An arched niche and full house custom wall cabinet package looks effortless on site: curved arches, flush wood grain panels, lit display niches, a hidden wardrobe that runs floor to ceiling, an integrated vanity and a stone bathroom top. That effortlessness is exactly why the after-sales conversation matters. Built-in joinery is fixed to the building, so any correction costs more once the paint, skirting and adjoining trades have finished around it. Before you place the order, here is what a serious buyer should ask about.

1. What exactly is covered, and for how long

Ask for the warranty in writing, itemised by component rather than as one blanket sentence. A full-house wall package is not a single product; it is panels, carcasses, doors, drawer runners, hinges, glass, internal lighting, a worktop and sometimes stone. Each ages differently.

  • Which parts are covered: panels and finish, cabinet structure, hardware, integrated lighting, countertop?
  • What is the start date — shipment, delivery or handover after installation?
  • What voids the cover: site-made cutting, wall preparation you did yourself, cleaning products, humidity from a wet area?
  • Are touch-up materials supplied for the exact finish, in case a panel is damaged on site later?

Our Furniture Installation and After-sales Support page describes what the service covers: on-site installation, inspection with a snag list, warranty coverage, spare parts or replacement, and ongoing maintenance. Read it against your own scope and ask us to confirm in writing which of those apply to your package.

2. How spares and matching panels are handled years later

The most expensive failure in custom joinery is not a broken part — it is a replacement panel that does not match. Wood grain direction, arch radius, lacquer sheen and glass tint all vary between batches.

  • Will the exact panel code, colour reference, arch radius and hardware model be recorded in your project file?
  • Can a replacement door, shelf or niche insert be ordered later without re-making the whole wall?
  • How long are those references kept for a made-to-measure run?
  • Which hardware is standard and replaceable locally — hinges, runners, handles, lighting drivers?

For our Arched Niche & Full House Custom Wall Cabinet Project, the arch shape, panel material, wood colour and storage layout are all customised per space. That freedom is the point of the product, and it is also why the specification record — not just the invoice — is your after-sales protection.

3. Who fixes site fit problems, and how fast

Custom wall cabinets fail on site for predictable reasons: out-of-plumb walls, uneven floors, ceiling level variation, services in the wrong place. Ask how each is resolved before panels are made.

  • Who takes the site survey, and who re-measures after your trades finish first fix?
  • If a wall is out of plumb, do we scribe and adjust on site, or remake the panel?
  • What is the response path when something arrives damaged — photos to whom, replacement shipped from where?
  • Who supervises installation, and who signs off the snag list at handover?

We provide the one-stop scope for this type of package: site measurement, 3D rendering, manufacturing and on-site installation. Confirm the survey date and the sign-off process in your contract, so a level or plumb problem is caught before production rather than at handover.

4. Integrated lighting and electrics: the part people forget

Lit niches and floating shelves are what make an arched wall read as designed rather than fitted. They are also the component most likely to cause a call-back, because the driver sits behind joinery that was built around it.

  • Where is the LED driver accessible — inside a reachable cabinet, or sealed above a fixed panel?
  • Are drivers and profiles standard sizes you can source locally, or project-specific parts?
  • What voltage and dimming protocol was used, and does it match your switch and electrician's system?
  • Who is responsible for the final connection on site — our installer or your electrician?

Our Integrated Cabinet Lighting range is configurable for each design, and electrical specification should be confirmed against your cabinet drawings before the wall is manufactured. Ask for that confirmation in writing; it prevents an electrician from being told at handover that a driver has no access point.

5. Stone, glass and vanity tops: what happens if they crack in transit or on site

A marble or engineered-stone top and arched textured glass are the two items most often damaged late — after cabinets are already fixed to the wall.

  • How are stone tops and glass packed, and are they crated separately from cabinetry?
  • What is the claim window for transit damage, and what photographic evidence do you need on the day of delivery?
  • If a top breaks after delivery, can a replacement be re-cut to the same dimensions and edge profile?
  • For a double-sink vanity, who coordinates basin cut-outs with your tapware and waste sizes?

Where your package includes an integrated countertop vanity, ask for the cut-out drawing to be signed off before production. Our Integrated Countertop Vanity options are specified per project, so basin, tapware and waste positions should be locked early rather than adjusted on site.

6. Delivery, storage and the sequence with other trades

After-sales support starts before installation. Custom panels arriving into a busy villa site need a plan.

  • Which shipment — sea, air or rail — and what is the delivery address and final-mile arrangement?
  • Where should panels be stored on site: dry, flat, off the floor, away from wet trades?
  • Do our installers need the room to be complete — paint, flooring, skirting, electrical first fix — before they start?
  • Who clears and protects the space after installation, before handover?

Our Furniture Logistics and Door-to-door Delivery service covers freight forwarding, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. Ask us to align the delivery date with your on-site programme so nothing sits in a damp room waiting for a painter.

7. What you should receive at handover

A clean handover pack is what makes the next five years easy. Ask for it to be listed in the order confirmation.

Handover checklist to request

  • As-built drawings of every wall unit, with panel codes and finish references
  • Hardware schedule: hinge, runner and handle model numbers
  • Lighting schedule: driver location, wattage, colour temperature, dimming type
  • Stone and glass specification with slab or tint reference
  • Signed snag list and the date each item was closed out
  • Care and cleaning instructions for the specific finish, not generic advice
  • A named contact for warranty and spare-part requests

Keep this pack with your project file. When a hinge fails in year three or you want to extend one wall, the drawing and codes are what let us quote it correctly instead of starting from scratch.

8. Extending or changing the wall later

Full-house joinery gets modified: a niche becomes a desk, a wardrobe gains a drawer bank, a second bedroom gets the same language of arches. Ask now whether that is supported.

  • Can additional units be made later to match an existing wall, and at what lead time?
  • Are modular components used where possible, so shelves and inserts can be reconfigured?
  • If you are furnishing the rest of the house in phases, can one supplier carry the whole scope?

For phased work, our Full Height Storage Walls and Custom Niche Paneling are made to measure with configurable materials, finishes and layouts, which makes it practical to repeat the same detailing room by room. As a One-stop Furniture and Building Materials Supplier, we can carry cabinetry alongside the other fixtures in the same package rather than leaving you to coordinate several vendors.

Questions worth asking before you order

  • Which components of my wall package are under warranty, and from which date?
  • Will panel codes, arch radius and hardware models be archived for future replacements?
  • Who is accountable if a site measurement turns out wrong after production starts?
  • Where is the lighting driver accessible, and can I buy its parts locally?
  • What happens if the stone top or glass is damaged after delivery but before handover?
  • What documents do I receive at handover, and are they listed in the order confirmation?

Warranty terms, response times and installer arrangements vary by project and destination. Ask for the specific figures that apply to your package in writing before ordering; the service pages describe scope, not a guaranteed timeline.

If you are specifying an arched niche and full house wall cabinet package, send us the floor plans and the arch detail you want, and we will confirm measurement, rendering, production and on-site installation as one scope — including what we cover after handover. Contact SANTERSON to start the specification.