A square luxury hot spa with a waterfall feature and LED lighting is not an off-the-shelf item you simply order by model number. Frame material, shell construction, pump layout, lighting count and the options wrapped around them all change the price. That is why two quotations for "the same" spa can sit far apart, and why a request for quote (RFQ) that only states a size will bring back numbers you cannot compare. The document below is what experienced buyers send so that every supplier prices the identical specification.
Start From the Reference Product, Not a Generic Description
Our Square Luxury Hot Spa with Waterfall Feature & LED Lighting is built on a #304 stainless steel metal frame for stable support, with a massage pump, a circulation pump and an optional air blower. The page also describes a sealed base, a moisture-free cabinet and an isolated power layout. Those details are the reason the unit can sit outdoors year after year, and they are exactly the items your RFQ should ask every supplier to confirm in writing.
If you are comparing several designs rather than one fixed model, our Swimming Pools and Swim Spas range covers square, round and long formats, along with configurable swim spas that add a swim training system. Naming the reference product in your RFQ keeps the conversation on one specification instead of drifting between designs.
The Ten Blocks a Complete RFQ Must Contain
1. Site and installation condition
- Ground type: concrete slab, timber deck, pavers, or a recessed/partially buried installation.
- Clear access route from the delivery point to the final position, including gate width, steps and turning space.
- Whether the spa sits on a terrace, balcony or roof level, and any load limit that applies.
2. Water envelope and footprint
- Outer dimensions and water depth you need, plus the number of bathers the spa must seat comfortably.
- Whether a waterfall wall, a spillway edge or a deck-level overflow is wanted, since each changes the cabinet and the plant space.
3. Shell and structural make-up
- Shell material — acrylic shell on our round and customised spas, versus a steel-framed cabinet on the square model.
- Frame grade and corrosion protection. Ask for the stainless steel grade to be stated, not just "metal frame".
- Base treatment: sealed base, moisture barrier and how the power components are separated from the wet zone.
4. Pump and jet layout
- Number and position of massage jets, plus pump count and total connected power in kW.
- Whether an air blower is included or optional, and which seats the air function covers.
- Filtration cycle: filter pump size, run hours per day expected, and whether sand filtration is offered as an upgrade.
5. Lighting and water features
- Number of underwater LED fittings, their position (wall, step, cabinet) and colour mode — single colour or multi-colour.
- Waterfall flow control: manual valve, diverter or remote control.
- Whether the lighting circuit is separate from the pump supply, which matters for service access.
6. Heating, insulation and water care
- Heat source: heat pump, electric element or neither, with target water temperature stated.
- Insulation package for cold nights, and cover type if one is required.
- Sanitisation route — ozone and/or UV sterilization — and where the dosing equipment will sit.
7. Controls and electrical supply
- Control system type, touch panel or remote, and how many zones it manages.
- Your available supply: single-phase or three-phase, voltage and breaker size, plus where the isolator will be installed.
- Total connected load in kW for the configuration quoted, so the electrician can size the circuit before the spa arrives.
8. Options, spares and documentation
- Steps, handrail, cabinet finish (wood-look or plain), and any custom colour.
- Spares kit to ship with the unit: jet inserts, seals, filter cartridge, control board.
- Wiring diagram, operation manual and a parts list you can order from later.
9. Delivery terms and packaging
- Incoterms and destination, packaging method, and how the unit is lifted off the truck.
- Consolidation with other items on the same project — spa orders often travel in one container alongside Outdoor Furniture for Villas and Resorts.
10. After-sales scope
- Warranty period and what it covers: shell, frame, pumps, controls, lighting.
- Lead time for spare parts, and who performs installation and commissioning on site.
How the Specification Table in Our Catalogue Is Laid Out
Configurable models in the range are published with the same fields, so you can copy that structure straight into your RFQ and ask each supplier to fill it in line by line. Two rows from our catalogue show what a complete entry looks like.
| Field | Waterfall-equipped model (5.8 m) | Swim-training model (5.0 m) |
|---|---|---|
| Catalog dimensions | 5800 × 2200 × 1250 mm | 5000 × 2400 × 1470 mm |
| Control system | 1 set | 1 set |
| Swim training system | Not listed for this model | 1 set |
| Water pump | 3 pcs | Not listed |
| Filter pump | 1 pc | 1 pc |
| Jet total | 48 pcs | 6 pcs |
| LED lights | 3, plus 26 small LED lights | 4 pcs |
| Total power | 13.35 kW | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Waterfall | Water jets, LED lighting, Ozone, Swim training system |
Read the two columns side by side and the price gap explains itself: 48 jets against 6, three water pumps against none listed, 13.35 kW against 6.55 kW. An RFQ that lists these fields forces both suppliers onto the same page before you compare a single dollar figure.
When a Square Spa Is Not the Right Format
A square footprint suits terraces, courtyards and villa entertainment corners where seating capacity matters more than lap swimming. If the client wants daily exercise instead, a long format such as our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool pairs a swimming channel with a separate relaxation area. For a compact garden, the round format — see the Round Outdoor Hot Tub Spa with Hydrotherapy Jets & Underwater LED Lights, built on an acrylic shell with a wood-look cabinet — suits tighter layouts. Where the plan calls for a shape that is not in the catalogue, our Customizable Shape Outdoor Spa covers square, round, oval and curved shells.
Sending the RFQ Through Our Project Desk
Because we act as a One-stop Furniture and Building Materials Supplier, a spa quotation normally arrives as part of a wider package — outdoor furniture, paving, wall panels, lighting and bathroom fixtures for the same building. That is useful on a villa or resort project: one specification sheet, one production schedule, one container plan under Furniture Logistics and Door-to-door Delivery, and one point of contact for Furniture Installation and After-sales Support. Send your completed ten-block brief with drawings or photos of the site, and we price it against the exact configuration rather than a generic catalogue line.
Before you press send — quick check
- Site condition, access route and load limits are stated.
- Frame grade, shell material and base treatment are named.
- Jet count, pump count and total kW are requested for every bid.
- LED fitting count and waterfall control method are specified.
- Supply phase, voltage and breaker size are given to the supplier.
- Warranty scope, spares list and installation responsibility are in writing.
Send us your spa specification
Share the ten blocks above with your drawings, and we will return an itemised quotation for the exact configuration — spa, options, packaging and delivery to site. Send the brief through our contact page; the desk is open Monday to Saturday, 8:00 AM to 6:00 PM (GMT+8).