Before a single sconce, mirror light or LED strip reaches the site, the project team has to approve it. For bathroom work that approval usually starts with a product submittal: a package that lets the architect, consultant, contractor and client check what is actually being bought against what was drawn. Vanity lighting is where submittals fail most often, because the fixture sits at the junction of three trades — cabinetry, electrical and tiling — and because most bathroom ranges are made to measure rather than stocked in fixed sizes.
The checklist below is the one we use when our vanity lighting goes out to project teams, and it works just as well for wall sconces and mirror cabinets supplied from the same programme.
1. Identification: what exactly is being submitted
A submittal that cannot be traced back to a schedule line will come straight back. Every sheet should carry:
- the project name, room or bathroom type, and the fixture tag used on the lighting layout;
- our item code together with your own schedule reference, so both documents point at the same object;
- the revision number of the drawing or specification the item answers to, and the date of that document;
- a clear statement of what is included and what is supplied by others — transformer, driver, mounting frame, basin mixer, mirror glass.
This sounds administrative, but it is the part that protects you later. When a room type repeats across floors or villas, an untagged submittal gets applied to the wrong opening and the discrepancy only appears when the first fix is on site.
2. Dimensions tied to the vanity, not to the fixture alone
For made-to-measure pieces, dimensioned drawings are the core of the package. A vanity light submittal should show overall width, height and projection; the position and size of the wall outlet or cable outlet; the clearance needed behind the unit for the driver; and how the fitting relates to the mirror edge, the basin centre line and any adjacent cabinet. Our wall sconce ranges are specified per project, so the drawing states the size we intend to build rather than a catalogue band.
Where the light is integrated into a mirror cabinet or a vanity carcass, submit the two together. A separate lighting sheet and a separate joinery sheet is how a 40 mm clash between a driver housing and a drawer run gets missed.
3. Finish and material schedule
State the body material, the surface treatment, the glass or diffuser type, and the finish reference you are matching. Bathroom fittings are frequently specified to match taps, mirror frames or cabinet hardware from another supplier, so a colour name alone is not enough — give the code, and send a physical sample if the finish sits in a visible position. For custom work we confirm the finish against an approved sample before production, because plating and powder-coating tones shift between batches.
4. Electrical and control data
This is where reviewers ask the most questions, and where marketing literature helps least. The submittal should record:
- supply voltage and frequency for the destination market;
- lamp or module type, wattage per fitting and total connected load per room type;
- colour temperature and colour rendering index as specified — and the same values on the delivered module, not just the datasheet;
- dimming method and the driver or control gear being supplied, including whether it is included in our scope or provided locally;
- the zone the fitting is installed in and the protection rating we are supplying for that zone.
If a switch, sensor or dimmer is on the wall beside the basin, say so. Control arrangement changes cable counts, and discovering it after first fix means chasing electricians for a second pull.
5. Mounting method and interface details
Reviewers want to see how the fitting is held up and by whom. Include the fixing detail: bracket or hidden hanging system, the substrate it must be fixed to (timber noggin, plywood backing, tiled wall, glass), fastener type, and the maximum load. For heavier mirror cabinets this also covers whether reinforcement is required in the wall and who installs it. A dimensioned section through the wall build-up takes ten minutes to draw and prevents an argument on site.
6. Compliance documents for the destination market
Attach what the local authority and consultant actually require rather than whatever we happen to have: test certificates, the declared electrical ratings, packaging and shipping marks, and — where the project demands it — a statement from the manufacturer of the LED module. Because requirements differ by country and even by state, we confirm the applicable documents for each project before submission instead of assuming one certificate covers every market.
7. Commercial terms, spares and maintenance
The commercial page should list unit price by room type, minimum order quantity where it applies, packing and carton dimensions for the freight plan, and lead time from approved drawings. Add the spare-parts position: how many spare fittings or modules are recommended per floor or property type, and whether the LED module can be replaced by a local electrician or has to come from us. Hotel and rental owners ask this once at handover and then never again — which is why it should be answered in the submittal.
8. Approvals column and sign-off
Leave space for code A, B or C on every sheet, with the reviewer's name and date. State clearly what happens after approval: drawings go to production, and any change afterwards is treated as a variation with its own cost and lead time. This single line saves more programme time than anything else in the package.
How this fits into a wider bathroom package
Vanity lighting rarely travels alone. In villa and hospitality work we submit it alongside LED mirror cabinets, vanities, ceramics and the built-in storage of the same bathrooms, so dimensions, finishes and electrical data are checked once across the whole room. Coordinating those items through one supplier shortens the review cycle: one drawing set, one finish schedule, one revision log, and fewer consultants comparing documents from vendors who never spoke to each other.
If you are assembling a submittal pack for an Australian villa or hotel project, send us the room schedules and the lighting layout and we will return the dimensioned drawings, finish samples and electrical data for the pieces in your scope. Enquire through our turnkey project solutions page and we will confirm what each item covers before you submit it.