Hidden cabinets look effortless once the room is finished. That quiet, uninterrupted wall surface is the result of decisions made long before the first crate arrives — measurements, substructure, door openings, electrical feeders, freight sequencing and site access. When those decisions are pulled apart across different suppliers and trades, the cabinet that was meant to disappear becomes the item everyone argues about on site.

Our Hidden Cabinets are made-to-measure pieces within our Integrated Storage Walls collection, with layout, material and finish specified for each project. Because they are built to the space rather than picked from a stock range, delivery and installation have to be planned as part of the build programme, not bolted on at the end. The checklist below is the one we work through with architects, contractors and procurement teams on villa and hospitality projects.

Start with the wall, not the cabinet

A concealed unit only reads as a clean plane if the surrounding build agrees with it. Before any drawing is signed off, confirm three interfaces:

  • Setting-out and levels. Full-height and recessed units depend on floor-to-ceiling dimensions and plumb walls. Record finished-floor levels and wall set-outs from the latest architectural drawings, not the structural slab.
  • Substructure and fixing method. Concealed frames, panelling and door linings need a supporting substrate that is designed for the load and the reveal. Agree who builds it and when it is signed off.
  • Adjacent trades. Plasterboard, paint, skirting, flooring, lighting and any integrated power or integrated cabinet lighting must be routed and tested before the panels close up.

Where the design continues into a storage wall, an opening or a concealed access door, treat those as one package. Our Full Height Storage Walls, Sliding Storage Panels and Decorative Concealed Doors are specified to the same opening sizes and finish schedules, so they can be measured, produced and installed in one sequence instead of three.

Lock the specification before production starts

Late changes are expensive on a made-to-measure order, because the panel, edge, hinge and hardware set are all cut to the same dimension. Our custom furniture design and prototyping service covers design development, material and finish selection and prototype review, so the version that goes into production is the version the site team expects.

Item to confirmWhy it matters at installation
Final opening and clearances, including skirting and flooring build-upDetermines door swing, sliding track and reveal tolerances
Finish schedule and grain or sheen directionPanels from different batches must read as one surface
Hardware type, opening mechanism and access sideFixings and clearances are pre-machined, not adjusted on site
Power, data and lighting feed positionsCable routes must be completed before panels are closed
Substrate, anchor points and load pathFixing detail has to match the wall build the contractor actually constructs

Ask for a dimensioned shop drawing with the finish schedule attached, then have the site team counter-check it against as-built conditions. That single step removes most of the surprises we are called out to resolve.

Plan freight around the installation order

Concealed joinery usually arrives with other interior fixtures, and it should not arrive first. Through our logistics and door-to-door delivery service we arrange freight by sea, air or rail with the packing list, commercial documents and container loading planned around the site programme.

  • Sequence by trade, not by supplier. Wall linings, doors and cabinets that install together should land in the same window, after wet trades have cleared.
  • Label by room and elevation. Every crate carries the unit reference from the shop drawing, so the crew knows where it goes without opening it.
  • Protect panels in transit and on site. Panel edges and finished faces are the parts most likely to be damaged between the container and the wall.
  • Check access before delivery. Lift sizes, stair widths, corridor turns and lift booking times decide whether a full-height panel can reach the room intact.
  • Store correctly on site. Panels stay flat, dry and off the ground until the wall behind them is signed off.

For projects where several packages are consolidated into one shipment, our one-stop furniture and building materials supply keeps cabinetry, wall panelling, doors, flooring and bathroom fixtures under the same production and shipping schedule, which makes the delivery order far easier to control.

Set the site conditions before installers arrive

Hidden cabinets are unforgiving of a damp, dusty or unfinished room. Before installation begins, confirm that:

  • wet trades, screed and plaster have dried, and the room is enclosed and weather-tight;
  • finished floor levels are complete where the unit sits on or meets the floor;
  • first-fix electrical, data and any lighting drivers are installed, tested and documented;
  • the substrate, noggins and anchor positions match the approved fixing detail;
  • the installation crew has the current drawing revision, not an earlier issue.

Our installation and after-sales support covers on-site fitting, inspection with a snag list, spare parts and follow-up maintenance. Where the local team is not ours, we still issue the fixing details, hardware schedule and assembly sequence so the site contractor can install to the same standard.

Hand over with a snag walk, not a signature

Walk the installation with the client or consultant immediately after fitting, while adjustment is still simple. Check door and panel alignment, gap consistency, hinge and runner operation, flushness with adjacent walls, finish continuity across panels, and that every internal accessory and lighting circuit works. Record the agreed snags with photos and reference numbers, then close them out before handover.

Keep the as-built drawing, hardware schedule and spare-part references with the project file. On a villa or hotel, a concealed unit will be opened, adjusted and re-finished over many years, and whoever maintains it needs the same information the installers had.

A short timeline that works

  1. Design stage: layout, finish schedule and interface details agreed with architect and contractor.
  2. Measurement stage: site survey against as-built conditions; shop drawings issued and approved.
  3. Production stage: panel cutting, machining, finishing and hardware preparation, with prototype or sample review where required.
  4. Delivery stage: freight booked to the installation window, crates labelled by elevation, access confirmed.
  5. Installation stage: site conditions signed off, units fitted, adjustments made.
  6. Handover stage: snag walk, close-out, as-built records and spares handed over.

The aim is simple: the cabinet should be invisible in the finished room and obvious only in use. That outcome comes from coordination between design, production, freight and site, which is exactly what our turnkey interior project solutions are built to handle — one team carrying the package from drawing to handover.

If you have drawings for a villa, hotel or apartment project, send them to us and we will return made-to-measure hidden cabinet proposals with the interface details, finish schedule and delivery sequence your site programme needs. Contact details are on our contact page.