A set of acoustic sliding panels looks simple on a drawing: two or three leaves, a track, a finish that matches the joinery. The problems start after order confirmation — a leaf that will not clear a doorway, a track fixed to a ceiling that cannot carry it, or a panel specified as "acoustic" when the room actually needed sound isolation. Below are the questions worth putting to your supplier before a made-to-measure order is placed, using our own Santerson Acoustic Sliding Panels as the reference product.
1. What acoustic outcome does the room actually need?
This is the first question, and it is usually asked last. Two rooms can look identical on a floor plan and need opposite solutions:
- A media room, home cinema or music corner where speech and music bounce off hard surfaces — here the goal is to reduce reflection inside the room.
- A study behind a bedroom, or a meeting booth inside an open-plan office — here the goal is to stop sound travelling through the separating element.
Sliding panels address both, but not equally. A panel with soft or perforated facing changes how a room sounds; mass, leaf thickness, edge detailing and how tightly the leaves close change how much sound passes through. Ask the question in plain language — "what am I trying to stop hearing?" — before you choose a finish.
2. Which wall, opening and headroom will the panels live on?
Sliding systems fail on site far more often than they fail in the workshop. Send your supplier a measured drawing rather than a single span dimension, and ask these back:
| Item to confirm | Why it matters |
|---|---|
| Finished floor and finished ceiling levels | Tolerance is taken up by the track and the bottom guide; rough-in heights give you the wrong leaf height. |
| Clear opening width and stack space | Leaves need somewhere to park. A 1,200 mm opening in a 1,500 mm reveal leaves little room for a three-leaf stack. |
| Substrate above the opening | Timber framing, steel, or plasterboard alone each need different fixings and may need a header before the track goes in. |
| Floor finish at the threshold | A bottom track set into timber is not the same detail as one set into tile or over an existing slab. |
| Adjacent services | Downlights, sprinkler heads, air diffusers and curtain boxes all sit in the ceiling zone a top track occupies. |
If you are working from architectural drawings rather than site measurements, say so. We produce to the dimensions supplied, and re-making a panel after installation is the expensive part of the job.
3. How many leaves, and which direction do they stack?
Leaf count follows opening width and leaf width, not taste. Ask for the stacking layout drawn both open and closed, and check it against how the room is used day to day:
- Will the panels be opened daily, or once a season for an event?
- Should the stack sit inside the opening or flat against the return wall?
- Barn-style surface track, or leaves that disappear into a pocket?
Where the requirement is a full-height room divider rather than a wall finish, look at Santerson Partition Sliding Systems alongside the acoustic option — track type, hardware and opening dimensions are specified per project on that range too.
4. What is the panel core, facing and edge detail?
"Acoustic" describes a build, not a colour. Ask what sits between the faces, what the visible face is, and how the edges are finished — because the edges are where sound leaks and where a panel looks cheap. For residential wall systems we work from material and finish options chosen per project; veneer, lacquer, textured and stone or marble-effect surfaces can be specified to match surrounding joinery. Request the specification sheet for the exact combination you are ordering rather than accepting a category name.
5. Which hardware carries the leaves, and how is it serviced?
Hardware decides whether the system still works in year five. Ask:
- Track material and profile, and the maximum leaf weight it is rated for.
- Hanger type, load rating and whether replacement hangers are stocked.
- Bottom guide or floor track — and what happens to it if the floor is later replaced.
- Handle and lock detail, especially where children use the room.
Then ask how a hanger is replaced without removing the whole leaf. A system you can adjust from below is worth more than one that needs the panel back in the workshop.
6. Who coordinates the panels with the rest of the fit-out?
A sliding panel rarely arrives alone. It has to agree with flooring, ceiling, lighting and cabinetry around it. If your project already sources joinery, wall panelling, doors and finishes from one factory, ask for that coordination as part of the order — the same drawings then govern the wall panel system and everything next to it. See Wall Panel Systems for the fixed panelling that usually runs into a sliding set, and Interior Design Services if your drawings still need layout and finish development before anything is cut.
For villa and hospitality projects where panels are one line in a much longer schedule, Turnkey Solutions covers design through production, freight, installation and handover under one scope.
7. What arrives on site, and in what sequence?
Panels delivered before the floor is finished sit in a corridor for six weeks. Ask your supplier to confirm:
- Packaging and protection for high-gloss or textured faces in transit.
- Whether tracks and hardware ship with the leaves or ahead of them.
- Delivery terms and who receives the goods at the building.
- Installation sequence relative to painting, flooring and final electrical fixings.
On international projects we arrange freight, export paperwork and door-to-door delivery, then installation and after-sales support. Confirm scope for your specific address before order — terms, duties and site access vary by project, and we would rather set that out on the quotation than at the loading dock.
8. What is covered after handover?
Ask what happens if a leaf is damaged in use, if a hanger fails, or if the client wants a matching panel two years later. Written answers to those three questions are worth more than a brochure claim.
9. Before you send your enquiry
Have these ready and the quotation comes back accurate the first time:
- Measured clear opening width, height and available stack space, taken on site at finished levels.
- A photograph of the opening and the ceiling zone above it.
- The acoustic intent in one sentence — room treatment or sound separation.
- Finish reference, and the joinery or flooring the panels must match.
- Opening frequency and users, so hardware is specified for real use.
- Your installation date, working back from it to a drawing sign-off date.
Send that package and the questions above get answered in one round instead of four. Contact us with your drawings and acoustic intent, and we will confirm the configuration, hardware and lead time for your opening.