A design brief for a facade or feature wall usually arrives as a mood board, a few elevations and a line that reads "lightweight metal panel, large format, flat joint". Turning that into a aluminium honeycomb panel for building exterior and interior wall cladding is a sequencing problem, not a shopping problem. The steps below follow the order we work in on villa, hotel and office projects: fix the scope, choose the face build-up, lock the fabrication details, then let one supplier carry design coordination through to delivery.

1. Turn the brief into a cladding scope before asking for a price

Most stalled enquiries we receive describe a product but not an assembly. Before anything is quoted, put these items in writing on one page, because each of them changes panel cost and lead time:

  • Location of the cladding. Exterior facade and curtain wall behave differently from interior wall decoration and partition panels. Sun exposure, driving rain and thermal movement apply to the outside face; sightlines, impact and cleaning access apply inside.
  • Panel size and module grid. Note the largest panel the substrate and lifting route can accept, not only the size the drawing shows. Large-format panels are where a honeycomb core earns its keep, since flatness is held while weight stays low.
  • Fixing method and subframe. State whether panels are mechanically fixed to a subframe or applied to a prepared wall, and who supplies the subframe, brackets and trims. This is the most common gap between a sales quotation and a site-ready package.
  • Finish direction. Solid coating colour, natural stone veneer face or perforated surface are three different build-ups with three different sample routes. Attach the reference image or colour code, not just the word "grey".
  • Performance requirements as written by the specifier. Fire performance, weather resistance and sound insulation appear on most commercial briefs. Quote the requirement exactly as it appears in your documents and ask us to confirm what our panel build-up supports for that specific project — do not assume a catalogue claim transfers to your jurisdiction.

2. Choose the face build-up that matches the brief

An aluminium honeycomb panel is a sandwich: two aluminium face sheets bonded to an aluminium honeycomb core. The core gives stiffness at low weight; the face sheet and its finish decide how the wall reads and how it ages outdoors. Three options cover most of what buyers ask for.

Build-upWhere it fitsWhat to confirm before production
Solid coated faceExterior facades, lobby walls, lift lobbies, office partition panelsColour reference and sheen, coating system for the exposure condition, panel thickness and core density
Natural stone veneer faceHotel reception feature walls, villa exterior walls where stone appearance is required without stone massStone type, vein direction and joint pattern, panel size limits for the chosen stone
Perforated faceAcoustic treatment behind feature walls, plant and service screens, ceilings carried into the wall linePerforation pattern and open area, backing layer, whether the perforated side faces the room

If your project also needs a ceiling in the same metal language, our aluminium U baffle and strip ceiling range can be coordinated with the wall module so that joint lines and profiles align instead of clashing. That coordination is far cheaper to settle at drawing stage than on site.

3. Send the drawings we actually need to fabricate

Once the build-up is chosen, the brief becomes a set of production documents. For each wall type send:

  • Elevations with the module grid and joint widths marked, including openings and internal and external corners.
  • A panel schedule listing every unique size, its quantity, its finish and its location tag tied back to the elevation.
  • The fixing detail or a sketch of the intended subframe, plus insulation, membrane or service runs behind the panels.
  • Access notes: floor height, lifting route, and whether panels must pass through doors or lifts. A panel that cannot reach the wall is a change order.

We work as a furniture and building materials manufacturer covering cladding, ceilings, cabinetry, joinery, outdoor furniture, ceramics, lighting and flooring in one order, so this stage is where the real saving appears. The same team checks that the cladding module, the ceiling line, the wardrobe and millwork reveal and the floor edge detail belong to one coordinated set of dimensions rather than three separate supplier drawings.

4. Sample, confirm, then release production

Our cooperation steps on a cladding package follow the same sequence we publish for every project: brief and design proposal, quotation with detail confirmation, then production, shipment and follow-up. For wall cladding specifically, that means:

  • A physical finish sample in the selected coating or stone face, viewed against the site's own lighting before sign-off.
  • A marked-up panel schedule for your countersignature, because production starts from that list and not from the concept elevation.
  • A pre-shipment inspection set: flatness, finish continuity, protective film and packing layout matched to the installation sequence.

Packing is planned around the install order, with panels tagged to elevation locations. On a villa or hotel job this is what allows crews to open one crate per wall instead of sorting a mixed stack on site.

5. Delivery, installation and after-sales in one chain

Cladding panels are bulky and finish-sensitive, so freight is part of the product decision. Our logistics and door-to-door delivery service covers sea, air and rail freight forwarding, customs paperwork, packaging and container loading planning, shipment tracking and delivery to site. On the same project we also provide installation and after-sales support, including on-site installation guidance, inspection and snag lists, spare panels and replacement parts for future maintenance.

For bespoke sizes, finishes and branding, our custom and OEM service covers prototyping, material and finish selection and project-specific dimensions, which is how a cladding run gets matched to non-standard floor heights and curved wall lines rather than forced into a stock module.

A short checklist for your next cladding enquiry

  • Interior or exterior, and which wall types each apply to.
  • Largest workable panel size and the module grid with joint widths.
  • Face build-up: coated, stone veneer or perforated, with a reference sample.
  • Fixing method, subframe responsibility, and what sits behind the panels.
  • Specifier's written performance requirements for that project.
  • Delivery address, access limits and installation sequence.

Send those six items with your elevations and we can come back with a build-up recommendation, a panel schedule to confirm and a quotation for the full package — cladding, coordinating ceilings and the joinery that meets it.

Panel sizes, core options, coating systems and performance claims are confirmed per project against your drawings and the requirements in your specification. Figures and certifications shown on our website vary between pages, so we verify them with you in writing before production rather than assuming a catalogue value applies to your building.

Send us your brief

Email santerson@qq.com or contact us on Phone / WhatsApp +86-13928214007 (PHILLIP). Include your elevations, panel schedule and wall locations, and we will reply with the cladding build-up options, sample route and a quotation for the coordinated package.