A materials schedule that covers tiles, paint and cabinetry but stops there tends to fall apart at the joinery stage, and the display joinery is usually the item nobody priced. Santerson Open Display Units sit in exactly that gap: made-to-measure open shelving and display joinery that has to be specified early enough to match the wall finishes, the lighting circuits and the flooring around them. This guide shows procurement teams and project designers how to put those units into a whole-project schedule, line by line, so they arrive on site with everything else rather than as an expensive afterthought.

Why open display units belong in the main schedule

Open display units are fixed joinery. They attach to the wall, they meet the skirting and cornice, they carry recessed lighting, and their finish has to match the cabinetry and panelling specified elsewhere in the same building. Specify them late and three problems follow: the wall finish is already laid and cannot be rebated for a recessed niche; the electrical contractor has closed the wall and ceiling circuits without a feed for shelf lighting; and the joinery colour has to be matched by eye to a sample board that no longer matches the doors delivered last month.

The interior fixtures range we supply is configured per project, so sizing, layout and finish are set from your drawings rather than picked from a fixed catalogue size. That flexibility only helps if the specification is written into the schedule at the same time as the rest of the fit-out.

Step 1: list every display location on the room schedule

Start with the room-by-room schedule you already use, not with a product catalogue. For each space where an open display is intended — living room media wall, guest suite dresser wall, lobby feature wall, study shelving — record one line item. Give it a unique tag that your drawings will repeat, so the same reference appears on the joinery detail, the electrical layout and the delivery note.

Where an open display is part of a larger wall build-up rather than a stand-alone cabinet, schedule it as a sub-item under the wall system. Santerson Open Display Niches are recessed display bays inside integrated storage walls, and they need the surrounding panel to be built around them. Santerson Full Height Storage Walls run floor to ceiling and typically combine closed carcasses with open bays, so the schedule line should state which portion is open and which is enclosed.

Step 2: fix dimensions from site surveys, not architectural defaults

Open display units are made to measure, so the schedule should carry survey-derived figures rather than nominal ones. For each tagged item record:

  • Overall width and height of the opening as built, plus the wall construction it will be fixed to.
  • Bay depth and shelf spacing, noting where a taller item — a decanter, a stack of catalogues, a framed piece — sets the minimum clear height.
  • Floor-to-ceiling clearance under finished floor level, including any screed or flooring build-up that is still to be laid.
  • Set-back from the wall face, which determines whether the unit reads as a shelf or as furniture standing in the room.

If a display sits next to glass-fronted storage, schedule both together so the frames and shadow gaps line up. Glass Front Display Cabinets in the same collection are specified on the same dimensions and finish logic, and pairing open bays with glazed cabinets in one line item keeps the two elements consistent.

Step 3: state material and finish using the project reference, not a colour name

Colour names drift between suppliers and even between batches. In the schedule, tie each display unit to the finish reference already used for cabinetry and panelling in that building — the same veneer, lacquer, melamine or aluminium frame specified elsewhere. Our catalogue covers those finishes across wardrobes, kitchen cabinets and wall paneling, so a matching line is usually available rather than something that has to be re-created.

Where an open bay abuts a decorative surface, note the adjacent finish in the same row. A timber shelf against a stone-look panel and the same shelf against a textured painted panel are different details: the edge treatment, the fixing method and the rebate all change. Writing the adjacency into the schedule is what lets the factory pre-finish those edges instead of leaving them to be cut on site.

Step 4: coordinate lighting and services in the same row

Open display shelving without a lighting provision reads as unfinished. For each item, state whether the bay takes concealed strip lighting, a small downlight in the header, or no lighting at all — and if it does take lighting, put the driver location and the switched circuit on the schedule line too. Santerson Integrated Cabinet Lighting is specified with the joinery so the cable routes and driver access are built into the carcass; confirm the electrical specification and compatibility for each cabinet design before the drawings are issued.

This is the coordination step most often skipped. The electrical contractor works from a lighting layout, the joiner works from a furniture layout, and neither drawing mentions the other. One schedule row that names both disciplines closes that gap.

Step 5: group the order with related built-ins to simplify production and delivery

A whole-project schedule is easier to manage when display units are ordered alongside the built-ins they have to match — wardrobes, kitchen cabinets, tall cabinets, media units and panelling. As a one-stop furniture and building materials supplier, we produce these elements in the same facility against the same finish references, which removes the batch-matching risk between trades.

Grouping also affects logistics. Display units are bulky, awkward and easily damaged if they travel separately and sit in a store yard for six weeks. When they arrive in the same container as the rest of the joinery, they follow one delivery sequence, one inspection and one installation window.

Step 6: write acceptance criteria you can actually check on site

Close each schedule line with what "accepted" means for that item. For open display units the practical checks are short and specific:

  • Bay widths and shelf heights match the tagged drawing dimension within the tolerance agreed on the drawing.
  • Finish matches the approved sample reference under site lighting, checked at the viewing height a user will actually stand at.
  • Shelves are level, with no visible sag across the clear span once loaded with the intended display items.
  • Lighting, where specified, operates from the correct switch with the driver accessible for maintenance.
  • Joints to wall, floor and ceiling are tight, with skirting and cornice returning cleanly into the unit.

Under installation and after-sales support, installation visits include inspection and snag resolution, so recording these criteria in advance gives both sides the same checklist rather than a debate on site.

A practical schedule template for display joinery

ColumnWhat to record
TagUnique reference repeated on drawings, delivery note and installation plan.
LocationRoom and wall face, e.g. living room north wall, guest suite west wall.
TypeStand-alone open unit, recessed niche in a storage wall, or open bays within a full-height wall.
Surveyed sizeWidth, height, depth at finished levels, plus clear bay heights.
Finish referenceThe project finish code already used for cabinetry or panelling in that space.
LightingStrip, downlight or none; driver location; switched circuit.
Adjacent finishesWall, floor and ceiling materials the unit meets, so edges can be pre-finished.
Delivery phaseContainer and delivery window shared with related built-ins.
Acceptance checksThe five site checks listed above, applied to this item.

Fill those nine columns and the display joinery stops being a special case. It becomes another set of lines in a schedule your trades already know how to read.

Getting the specification back from drawings

If your project does not yet have joinery details for these walls, send us the room layout and finish palette and we will return configurations against your tags — dimensions, materials, finish options and lighting provisions to check before anything is cut. Our custom & OEM service covers bespoke sizes, finishes and textures for project-specific joinery, and the turnkey solutions pages describe how design, production, logistics and installation are handled as one package.