A set of wood veneer hinged doors looks identical on a drawing and completely different on site the moment the opening is two millimetres out, the floor finish changes height, or the grain on the next leaf does not match its neighbour. Because these doors are made to measure rather than taken off a shelf, almost every problem we see traced back to production starts with something that was never confirmed on paper. Before your wood veneer hinged doors enter manufacturing, here is what needs a written answer.

Rule of thumb: if a decision changes the price, the lead time or whether the door fits, it belongs in the drawing and the purchase order — not in an email thread.

1. Openings, and which trade owns them

Send us finished-dimension drawings, not structural ones. A veneer door is built around the opening as it will be at handover, so we need to know what sits on the floor, against the wall and above the head.

  • Clear opening width and height, measured at three points across each dimension, with the smallest value noted.
  • Floor build-up: screed, adhesive, engineered wood flooring or tile thickness — and whether the threshold continues through the opening.
  • Wall finish on both faces, plus the total wall thickness if the frame is to be returned or cased.
  • Head condition: structural slab, ceiling grid, or a bulkhead that will be built later.
  • Who prepares and rectifies the openings — the local builder or the door supplier. Put it in one contract, not two.

Confirm the dimensions on site before production begins. Tolerances are agreed per project and depend on the frame system, so ask us what we need rather than assuming a standard figure applies.

2. Hardware that carries the door

Veneer is a finish, not a structure. What decides whether the door still hangs straight in year five is the core, the hinges and the frame.

  • Leaf construction and thickness, agreed against the opening size and the daily traffic the door will take.
  • Hinge type, grade and quantity — set by leaf weight and size, and matched to the frame fixing detail.
  • Lock body, keep, strike and handle set, including whether the handle is one-sided or through.
  • Swing direction and latch edge for every single leaf, drawn on the plan and numbered room by room.
  • Frame material and profile, architrave or shadow gap, and how the frame meets the wall finish.
  • Fire-rated or acoustic leaves where the project requires them. The specification must be given to us at enquiry — it is not something to add after the doors are cut.

If a local hardware brand must be used for warranty reasons, tell us the exact model. We design the pre-cut and pre-drill to that item, or we leave the leaf blank for your fitter — both are fine as long as it is decided in advance.

3. The veneer itself

This is where samples earn their keep. Two batches of the same species can look unrelated once they are under a site spotlight, so the veneer decision should be closed with physical references, not a colour name.

  • Species and cut — crown, quarter or rift sawn — because the cut changes how wide and busy the figure looks on a tall leaf.
  • Whether leaves are grain-matched across the set or book-matched in pairs, and which layout applies to each opening.
  • Edge treatment: solid wood lipping, ABS edge or a mitred veneer wrap. This is visible at every reveal.
  • Finish build — matte, satin or gloss lacquer, open pore or closed — and how it sits next to the veneer cabinetry in the same property.
  • Approved sample with a reference number, date and signature. Keep it; it is what you inspect against at delivery.

Order the door sample and the matching wall panel sample together. Doors specified in isolation are the most common reason a veneer scheme looks like three different projects.

4. How the doors relate to the rest of the joinery

On villa and apartment work we usually supply doors alongside wardrobes, media walls and kitchen cabinetry. Producing them in one factory run is what keeps grain, sheen level and edge detail consistent across the property.

  • Issue one finish schedule covering doors, hinged wardrobes, panelling and any folding or pocket doors in the same scheme.
  • Number every opening on the plan and use that same number on the door schedule, the packing list and the site setting-out drawing.
  • Check reveal heights and architrave profiles against adjacent built-in units before anything is cut.
  • Where a concealed or flush detail is required, confirm the flush hinged option early — it changes both the frame and the wall build-up.

5. Documentation that unlocks production

We release a door order for manufacturing once the following are signed off. Missing items are the usual cause of a schedule slipping.

ItemWhy it matters before production
Signed door scheduleOne line per leaf: number, size, swing, hardware, finish. Verbal or chat-based changes are not manufactured.
Approved setting-out drawingConfirms frame lines, floor levels and wall finishes at each opening.
Hardware list with modelsDetermines pre-cut and pre-drill positions on the leaf and frame.
Signed veneer and finish sampleThe inspection reference at goods-in and at handover.
Delivery terms and site accessAffects packing, crate size, offloading and whether a tail-lift is needed.
Storage plan on siteVeneer leaves need a dry, flat, acclimatised store — not an open ground floor.

Our custom and OEM service covers bespoke material, finish and texture selection with flexible order quantities, so a project can specify one unusual veneer across doors and cabinetry without a separate supplier for each.

6. Delivery sequence and site readiness

Doors arrive too early and they get damaged or stolen; too late and the whole fit-out stalls. Fix the delivery window against your own programme, not ours.

  • Confirm wet trades — plaster, screed, paint — are complete and dry in the areas where doors will be stored and hung.
  • Agree crate sequence by floor or zone so fitters are not unloading a whole building at once.
  • Confirm who handles offloading and internal transfer on site.
  • Book a snag inspection with your installer after hanging: swing, latch, gap consistency and finish condition.

We arrange logistics and door-to-door delivery, including packaging, container loading and customs paperwork, and provide installation and after-sales support. Import terms, duties and transit arrangements are confirmed project by project with your team, since they depend on destination and order size.

Before you release the order: five questions

  • Are all openings measured to finished levels, with the smallest dimension recorded?
  • Is every leaf numbered on a plan that matches the door schedule?
  • Are hinge grade, lock body and handle model named, not described generically?
  • Is a signed veneer and finish sample on file with a reference number?
  • Is the delivery window agreed against site readiness, with storage confirmed?

If any answer is "not yet", hold production. A two-week pause at specification stage costs far less than remaking leaves.

Send us your door schedule, opening drawings and finish references, and we will return a quotation with the specification gaps flagged before anything goes into manufacturing. As a China-based furniture and building materials manufacturer, SANTERSON produces veneer doors alongside cabinetry, panelling and the rest of the interior package, so grain and finish are matched across the whole project rather than negotiated between suppliers.