A door quote that looks complete can still leave you comparing prices that are not actually comparable. Two suppliers may both write "wood veneer hinged door, 900 x 2100 mm" and deliver very different products, because the price depends on what sits behind the face veneer, how the edges and surfaces are finished, what hardware is included, and whether the frame and architrave are priced in. Before you commit to an order of Santerson Wood Veneer Hinged Doors for a villa or apartment package, work through the items below line by line.

Start with the door type and how it opens

Hinged doors are the most common internal door specification, but they are not the only option in a veneer finish. A quote that reads "veneer door" without stating the opening mechanism is incomplete. Confirm which of these you are actually being priced:

  • Hinged (swing) doors — leaf on hinges against a lining, opening into or out of the room. This is the standard bedroom and bathroom specification.
  • Flush hinged doors — a flat, unpanelled face with no mouldings or recesses.
  • Classic panel hinged doors — a panelled face, which changes both the appearance and how the leaf is built up.
  • Wood veneer pocket doors — sliding leaves that disappear into the wall cavity, which need a frame kit and structural allowance in the wall instead of hinges and a lining.
  • Wood veneer folding doors — bi-fold or multi-panel leaves on a track, used where a wide opening needs to close off completely.

This matters for cost comparison because pocket and folding doors carry track, hanger and wall-cavity costs that a hinged door does not. If your tender schedule lists different opening types per room, ask the supplier to quote each type separately rather than giving one blended rate per door.

Ask what is under the veneer

"Wood veneer" describes the face, not the core. Two doors with identical-looking faces can differ completely in the substrate and in how stable they will be once installed in a conditioned building. Ask the supplier to state, in writing:

  • The core construction of the leaf — whether it is a solid stave core, a blockboard or engineered board core, or a hollow-core construction.
  • The veneer species and cut you are being quoted, and whether the face is a natural wood veneer or a printed/reconstituted surface.
  • Whether the edges are veneered on all four sides, and whether the edge banding matches the face grain or is a butt-jointed mitre at the corners.
  • The number of veneer plies and whether both faces are balanced, which reduces the risk of the leaf cupping over time.

Santerson's door pages describe made-to-measure sizing with material and finish options chosen per project, so the core and face construction are things you specify and confirm on the order rather than assume from a catalogue image. Ask for a physical sample board showing the face veneer, the edge treatment and a cross-section of the leaf before you sign off a schedule.

Match the finish to the rest of the joinery package

If the same veneer appears elsewhere in the project, the doors will be judged against it. Where your specification already includes Wood Veneer Panels for wall cladding, or veneer joinery in the bedrooms and kitchen, ask for one consistent veneer lot across those items so grain figure and colour run together. The veneer finishes named across Santerson's ranges include:

  • Natural oak — light, open grain; the same species family used across the natural oak and natural wood veneer joinery lines.
  • Walnut — warm brown tones used in the walnut veneer joinery range.
  • Smoked veneer — deeper, darker tone for schemes that already use dark timber elements.
  • Matte finish — low-sheen surface, practical in high-traffic rooms because finger marks and glare are less visible.
  • High gloss — reflective lacquered surface; note that gloss shows handling marks during site installation more readily than matte.
  • Two tone — two veneer tones combined in one face, used where a scheme mixes light and dark joinery.

The specification detail to pin down is the topcoat, not just the species. State whether the surface is lacquered, oiled or left as a matte finish, and confirm the sheen level in writing. A "walnut" door quoted with a different topcoat from your wall panels will read as a mismatch even when the veneer matches.

Check what the price actually includes

This is where quotes diverge most. A per-door rate may or may not cover the surrounding components, and those components are usually quoted separately in a door schedule. Ask for a breakdown across these lines:

Line itemWhat to confirm
Door leafSize per opening, thickness, core, face and edge veneer, finish, number of leaves if double doors.
Lining / frameWhether the lining is included, its width to suit the actual wall build-up, material and finish.
Architrave / casingIncluded or excluded, profile, and whether it is supplied in the same veneer.
HingesQuantity per leaf, material, finish, and whether they are ball-bearing hinges.
Ironmongery prepWhether lock body, handle and strike prep is machined at the factory or left for site.
Locks and handlesIncluded in the door price, supplied by others, or quoted as a separate line.
GlazingIf any leaf carries glass, the glass type, thickness and glazing method.
PackagingEdge protection, individual wrapping and crate type for ocean freight.
Delivery termsIncoterms, port or door delivery, and who handles customs clearance.

Once you have that breakdown, you can compare suppliers honestly. A lower unit price that excludes linings, architrave and hinge prep is not cheaper than a higher all-in rate — it just moves the cost into a later variation.

Verify the openings before the schedule is released

Made-to-measure doors are an advantage only when the dimensions behind them are correct. For each opening in the door schedule, confirm:

  • The finished floor level — whether the quoted height is to structural slab or to the completed floor build-up, and how much tolerance remains for screed, adhesive and flooring.
  • The completed wall thickness the lining must suit, including plasterboard, render or cladding on both faces.
  • Clear opening width versus structural opening, with the deduction for the lining shown explicitly.
  • Hinge stiles and swing direction — which hand each door opens on, checked against furniture layouts and circulation.
  • The floor clearance under the leaf, especially where rugs, thresholds or underfloor heating are involved.

Ask the supplier to return a shop drawing for each door type, with the deductions and hardware positions marked, and have it signed off by your site team before production starts. Corrections made at that stage cost nothing; corrections after the leaves are pressed and veneered do not.

Look at freight, sequence and site handling

Veneer doors are a finish product travelling a long way, so the logistics line in the quote deserves the same attention as the door price. Confirm the packaging specification — edge protection, individual wrapping and crating for sea freight — and ask how the consignment is marked so each leaf can be matched to its opening on site. Numbering doors to match the room schedule avoids installers picking the wrong leaf at the last moment.

Also confirm the delivery sequence against your programme. Doors are usually one of the last items installed, and a consignment that arrives before the wet trades have finished sits in damp conditions, which is exactly what veneered leaves should not be exposed to. Santerson's logistics and door-to-door delivery service covers freight forwarding, customs paperwork and container loading; ask for the specific Incoterms, transit window and insurance scope for your port of entry in writing rather than relying on general service descriptions.

Put the after-sales terms in the order

Before signing, get the remedy terms stated in the purchase order: what happens if a leaf arrives damaged, if a shade band differs from the approved sample, or if a dimension is wrong. Ask which party bears return freight and replacement cost, and how claims are raised and evidenced — dated photographs against the numbered door schedule are far stronger than a general complaint after installation.

Santerson lists installation and after-sales support, including inspection and snags, warranty coverage and spare parts. Get the applicable terms confirmed for your project in writing, since general website wording is not a substitute for contract conditions.

Before you sign: a short checklist

  • Opening type named per room — hinged, pocket or folding.
  • Core construction and face veneer stated in writing, not implied by a photo.
  • Edge veneer on all four sides, with corner treatment described.
  • Topcoat and sheen level specified, matched to the rest of the joinery package.
  • Lining, architrave, hinges and ironmongery prep either included or priced separately.
  • Shop drawings signed off against finished floor levels and completed wall thicknesses.
  • Packaging, crating, consignment marking and Incoterms confirmed for your site.
  • Claim terms and replacement responsibility written into the purchase order.
Send the door schedule, the finished floor level details and your approved finish reference to the supplier together. A quote produced from complete information is a quote you can compare; one produced from a room count and a photograph is an estimate you will pay for later.