Open shelving in a bathroom either works quietly every day or becomes the place where towels pile up. Santerson Metal Frame Shelves sit in our Open Shelving range for residential bathroom projects, and they are made to be configured rather than ordered off a shelf: finish, layout and dimensions are specified per space. This guide walks through exactly what to send us so the quotation comes back accurate the first time, with fewer rounds of clarification.
What "custom" actually covers on this product
The detail page for Metal Frame Shelves describes configurable metal-frame shelving for residential bathroom projects. Three variables drive the price and the fit: the finish you select, the layout of the shelves, and the overall dimensions that suit the wall you are fitting them to. Nothing on that page fixes a single size or a single material for every installation, which is why we ask project teams to confirm material, finish and intended loading for each configuration before we lock production.
That confirmation step matters more than it sounds. A shelf over a basin carries different items from a shelf beside a bath, and the two need different structural decisions. Tell us what will actually sit on each shelf — glass bottles, folded linen, a tray of daily products, decorative pieces — and we can match the frame and shelf construction to that duty instead of guessing.
Information to prepare before you send the enquiry
The faster quotes we receive come with a short, complete brief. Send these items and we can usually price without a second round of questions:
- Room context. Which bathroom, which wall, and whether the wall is tiled, plasterboard, masonry or timber-framed. Substrate affects how the unit is fixed.
- Overall width and height of the area you want shelving to occupy, plus the depth you need for your products.
- Clearance points. Position of basins, taps, mirror cabinets, towel rails, shower screens, light switches and any pipework that must be avoided or worked around.
- Layout preference. Number of shelf levels, whether you want open bays or a mix with closed storage nearby, and whether the unit should read as a light frame or a more solid presence in the room.
- Finish direction. Send a finish sample reference, a project colour schedule, or photographs of neighbouring fixtures so the metal tone is matched to hardware already specified.
- Intended loading per shelf, stated in plain terms rather than assumed.
- Quantity and site location, including whether units repeat across several bathrooms on the same project.
A marked-up drawing is helpful but not required. A photograph of the wall with dimensions written on it is enough to start a conversation.
How the quotation request moves through our process
Metal Frame Shelves are handled inside the same cooperation steps we use for other project products: a project brief and design proposal first, then quotation and detail confirmation, then production, shipment and follow-up. That sequence is described on our interior design services pages, and the wider workflow — consultation, design and planning, production, logistics, installation and after-sales — sits under turnkey solutions.
| Stage 1 — Brief and proposal | You send the room information listed above. We review it against the Open Shelving configuration options and come back with questions where the drawings are ambiguous. |
| Stage 2 — Quotation and detail confirmation | Dimensions, finish and layout are confirmed in writing before production. This is also where we settle material selection for the stated loading. |
| Stage 3 — Production and shipment | Manufacturing follows the confirmed specification, with our logistics and door-to-door delivery service handling freight, packaging and container loading. |
| Stage 4 — Installation and after-sales | Fixing details are agreed before the units arrive so the site is prepared. Our installation and after-sales support page covers on-site installation, inspection and snag lists. |
Combining the shelving with the rest of the bathroom joinery
Metal-frame open shelving rarely specifies well in isolation. It sits next to a vanity, under a mirror cabinet, beside a tall cabinet, and the lines, tones and shadow gaps have to agree. Because we manufacture across interior fixtures as well as furniture, bathroom fit-out items can be quoted together rather than coordinated between unrelated suppliers:
- Floating vanities — shelving above or beside a wall-hung vanity needs the frame depth and the basin overhang resolved together.
- LED mirror cabinets — power for lighting has to be planned before the shelving layout is finalised.
- Glass shelves and corner open shelving — alternative or companion options where a metal frame is not the right read in a particular room.
- Open shelf tall cabinets — useful when floor-to-ceiling storage is needed and the open shelving should stop at a datum line that matches.
- Shelving accessories — the small fittings that decide whether open shelves stay tidy in use.
Where a project needs a bespoke finish, texture or dimension beyond our standard configuration options, the same enquiry can be routed through our custom and OEM service, which covers custom furniture design, bespoke material finishes and prototyping.
Questions that come up most often at the quoting stage
Can I quote from a standard size instead of a site measurement?
You can ask for an indicative figure, but the detail page does not publish one fixed size for this product — dimensions are specified per project. A quotation built on a real wall measurement is the one that survives construction.
What if the tiled wall cannot be drilled in the ideal positions?
Tell us at the enquiry stage, not after delivery. Send photographs and note where fixing is restricted; we can adjust the frame geometry or the fixing method rather than leave the site to improvise.
Do you supply shelving alone, or as part of a wider package?
Both. Many clients order it as one line inside a bathroom fit-out that also includes vanities, mirror cabinets and tall cabinets from the same production run, which keeps finishes consistent across the room.
Before you press send
Checklist: wall dimensions and depth · substrate type · clearance points marked · shelf levels decided · finish reference attached · loading stated per shelf · quantity and site location confirmed.
Send your brief to the SANTERSON contact team with the product name in the subject line. We will confirm material, finish and loading assumptions for your configuration before production begins.
SANTERSON is a China-based furniture and building materials supplier working on residential, villa and hospitality projects since 2008, covering design coordination, manufacturing, logistics and installation support.