A corner is the hardest wall in a bedroom to fill and the easiest one to waste. A sliding door corner wardrobe solves two problems at once: it turns an awkward angle into usable hanging and shelving space, and its doors travel along a track instead of swinging out into the room. That second point is why these units are specified so often in apartments, hotel guest rooms, villa bedrooms and compact master suites where the floor area between the bed and the wall is already spoken for.
The trouble is that a checklist written for a straight-run wardrobe does not work on a corner. Door travel, return depth, internal access and track clearances all behave differently once two runs meet at 90 degrees. The list below follows the order we use when preparing made-to-measure joinery for residential and hospitality projects, from the first site measurement to the handover signature.
1. Site measurements that account for the corner itself
Before anything else, capture the geometry rather than a single length. A corner run needs both wall lengths measured to the finished face of the wall, plus the ceiling height at several points, because slab levels and ceiling grids rarely stay flat across two directions.
- Both leg lengths, measured from the finished wall face, not from plasterboard edges or skirting.
- Room height at the start, middle and end of each leg — a slope of a few millimetres over three metres changes the scribe allowance.
- Out-of-plumb readings on both walls, taken with a spirit level or laser, so the scribe cut can be planned instead of improvised on site.
- The position of every obstruction: switches, sockets, radiator tails, air-conditioning diffusers, downlights, skirting depth and any bulkhead that runs into the corner.
- Floor finish build-up — carpet, engineered boards or tile — because a sliding track sits on the floor and its height has to be reconciled with the threshold.
Where the two walls do not meet at a true right angle, say so in the enquiry. A made-to-measure unit can absorb that variance; a standard-sized module cannot, and the gap left behind is where quality shows or fails.
2. Door type, travel path and clearance
This is the item most checklists get wrong for corners. Sliding doors run in a straight line along one wall; they cannot bend around an angle. So the question is not simply "sliding or hinged", but which leg carries the track and what happens at the return.
- Track wall: confirm which leg the doors slide along, and check that the full door width has clear travel without hitting a wardrobe end, a door opening or a light switch.
- Return access: decide how the corner cavity is reached. A hinged return on one door set gives direct access to the apex; an open return keeps the corner visible but exposes contents.
- Door overlap: sliding panels need an overlap allowance and a pocket for the leading panel. Ask what the finished opening width is once the doors are parked, not just the carcass width.
- Clearance in front: measure the walkway left with the doors closed and with one panel open. A 600 mm deep unit plus a bed frame can leave very little room to stand.
If the room is tight, compare the corner option against the alternatives in the same collection before committing — an hinged door corner wardrobe needs swing room but gives full access to the apex, while an open corner wardrobe removes the door question entirely at the cost of dust and privacy.
3. Layout and internal configuration
Write down what actually has to live inside the unit, then let that drive the elevations rather than accepting a generic shelf plan.
- Hanging zones: long hanging for coats and dresses, short hanging for shirts, and a second rail above if ceiling height allows.
- Drawers and pull-outs: how many, and whether they clear the sliding door track when extended. A drawer into a corner apex is only useful if it can actually be pulled out past the door line.
- Shelving heights for folded stacks, boxes and luggage, plus a top compartment for off-season items.
- Accessories: trouser slides, tie rails, valet rods, lighting inside the carcass, and power for a steam or charging station.
- Corner-specific fittings: carousel or magic-corner hardware, pull-down rails for high shelves, and whether they are quoted as part of the unit or listed as extras.
For bedroom fit-outs that continue past the wardrobe, it is worth specifying the whole wall system together. Our combination modular wardrobes let a corner unit share a finish and profile with straight runs, tall cabinets and open display niches, so the joinery reads as one built-in rather than three purchases.
