A swim spa only works on site when the shell, the services and the surrounding hardscape agree with each other. That agreement is decided on paper long before the unit arrives. If you are specifying Outdoor Swim Spa WS-PC05 for a villa terrace, a resort garden or an estate pool zone, this guide walks through the drawings and site information our project team needs from you, and what we send back at each stage so nothing has to be re-cut on site.

Start with the catalog envelope, not the brochure photo

WS-PC05 sits in our configurable outdoor swim and hydrotherapy range. The catalog entry records a shell of 5000 × 3000 mm with a depth of 1100 mm, and lists water jets, LED lighting, ozone sanitisation and four water columns among the features shown for this model. Treat those numbers as the starting envelope for your layout drawings rather than the final build dimension: the configuration you select changes pumps, insulation, steps and controls, and therefore the space and services each one needs.

The same 5 m family covers several layouts, which is why we ask for the model variant early. WS-PC05CH is a shallower 5000 × 3000 × 900 mm shell without the water columns; WS-PC05ST and WS-PC05ST-S are narrower at 5000 × 2400 mm but deeper at 1470 mm and include a swim training system; WS-PC05ST-L extends that narrow format to 5490 mm. If your architect has drawn the spa into a fixed timber deck or a paved recess, the variant must be locked before those setting-out drawings are issued.

What we need from your design drawings

Setting-out plan: finished deck levels, the position of the spa relative to boundaries and glazing, and whether the unit is above ground, semi-recessed or fully recessed.

Access route: gate width, turning space, steps and overhead obstruction between the delivery point and the final position, so we can plan how the shell reaches the site.

Structural note: who designs the supporting slab or plinth. Load design stays with your engineer; we supply the base footprint and equipment layout for them to work from.

Services layout: electrical supply position and capacity, dedicated circuit arrangement, drainage points, and any pump-room or equipment-cabinet location you want concealed.

Finishes interface: cladding material around the cabinet, coping or capping detail, step arrangement, and handrail positions if children or guests with limited mobility will use the spa.

The information we return to your design team

Once the model and configuration are fixed, we return a coordination sheet for the drawings: assembled dimensions with the access side marked, the equipment layout behind the cabinet, the control system position and the electrical connection point. Where a project needs changes — a different cladding colour, an alternative step position, insulation for a colder climate, or a heat pump added to the specification — we confirm them as shop drawings before production starts.

Equipment options in this range are configured per project rather than fixed. Catalog-listed additions include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the coordination sheet is where we confirm exactly what your selected configuration includes.

Site requirements to settle before production

Item to resolveWhy it belongs on the drawings
Power supply and circuitTotal power is listed per model in the catalog — 2.25 kW for WS-PC05, 6.55 kW for the swim-training variants. Your electrician sizes the circuit, protection and run from that figure; we mark the connection location.
Waterproofing and drainageRecessed installations need a drained, tanked void. Overflow, spillage and any future shell removal all need a path for water to leave the deck build-up.
Equipment accessFilters, pumps and the control system need reachable service space. Fixed cladding that hides them must include an access panel or a removable section.
Ground bearingA filled spa is heavy. The slab or plinth has to be level, fully supported and designed by your engineer for the loaded weight of the water-filled shell.
Wind, shade and privacyScreening, pergolas and adjacent glazing affect comfort and glare on the water surface. Coordinate them with the spa orientation on the plan.

Figures above come from our catalog listings for these models and change with configuration. Confirm the exact specification with us before any drawing is signed off as construction information.

Planning the spa inside a wider landscape package

On most projects the swim spa is one item in a longer procurement list: poolside lounging, shade structures, perimeter cladding, wall finishes and the loose furniture that surrounds the deck. Coordinating those items with one supplier keeps the material palette and the delivery window consistent, which is why many of our clients group them under building materials supply alongside the spa. Our turnkey project solutions cover design consultation, material selection, production, logistics and site coordination from a single brief.

For pool decks that face the spa, our aluminium sling sun lounger collection is the practical companion: aluminium frames treated for chlorine and coastal air, quick-dry mesh, and static, wheeled or folding bases so the layout can flex with the deck geometry. Where a project calls for a bespoke form instead of a catalog shell, our customizable shape outdoor spa is built in square, round, oval and curved configurations to suit the space.

A simple sequence that keeps the programme intact

1. Share the brief: project type, climate, intended use (lap swimming, hydrotherapy or family use), and the drawings you already have.

2. select model and configuration: we compare variants against your plan and confirm included equipment, power and dimensions in writing.

3. Exchange coordination information: our sheet to your engineer and electrician; your setting-out and services drawings back to us for shop-drawing confirmation.

4. Produce and inspect: factory build with pre-shipment checks against the approved configuration.

5. Deliver and set: freight arranged to site, unloading plan agreed, unit placed on the prepared base by your team to our setting-out marks.

Send us your drawings. If you are specifying WS-PC05 or another model from the swim spa range, share the setting-out plan, access route and services layout, and we will return a configuration sheet for that selection — shell dimensions, included equipment list and the catalog power figure — so your engineer and electrician can detail around it.

Contact SANTERSON through our contact page to start the specification review for your villa, resort or estate project.