A wardrobe quote that looks complete at first glance often hides the decisions that actually drive cost and fit. Two quotations for frosted glass wardrobes can differ by a wide margin while describing what appears to be the same item, because one supplier priced a full made-to-measure set and the other priced a standard box with a door swap. Before you sign, walk through the following points and make sure each one is written into the document rather than assumed.
1. The measurement basis, not just the numbers
Check which dimensions the quote is built on: finished opening width, height and depth, or an overall external size. A made-to-measure wardrobe should be quoted against your actual opening, including skirting boards, cornices, uneven floors and any services running down the wall. Ask whether the supplier re-checks dimensions after the floor finish is laid, because a carpet or tile build-up of even a few millimetres changes what a sliding door can clear.
Confirm how the quote treats non-standard conditions: sloping ceilings, a beam crossing the opening, or a room where walls are out of square. If these items are not mentioned, they usually become a variation order later.
2. What "frosted glass" actually means in the specification
The wording on a quotation is rarely precise enough to compare two offers. Establish how the frosted effect is produced, what the panel is made of, and whether the finish faces inward or outward, since this changes both appearance and cleaning. Then check the edge treatment and whether the glass is framed or held in a channel.
Frame choice belongs in the same line item as the door. Our catalogue separates these options for a reason: frosted glass aluminium frame wardrobes pair the diffused panel with a metal surround, while a frameless version relies on different hardware and edge work. If your quote simply says "frosted glass door", ask for the frame profile and finish to be named.
Also check the adjacent finishes you will see every day — carcass colour, interior lining, and how the frame tone sits against the wall and flooring already specified for the room.
3. The internal layout behind the doors
Doors are what a quote describes in detail; interiors are where budgets go wrong. Ask for a shelf, hanging-rail and drawer schedule that matches how the space will be used, and check whether each item is priced per unit or included as a package. Hanging height, drawer count and the position of open display niches all affect price, and it is far cheaper to settle them on paper than on site.
If the layout mixes closed storage with open shelving, confirm that both are drawn and priced. Corner and walk-in configurations need their own treatment, so check whether the quote covers the awkward zones or simply stops at the straight runs.
4. Hardware, tolerances and what is excluded
Ask which hinges, runners, handles and door gear are quoted, and whether they are included or an allowance. A low quote often excludes hardware or lists it as "to be confirmed", which moves cost out of the comparison entirely. For sliding arrangements, check the track type and how the doors engage with the ceiling and floor.
Read the exclusions clause line by line. Common gaps are plinth and scribe work, packing for transport, and any site preparation the supplier expects someone else to complete.
5. Production, packing and delivery terms
For made-to-measure joinery, confirm what has to be signed off before production starts, since changes after that point carry cost and delay. Then check how panels and glass are packed and protected, and who carries the risk while goods are in transit. If your project sits overseas, ask which delivery term applies and where responsibility for the goods passes to you.
6. Installation and after-handover support
Clarify whether installation is included, who supplies the fitter, and what site conditions are expected on the day. Ask how defects and replacement parts are handled after handover, and what evidence you need to keep. A supplier that describes installation, inspection and after-sales support as part of the same scope usually leaves fewer loose ends than one that simply ships crates.
7. Comparing quotes on a like-for-like basis
Put every offer into one table with the same rows: opening dimensions, door construction and frame, carcass material and finish, interior schedule, hardware, packing, delivery term, installation and after-sales. Prices only become comparable once these rows are filled in; a cheaper total that leaves three of them blank is not a saving.
Working with one supplier across joinery and the rest of the fit-out reduces the coordination burden, because the same drawings govern several trades. That is how our custom bedroom wardrobe work is typically handled, from specification through to delivery.
A short pre-signature checklist
- Opening dimensions confirmed on site after floor finishes are complete
- Door construction, glass finish and frame profile named in writing
- Interior layout drawn and priced item by item
- Hardware specified rather than listed as an allowance
- Exclusions read and accounted for in your own budget
- Approval point before production clearly stated
- Packing, delivery term and responsibility transfer defined
- Installation scope and after-handover support described
A quote you can trust answers all eight points without a follow-up email. If it does not, send the list back to the supplier and ask them to complete it — the response tells you as much about the vendor as the price does.