4. Materials, finishes and door fronts
Carcass board, edge treatment, door substrate and surface finish are separate decisions, and each should be named on the quotation. Ask what the panel thickness is, how edges are sealed in a humid bedroom or bathroom-adjacent wall, and whether the door front and carcass carry the same finish code.
| Door front direction | What to check on the quote |
|---|---|
| Mirror sliding panels | Mirror thickness, safety backing, frame profile, and how the mirror is fixed to the panel — mirror sliding door wardrobes are the usual choice where a full-length reflection is needed and wall space for a separate mirror is missing. |
| Glass panels | Toughened glass specification, tint or texture (clear, frosted, smoked, ribbed) and hardware colour — see glass sliding door wardrobes. |
| Matte lacquer or melamine | Finish code, sheen level and edge banding match — matte sliding door wardrobes suit low-glare bedroom schemes. |
| High gloss | Fingerprints and light spill in the room; high gloss sliding door wardrobes bounce light but show marks. |
| Wood grain and two-tone | Grain direction across panels and how the two tones meet at the corner — two tone sliding door wardrobes and wooden sliding door wardrobes. |
Order physical samples before signing. A finish photographed on a screen and the same finish under warm bedroom lighting are two different things, and re-making a corner set is far more expensive than re-making a straight one.
5. Hardware specification
Sliding doors live or die on hardware that nobody sees. Put the following in writing:
- Track and roller system, load rating per panel, and whether rollers are adjustable for height once installed.
- Bottom guide and floor track profile — a raised track collects dust; a flush track needs a level floor.
- Soft-close or dampers on doors, and which panels carry them.
- Hinge and drawer runner brand and cycle rating where hinged returns and drawers are part of the design.
- Door stoppers and anti-jump fittings, so panels cannot lift off the track under normal use.
Ask which components are stocked as spares. Rollers and guides are wear items on a heavily used guest-room wardrobe, and being able to order a replacement fitting years later is worth more than a slightly cheaper system today.
6. Documentation and approval pack
A serious supplier returns drawings before production, not after. The approval pack should contain elevations of both legs with overall and finished dimensions marked, internal layouts at each zone, door travel diagrams showing parked and open positions, finish schedules with codes, and a hardware schedule. Check that the corner apex dimension is drawn explicitly — this is where errors concentrate.
Sign the drawings yourself or have the site supervisor sign them. Once panels are cut to size, an unapproved drawing becomes a variation order.
7. Commercial terms and what is included
- Whether the price covers scribing, plinth or toe-kick, internal fittings, lighting and transformers, or only the carcass and doors.
- Packaging specification for export — corner panels and glass fronts are the pieces most likely to be damaged in transit.
- Delivery terms and who carries the goods from the kerb to the bedroom floor; a three-metre panel will not pass a stairwell unnoticed.
- Payment schedule tied to drawing approval, production release and despatch.
- Warranty scope for hardware as distinct from panels, and the process for reporting snags.
8. Delivery, installation and handover
Book a site check before the trade sequence closes: flooring laid, paint completed, skirting fixed and the ceiling level settled. Then confirm on the day that both leg lengths, the apex position and the floor level match the drawings before any panel is opened.
- Track set level and square along its own run, not copied from a suspect wall.
- Doors running quietly along the whole travel, with no catch at the pocket.
- Apex access usable in practice — open every drawer and pull-out with the doors in both positions.
- Scribe lines sealed, plinth fixed, internal lighting wired and tested.
- Snag list written down on the day, with spare rollers and guides handed over.
How a made-to-measure route removes most of this risk
Every item above is a question you only have to ask once if the unit is manufactured to your dimensions rather than adapted from a standard module. Our L shaped corner wardrobes and U shaped corner wardrobes are produced to project-specific dimensions, layouts and finishes, which is how an out-of-plumb wall or a non-right-angle corner gets resolved in the drawing stage instead of on site.
For villa and hotel work, the same approach covers the joinery around it. Custom minimalist bedroom wardrobes can be specified alongside vanity units, tall cabinets and wall panelling in one finish schedule, coordinated through our custom and OEM service and delivered under the workflow described on our service pages: consultation, design and planning, production, logistics, installation and after-sales.
SANTERSON has manufactured furniture and building materials for residential, villa and hospitality projects since 2008, with custom production, door-to-door logistics and installation support. Send your corner dimensions and layout requirements to start a made-to-measure quotation.