A request for quote for corner cabinetry with glazed doors usually comes back in one of two ways: a single number that means nothing when you compare it with another supplier, or a proper quotation you can put side by side with two others and defend to a client. The difference is almost never the supplier's willingness to help. It is what the buyer sent in the first place. Below is the information list we work from when a project sends us Glass Front Corner Cabinets or any other made-to-measure built-in item, and what each item actually changes on the supplier's side of the desk.

Start with the corner itself, not the catalogue page

Corner units are the part of a kitchen where an approximate drawing costs real money, because the internal hardware and the door geometry both depend on exact measurements. Our Glass Front Corner Cabinets are made to measure, with material and finish options and a layout tailored to the project, so the quotation is built from your dimensions rather than from a standard size. Send:

  • The two run lengths meeting at the corner, measured on site after the floor, wall finishes and ceiling are accounted for.
  • The actual corner angle. A 90-degree corner and an angled bay need different carcass construction, and a drawing that simply shows "corner" does not tell us which.
  • Whether the unit is wall-hung or floor-standing, and whether a plinth, scribe or filler is expected at the end panels.
  • Obstructions: soil stacks, boiler pipework, radiators, skirting depth, switch plates, extract ducting that passes behind the carcass.
  • Room height plus your intended finished ceiling and floor levels, so tall runs and any scribing are quoted once instead of corrected later.

A marked-up site sketch with dimensions on it is worth more than a clean architect's plan without them. If you have both, send both.

Say what sits behind the glass

Glazed doors are specified for a reason, and that reason drives the specification. Tell us whether the unit will display glassware and collectibles, store everyday dishes, or light an internal niche as part of the room design. Then state:

  • Door style: framed glass, aluminium frame with glass, frosted or smoked glass, or a mix of glazed upper doors with solid lower doors.
  • Glass type and colour you want quoted, plus whether the glazing is on one side or visible from two.
  • Shelf layout behind the doors: fixed shelves, adjustable pins, glass shelves, or a lighting provision with a transformer housed out of sight.
  • Door opening direction and how the unit relates to the appliance run and the traffic line past it.

This matters commercially because display shelving, internal lighting provisions and mixed glazed/solid fronts are quoted differently from a plain corner cupboard. If you do not know yet, say so and ask for two or three priced options instead of one; that is a normal request.

Give the material and finish direction in words you can check

"Grey, modern" is not a specification. Give us the substrate and surface family you want, or the sample reference you are working from. Our built-in kitchen ranges cover lacquer, acrylic, melamine, wood veneer, PVC and aluminium-frame fronts in matte, high-gloss, shaker and handleless treatments, so we can match a finish across corner units, tall cabinets and the rest of the run. Useful details:

  • Carcass material and thickness, and whether the carcass colour matches or contrasts with the doors.
  • Edge treatment on visible end panels.
  • Hardware brand or grade if your project has a schedule to follow, plus soft-close requirements.
  • Whether the same finish must continue into built-in furniture elsewhere in the property, which is worth stating early so panels are produced from one batch.

State the scope and who else is on site

A corner cabinet quotation gets wrong when the supplier assumes responsibilities the buyer never assigned. Be explicit about which of these you want quoted:

ItemWhat to write in the RFQ
Design inputDo you need layout proposals and 3D renderings from us, or are you sending finished drawings for pricing only?
Appliances and worktopsAre appliances and stone included in our scope, or is another trade supplying them? Give cut-out sizes either way.
Trade interfaceWho sets out, who first fixes, who connects plumbing and electrics, and which stage the cabinets are handed over at.
Site readiness dateThe date the site will actually be ready, not the date you would like it.
Delivery address and termsPort or door, and whether freight, customs clearance and on-site delivery are in your price or ours.
PackagingFlat-pack or assembled, plus any lift, stair or access limits at the delivery point.

For projects we handle as a package rather than a single item, this is where turnkey solutions come in: cabinetry is produced and coordinated alongside the other joinery, fixtures and finishes for the same property, with one production schedule instead of several suppliers chasing each other.

Numbers, quantities and the delivery sequence

Include the unit count and any repeats, since a corner unit repeated across several apartments is priced differently from one bespoke piece. Then state:

  • Your target budget band if you have one. It lets us remove cost from the specification instead of simply returning a figure over your ceiling.
  • The required on-site date, working backwards from it, and whether partial delivery is acceptable.
  • Payment terms you expect, currency, and the Incoterms you want priced.
  • Whether spares or spare doors should be quoted with the order — a corner glazed door replaced eighteen months later has to match an existing batch.

What a proper quotation should return to you

Judge the supplier by what comes back. A usable quotation lists each unit with dimensions and a line drawing, states carcass, door, glass and hardware specifications in writing, shows what is excluded, gives a production timeline measured from approved drawings rather than from the enquiry date, and prices freight to your stated address under named terms. If a reply contains only a total, ask for the breakdown before you compare it with anything.

Two things we ask buyers not to leave out: photographs of the corner in question, taken from both ends of the run, and the name of whoever signs off the drawings. Approval delays are the most common cause of a slipped delivery date on made-to-measure joinery.

A short pre-send checklist

Before you press send
  • Dimensions on the drawing, including the corner angle and room height.
  • Glass type, door style and internal shelf or lighting provision named.
  • Carcass and door finish specified, with sample reference if one exists.
  • Scope of work written out: design, appliances, worktops, trade interface.
  • Quantities, repeats, required site date, delivery address and Incoterms.
  • Payment terms and currency stated.
  • Site photographs and the drawing approver's name attached.

Send your drawings and measurements to us through the contact page, or via our custom and OEM service if you need prototyping, bespoke finishes or your own branding on the units. We will come back with a specification and a priced breakdown rather than a single figure.