An arched French door is one of the few openings in a home that changes how a room reads from both sides. Because the arch, the frame and the glazing bars all have to be resolved together, it cannot be ordered off a standard size list. This guide walks through exactly what to send us so that the quotation for Santerson Arched French Doors comes back accurate the first time, with no rework on drawings and no surprises at installation.

Why arched doors are quoted as a project item

These doors are made to measure. The finish, the layout and the dimensions are specified to suit each opening, which means the price follows from the drawing rather than from a catalogue line. Two openings that look identical in photographs can carry very different costs once you account for head height, whether the arch springs from the reveal or sits on a transom, how many leaves the opening is divided into, and what hardware set is required to carry the weight of each leaf.

For that reason we do not send a price from a size alone. We need enough information to draw the door, and the drawing is what both sides sign off before production starts.

What to prepare before you write to us

The following items are the ones that decide how quickly we can return a firm quotation. Send them together and the first reply will normally carry real numbers rather than a budget range.

  • Opening dimensions. Overall width and height, plus the radius or rise of the arch and the height at which the curve begins. Note whether the opening is a structural aperture that still has to be formed or an existing finished opening we are fitting into.
  • Leaf layout and operation. Single, double or multiple leaves; hinged, sliding or folding; which leaf is active; and whether the doors are expected to open fully onto a terrace or stay closed as a visual division.
  • Material and finish direction. The product line offers material and finish options. A reference sample, a paint or stain code, or a photograph of an existing joinery item on site gives us something concrete to match instead of an approximation.
  • Glazing and sightlines. Whether the leaves are fully glazed, part panelled, or divided by glazing bars, and how many divisions you want across the arch. Slimmer frames change both the look and the construction, so state your preference early — our Santerson Modern Slim Frame French Doors are the reference point if a narrow profile is the goal.
  • Hardware expectations. Handles, locks, hinges and any door closer or threshold detail. If accessibility or a flush threshold matters, say so at this stage rather than at handover.
  • Quantity and location. How many sets are required, the delivery destination, and whether the doors form part of a wider fit-out. Doors specified alongside decorative interior doors can be coordinated as one package, which keeps reveals, finishes and ironmongery consistent across the floor.
  • Programme. The date the openings need to be weather-tight or finished, working backwards from your site sequence.

What you receive back

Once we hold the dimensions and the layout intent, the enquiry moves through the same stages as any custom item on our side: design consultation and space planning, material selection and product specification, then manufacturing with quality control under project management. You review the drawing and the confirmed specification before anything is cut. That confirmation step is where dimensions, finish codes and hardware schedules are locked; changes after it cost time and money, so treat the drawing review as a genuine decision point and not a formality.

Coordinating the doors with the rest of the fit-out

Arched openings rarely sit alone. They meet skirting, architrave, plaster or panelling on one side and flooring on the other, and a mismatch in any of those reveals poor workmanship regardless of door quality. Where the doors are part of a villa or hospitality project, we produce them within the same package as cabinetry, wall panelling and joinery, so the arch profile, the wood tone and the metal finishes are resolved once instead of being negotiated between several suppliers.

This also affects logistics. Doors, frames and ironmongery travelling together in one shipment means fewer consignments to track, fewer customs entries to reconcile, and one installation sequence on site rather than three. If the destination is outside China, tell us at enquiry stage so that packaging and container loading are planned around the door sizes — oversized arched leaves need crating decisions made before loading, not after.

Questions worth asking us directly

  • Which frame construction suits my span and arch radius, and where does the arch line fall relative to the reveal?
  • What is the maximum leaf size for the layout I have drawn, and how does that affect hinge count?
  • Can the finish be matched to a sample I supply, and what tolerance should I expect on a stained or painted surface?
  • Is the glazing unit sealed for external exposure, given my opening faces weather?
  • What is included in the price: frame, leaves, ironmongery, seals, threshold, and fixing material?

These are the questions that separate a quotation you can compare from a quotation you cannot. If a supplier answers them without being asked, read it as a sign of how the order will be handled.

Send us the opening dimensions, a sketch or marked-up photograph, your leaf layout and the finish direction, and we will return a drawing with the quotation attached. Confirm the specification before production begins, and the order moves into manufacturing on that basis.

If you are specifying several openings on one project, send the full schedule rather than one door at a time. Grouped enquiries let us standardise what can be standardised and price the arched items properly, which is usually where the real saving sits.