A set of interior doors can decide whether a villa or hotel room reads as finished or as unfinished work. Because Classic Panel Hinged Doors are made to measure rather than picked off a shelf, the quality of your enquiry determines how fast and how accurately we can price them. This guide walks through exactly what information to send with your request for a custom quote, what our team confirms back at each stage, and which decisions you should settle before the order goes into production.

What a custom quote covers for made-to-measure doors

Our hinged door programme is built around project-specific sizing, material selection and finish options. That applies across the range — from Standard Interior Hinged Doors for straightforward room separations to Santerson Flush Hinged Doors and Santerson Handleless Concealed Doors where the goal is a clean, near-invisible wall line.

A custom quote for these doors is therefore not a single unit price. It is a package that reflects each opening you have on site, the construction and surface you want for every door type, the ironmongery set, and how the doors travel to your project. The more consistent your opening schedule is at the start, the fewer rounds of clarification we need before the numbers become firm.

Information to prepare before you send the enquiry

Send us the following and we can usually return a structured quotation rather than a rough indication. Where a drawing is not available, clear photographs with a tape measure in frame are acceptable.

Opening scheduleOne line per opening: reference or room name, leaf width and height, wall thickness, and the number of leaves. Note which doors swing left and which swing right.
Door type per locationWhich openings take a panelled door, which take a flush or concealed door, and which are feature doors that carry the decorative scheme.
Finish intentPainted, laminated, wood-veneer or textured surface; the colour, sheen or grain direction you expect; and whether the finish must match joinery or wall panelling elsewhere in the project.
IronmongeryHinges, handle set, lock case, closers and any fire- or acoustic-related hardware you have already specified. Tell us if ironmongery is supplied by others on site so we can prepare the leaves and frames correctly.
Quantities and phasingTotal quantity, plus how many doors you want released first if the site cannot take everything in one delivery.
Site and delivery detailsProject location, access constraints, and your preferred Incoterms or delivery point. For multi-trade fit-outs, tell us who coordinates on site.
Reference materialRoom data sheets, door schedules, elevations, mood boards or a photograph of a completed project you want to be matched to.

Decisions that shape the price most

Three choices move the quotation more than any others, and settling them early avoids rework later.

  • Construction and core. The internal build of the leaf follows how the door will be used — a bathroom door, a bedroom door and a suite entrance do not need the same make-up. Tell us the room type for each line in your schedule and we will propose the appropriate build.
  • Surface system. Painted surfaces, laminates and wood veneers behave differently on site and cost differently to produce. If you are matching an existing finish, send a sample or a physical reference rather than only a colour name.
  • Detail of the reveal. Frame, architrave and lining details determine how the door sits in the wall. A flush-aligned detail requires coordination with the wall trade; a panelled door with visible architrave is more forgiving. Decide which look you want per room type before we quote.

How the request for a custom quote moves through our team

Our cooperation steps follow the same sequence as the rest of our project work: a project brief and proposal, then quotation and detail confirmation, then production, shipment and follow-up. For doors this looks like the following.

  • Review and clarification. We read your schedule and come back with specific questions — usually about swing direction, wall build-ups or finish matching — rather than a generic form to fill in.
  • Specification proposal. For each door type we confirm construction, surface system, ironmongery preparation and the lining detail, so that you are comparing like for like across the schedule.
  • Priced quotation. Line-by-line pricing by door type and quantity, together with packaging and freight options to your delivery point. Where a finish or size falls outside our standard build, we flag it in the quotation instead of burying it.
  • Approval drawings and sign-off. Before cutting anything, we issue drawings for your confirmation. Production starts only after you sign them off.
  • Production, inspection and dispatch. Doors are packed for export and shipped to the agreed point; on request we coordinate delivery in stages to match site progress.

If your project also needs cabinetry, panelling or wardrobes from the same supplier, send those schedules in the same enquiry. Our Custom & OEM Service covers bespoke material, finish and texture choices across these product groups, which is often where consistency problems get solved — one specification owner for doors, joinery and wall surfaces rather than three.

What you receive in our reply

Every quotation we return states the door construction, surface system and ironmongery preparation for each line; the quantity and sizing basis; packaging and freight terms; and what is excluded. Anything still open at the time of quoting — a finish awaiting your sample, an opening whose wall build-up is not yet fixed — is listed as an assumption on the face of the document, so it cannot quietly become a variation later.

A practical tip for procurement teams: quote doors by door type and location, not as one blended lot. Blended pricing hides where the real cost sits — usually in concealed and flush details that need extra coordination with the wall trade — and makes value engineering almost impossible at review stage.

Common questions before ordering

Can you match a door to joinery already installed on site?

In most cases yes, but it needs a physical reference. Send us a sample panel, an offcut, or the make and code of the existing finish; a photograph alone is not reliable for grain and sheen matching.

What if my opening sizes differ from room to room?

That is normal on renovation work. Send measured sizes per opening, and where a wall is still to be built, note the intended finished dimension and who is responsible for achieving it.

Can I order doors in stages?

Yes. Tell us your phasing at enquiry stage so the specification and packaging are planned around it rather than adjusted afterwards.

Do you supply hardware with the doors?

We can, or we prepare the leaves and frames for hardware you source locally. Either way, state which route you intend so the preparation is quoted correctly.

Ready to price your door schedule?

Send your opening schedule, finish references and site details through our contact page, and we will come back with a specification proposal and a line-by-line custom quote. If you are still weighing up door types for particular rooms, browse the product range first and send us the two or three models closest to what you want — we will tell you plainly which ones suit your application and budget.