper at submittal stage avoids a change order once the glazing has been cut.

3. Glass specification and door mechanics

For glass-fronted corner units the submittal must state the glazing build, not just "glass door". Confirm the glass type and colour, whether it is tempered, any film or laminate requirement for impact and shatter retention, and the finish of the frame profile — aluminium framing in a bronze, black or clear anodised tone reads differently against the same wall paint. Tint behaviour under warm bedroom lighting is worth stating in writing, since tinted glass photographs well on a sample board and can read very differently across a full-height corner run.

Then state how the doors operate. Hinged leaves need their swing arc checked against the corner return and against anything standing in front of the unit; sliding leaves need track, stop and clearance details, and glass sliding door wardrobes detail is a good reference for what to document — leaf overlap, top track fixing into the ceiling or a header beam, and the reveal needed at the return. Include ironmongery model references, soft-close fittings, and the load rating of drawers and rails.

4. Materials, finishes and edge treatment

List board substrate by component rather than one blanket line: carcass, doors, back panels, shelves and drawer boxes rarely share the same specification. Record surface finish — lacquer, veneer, melamine or acrylic — with a reference code from the supplier range, plus edge banding thickness and colour match, since edges are what give a corner unit away as site-made or factory-made. For villa and hotel work, note which finishes repeat elsewhere in the project so bedroom joinery matches cabinetry and wall panelling across the same batch.

5. Fire, safety and local requirements

Do not let a supplier assert compliance on your behalf. The submittal should carry the test certificates or declarations that apply to the exact boards, glass and fixings being supplied for your project, referenced to the standard named in the specification. Glass in a corner position is more exposed to impact than a recessed run, so state whether safety glazing is required by the specifier and confirm which product complies. If the wardrobe sits in a stair void, escape route or shared corridor, raise it with the local authority or certifier before ordering.

6. Manufacturing, packaging and delivery plan

Corner units arrive as a kit that only assembles in one sequence, so the submittal should say how it arrives: panel-by-panel packing list with crate marks matched to drawing numbers, glass individually crated and separated from carcass panels, hardware kitted per unit. For cross-border projects this is also where freight mode, container loading plan, commercial invoice and packing list descriptions, customs documentation and the delivery point get agreed — details that are far cheaper to settle before production than after a container has been booked.

7. Installation sequence and site conditions

A workable submittal tells the site team what has to be true before the wardrobes land: floor levels complete, painting behind the unit finished, first-fix electrics and any internal lighting cabling in place and tested, wall build-ups fixed so the fixing method can be selected. Then give the assembly order for the corner — which run goes first, how the two carcasses tie together, where packers and scribes go, and how the glass leaves are fitted last to avoid damage.

8. Samples, approvals and responsibilities

State what physical evidence comes with the submittal: a glazed door sample or offcut, a finish board, hardware samples, and a mock-up of the corner joint for larger projects. Then record who signs what — the reviewer approving the drawings, the party confirming site dimensions, and the date those approvals were given. A short approval table does more to protect the programme than a long cover letter.

DocumentWho confirms it
Measured elevations and plan, both runsSite surveyor / contractor
Internal layout with levels per zoneDesigner / end user
Glass, frame and ironmongery scheduleSpecifier
Board, finish and edge schedule with codesDesigner / client
Certificates referenced to the specified standardCertifier / authority in the project country
Packing list, crate marks and delivery pointLogistics lead / site agent

9. Commercial terms and after-handover support

Close the submittal with the commercial record: unit rates by configuration, what is included in the price (packaging, hardware, spares), what is excluded (site making good, electrical connection of internal lighting), revision cut-off dates once drawings are approved, and the warranty terms for panels, glass and moving parts with the process for spare parts. Where a project needs matching pieces later — an extra unit in a second bedroom, a replacement glazed leaf — this is where batch references and finish codes earn their keep.

A practical test before you approve: hand the submittal to the fitter who will install the unit. If they can assemble the corner from those drawings without phoning anyone, the package is complete.

SANTERSON supplies made-to-measure corner and wardrobe joinery with project-specific dimensions, layouts, materials and finishes, working from confirmed site measurements and returning drawings for sign-off before production. Send us your room dimensions, the glazing and finish direction you want, and the country the units ship to, and we will put together a submittal that covers each of the items above.