A swim spa that seats twenty jets and a six-metre swimming channel in one shell is an attractive line item on a villa or resort drawing, and an awkward one on site. The model usually arrives before the electrical engineer has sized a circuit, before the deck contractor knows what load to build for, and before anyone has measured the route from the loading bay to the terrace. Most delays we see on these orders trace back to inputs that were never collected, not to the shell itself. This guide sets out the measurements and project information that let us quote Outdoor Swim Spa WS-130AⅨ accurately, and shows how the same list applies across our wider swimming pool and swim spa range.
Start with the footprint, not the brochure
The catalogue dimension for WS-130AⅨ is 8000 × 3000 × 1400 mm. Treat that as the shell envelope, and then add the working space your build actually needs. A spa dropped onto a prepared slab without those clearances cannot be serviced: pumps, filter pump and the control system sit inside the cabinet line, and access panels have to open.
- Overall shell envelope — length, width and height, plus the finished water level if the design depends on it visually.
- Access and service clearances — which side the equipment is reachable from, and whether a technician can stand there with the lid open.
- Delivery route — gate widths, turning radii, lift capacity, stair or crane access, and the last metre from truck to slab.
- Support structure — slab thickness, reinforcement, drainage falls, and whether the spa is recessed, semi-recessed or raised on a deck.
Send us a dimensioned plan with those four items marked. If the site is still at concept stage, a sketch with rough dimensions is enough for an indicative layout; we can then flag what needs confirming before production.
What the WS-130AⅨ specification covers
The published specification for this configuration gives you a baseline to compare against your design intent. Where a figure drives a building works decision — power, in particular — confirm it with us for the exact configuration you order, because optional equipment changes the load.
| Specification item | As listed |
|---|---|
| Model | WS-130AⅨ |
| Catalogue dimensions | 8000 × 3000 × 1400 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump | 1 pc |
| Filter pump | 1 pc |
| Jets | 20 in total |
| LED lights | 7 |
| Total power | 10.85 kW |
| Features shown | Water jets, LED lighting, ozone, swim training system |
The 10.85 kW figure is the one your electrical consultant will ask about first. It determines cable size, protection device and whether the supply at the property can carry it alongside heat pump, lighting and the rest of the exterior load. Give them the number early, and give them the configuration that produced it.
Optional equipment changes the utility budget
Catalogue options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one shifts something the building team needs to know about: a heat pump adds electrical load and plant space; sand filtration adds a filter location and backwash drainage; insulation changes how the shell behaves in a cold climate; steps change the entry geometry and the deck detail.
Where this configuration sits alongside related models
Clients often start with one model number and finish with another once the site constraints are on paper. Comparing configurations is straightforward when the inputs are consistent, so use the same measurement list for each candidate.
- Outdoor Swim Spa WS-130AⅨ-U shares the 8000 × 3000 × 1400 mm envelope but lists a different jet and pump arrangement, with no swim training system in the captured specification and a total power figure of 11.85 kW. If daily lap swimming is not the priority, that difference matters.
- Outdoor Swim Spa WS-130BⅨ keeps a comparable jet count and power figure but runs to 9950 × 3000 × 1430 mm, which is nearly two metres longer. That extra length changes the slab, the delivery route and often the neighbouring landscape design.
- Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool combines a long swimming channel with a separate relaxation area — a useful layout when one person wants to swim laps while another soaks.
- Customizable Shape Outdoor Spa, Personalized Hydrotherapy Pool covers projects where square, round, oval or curved geometry is set by the architecture rather than by a standard catalogue shell.
Project inputs that let us quote properly
For a single residential unit, the list above is usually enough. For a hotel, resort or multi-villa development, add the items that affect coordination across units:
- Quantity by model, and whether configurations differ between unit types
- Phasing and delivery sequence, so nothing sits in storage on site
- Who carries the scope for siting, electrical connection and plumbing — us, the main contractor, or a local subcontractor
- Site conditions: exposed coastal positions, elevated terraces, wind exposure, existing plant capacity
- Finishes and colours that must match the wider palette of the project
- Inspection and handover documentation your client or certifier expects
As a manufacturer working on villa, hospitality and office projects, we handle these products alongside the rest of the package — outdoor furniture, bathroom ceramics, lighting, wall panelling, ceilings and cabinetry. Coordinating them through one supplier keeps specification decisions consistent and puts a single production and delivery schedule behind them. Our turnkey solutions cover design consultation, product specification, manufacturing, logistics and site coordination; where a project needs non-standard dimensions or finishes, our custom and OEM service covers bespoke material, finish and configuration work.
A short sequence that avoids rework
- Fix the location first. Slab, drainage and access clearances follow from it, and changing the position later means redoing all three.
- Choose the configuration before tendering the electrical package. Jet count, swim system and heat pump options determine the load.
- Confirm option availability in writing for the model you intend to buy, not the range in general.
- Check the delivery route before production starts, while geometry can still be adjusted.
- Agree handover scope early: who commissions the spa, what is tested, and what documentation is issued.
Send us your drawings
If you have a plan, a section through the terrace, and a note of the electrical supply available at the property, we can tell you quickly whether WS-130AⅨ fits as drawn or whether a shorter shell such as WS-130BⅨ, a different configuration, or a customised shape is the better route. That conversation costs nothing and saves a great deal of rework once concrete is poured.
Talk to our project team
SANTERSON — furniture and building materials manufacturer, one-stop supplier for villa, hospitality and office projects. Contact: PHILLIP. Phone / WhatsApp: +86-13928214007. Email: santerson@qq.com.
Send drawings, quantities and site constraints through our contact page, or browse the full range in Swimming Pools and Swim Spas.