A swim spa sits between two procurement worlds. It is a piece of loose outdoor furniture in the sense that it arrives as a finished unit, and it behaves like building services in the sense that it needs power, water, drainage, a structural base and a maintenance regime before handover. That dual nature is why swim spa line items so often come back from tender with open questions. If your brief covers an outdoor swim spa for a villa, resort or clubhouse, the sections below set out what to state, what to leave for the supplier to confirm, and how the SANTERSON catalogue item WS-S06CT-L is normally specified.

Start with the site envelope, not the model number

Buyers usually open an enquiry with a model code. Procurement teams respond faster when the first paragraph answers siting questions instead, because those answers determine which configurations are even possible.

  • Footprint and clearance. State the finished external dimensions the plot allows, then allow working space around the unit for the plant compartment, steps and access for servicing. A unit that fits the deck with no side clearance cannot have its filters or control system reached later.
  • Base construction. Say who is pouring or building the supporting slab or plinth, what level tolerance it will hold, and whether drainage falls away from the shell. This is normally a contractor scope item, and leaving it unstated is the single most common source of on-site delay.
  • Exposure. Full sun, shaded courtyard, coastal air or an enclosed indoor void all change what you should ask for in insulation and cover specification.
  • Use profile. Lap swimming for training, hydrotherapy for guests, or mixed resort use drive different jet layouts and different expectations of run hours.

Once those four points are written down, the model conversation becomes a comparison exercise rather than an open enquiry.

What the WS-S06CT-L catalogue entry already answers

Outdoor Swim Spa WS-S06CT-L is a configurable unit in our outdoor swim and hydrotherapy range. The published catalogue entry gives the figures below, which you can paste directly into a specification schedule as a starting point.

ModelWS-S06CT-L
Catalogue dimensions6670 × 2380 × 1400 mm
Control system1 set
Swim training system1 set
Water pump1 pc
Filter pump1 pc
Jet total31 pcs
LED lights4
Total power8.35 kW
Features shown on the listingWater jets, temperature setting, LED lighting, ozone, swim training system

These values are transcribed from the catalogue page for this model. Treat them as the reference configuration, and ask for a written configuration sheet against your order before you lock a tender price — options and bundled equipment vary between variants in the same series.

The line items that decide whether the brief is buildable

A swim spa quotation turns into a purchase order when the following are named as separate rows, each with a responsible party.

  • Electrical supply and protection. The catalogue lists total power for the reference configuration; your electrician still needs to confirm supply capacity, circuit protection and routing on site. State whether the client's electrical contractor or your team carries out the final connection.
  • Heating method. Catalogue-listed options include heat pumps and insulation packages. Heating choice drives both running cost and how the unit performs in a cool shoulder season, so specify it explicitly rather than assuming it is included.
  • Water treatment. Ozone appears on this listing; UV sterilisation and sand filtration are listed as options for the range. Name which treatment train you want and who maintains consumables after handover.
  • Filtration duty. The filter pump is a stated component, but filtration run hours are an operating decision. For shared or guest-facing installations, ask what duty cycle the equipment is being specified for.
  • Access and steps. Steps are listed as an option in the catalogue. Confirm whether they are fixed, removable or integrated into the surrounding deck detail.
  • Spare parts and service contact. Name the spare-parts route and the after-sales contact in the contract documents at the time of order, not at first fault.
Rule of thumb for a clean tender: every swim spa row in your bill of quantities should have a matching row for base construction, electrical connection and commissioning. If any of those three are missing, the quotation you receive will not be comparable with the one from another supplier.

How this fits a combined furniture and building-materials order

Swim spas rarely sit alone in a project. On villa and resort packages they are usually accompanied by poolside loungers, outdoor dining sets, pergolas or gazebos, plus the bathroom fixtures and lighting for adjacent changing facilities. Ordering these together reduces the number of separate deliveries to coordinate and keeps finishes visually consistent across indoor and outdoor spaces.

SANTERSON works as a China-based manufacturer and one-stop supplier covering furniture, building and construction materials and interior fixtures, with custom and OEM service, freight by sea, air and rail, door-to-door delivery, and installation and after-sales support. For an outdoor swim spa line item that means the unit can ship alongside the rest of the poolside package on one consolidated consignment, with a single point of contact for production coordination.

If your project also needs adjacent hard landscaping finishes — wall cladding, engineered flooring for covered terraces, or ceiling panels for a pavilion — those are specified in the same schedule and produced under the same programme. Our turnkey project solutions cover design coordination, production, logistics and site support as one package.

Questions buyers ask at specification stage

Can the dimensions be changed for a tight plot?

The figures above are the catalogue dimensions for WS-S06CT-L. Where a plot demands a different shell size, start from the range rather than forcing a modification — comparable units in the same series cover different lengths, and a shorter or longer shell is usually easier to source than a custom one.

Is the listed power figure the running cost?

No. The total power value describes the installed electrical load of the reference configuration. Actual consumption depends on heating method, set temperature, filtration duty cycle and ambient conditions, none of which can be fixed in a catalogue entry.

What should the supplier confirm in writing before I accept a price?

A configuration sheet naming the equipment actually supplied — control system, pumps, jet count, lighting, treatment and heating — plus the electrical requirements for that configuration, the packing list, and the scope of installation and after-sales support. Anything not written there is not included.

To specify a swim spa against your own drawings, send the site envelope, use profile and target handover date to our project team and we will return a configuration sheet and consolidated quotation for the poolside package.