A single concealed door is an easy line item to price. It becomes difficult the moment it has to match wardrobes, wall panelling, skirting and a dozen other openings in the same building, all supplied by different vendors on different schedules. This guide walks through how buyers, contractors and project designers budget and scope Santerson Decorative Concealed Doors inside a multi-product order — what drives the cost, which decisions must be frozen before production starts, and how to group doors with the rest of the fit-out so that one purchase order covers everything.

Why concealed doors are budgeted differently from standard doors

A conventional pre-hung door can be quoted from a catalogue size: leaf, frame, architrave, hardware. A decorative concealed door is closer to a piece of joinery than to a commodity item. The leaf is finished so that it disappears into the surrounding wall — painted flush, or clad in the same material as the panelling beside it — and the hardware sits inside a rebate that only works if the wall build-up was designed around it.

Santerson's Flush / Concealed Doors range is made to measure for each opening. The product pages for Decorative Concealed Doors, Handleless Concealed Doors and Flush Wall Aligned Doors all state the same three configurable parameters: made-to-measure sizing, material and finish options, and a layout tailored to the project. Nothing in that structure supports a fixed unit price, so treat concealed doors as a specified item with its own approval cycle rather than a schedule line you can fill in later.

Budgeting rule of thumb: cost the concealed door as three separate things — the leaf and frame assembly, the concealed hardware set, and the wall preparation that receives it. If your door schedule only carries one number per opening, you are almost certainly missing two of them.

Step 1: Build a door schedule before you ask for a price

Requesting a quotation from a room list produces an unreliable number. A workable door schedule records, for every opening in the project:

  • Clear opening size and finished floor level — concealed doors are made to measure, so rough opening dimensions taken before screed and flooring are set will be wrong.
  • Wall build-up at the opening — stud depth, plasterboard layers and the finish that will sit on the face determine frame depth and whether a concealed hinge pocket is feasible.
  • Leaf finish — paint-ready, lacquered, wood veneer, or matched to adjacent panelling. Each finish changes both price and lead time.
  • Operation — hinged, sliding or pocket; single or double leaf; opening direction and which hand.
  • Hardware intent — concealed hinges, integrated door closer, magnetic lock, handleless push-open or a recessed pull. Handleless detailing must be decided at the design stage, not on site.

Grouping openings by identical specification is what makes a multi-product order easier to produce and easier to check. Six doors cut to one size and finish behave differently in production than six one-off sizes; state clearly which openings are repeats.

Step 2: Decide the door's role — decorative, handleless or wall-aligned

The three concealed variants solve different visual problems, and mixing them across a project is normal as long as each decision is recorded per room.

  • Decorative concealed door — used where the leaf carries or continues a decorative surface: veneer, lacquer or a panel line that must read as part of the wall. Specify it against the exact panel it sits in.
  • Handleless concealed door — for minimalist schemes where no ironmongery breaks the face. Requires an agreed opening mechanism and sufficient clearance for fingers or a push action.
  • Flush wall aligned door — for painted plasterboard walls where the goal is a clean, shadowless line with a minimal gap to the surrounding surface.
Santerson Decorative Concealed Doors, made to measure with project-specific finish options
Santerson Decorative Concealed Doors — part of the Flush / Concealed Doors collection; finish, layout and dimensions are specified per project.

Step 3: Scope the interface with panelling and built-in joinery

This is where a concealed door budget either holds or breaks. A concealed leaf only looks correct if the surfaces around it were planned together. Where the door sits inside clad walling, specify it alongside Integrated Door & Paneling and the relevant Wall Panel Systems, so that one workshop owns the leaf, the panels and the reveal between them. The same logic applies where doors abut built-in furniture such as wardrobes and vanities: matching veneer or lacquer across two suppliers is a colour-matching exercise you will pay for twice.

Practical checks to write into the scope:

  • Which party builds the wall that receives the frame — the door supplier, the drywall contractor or the joiner? Unassigned, nobody does it.
  • Where the architrave detail stops. Flush detailing usually means no architrave at all, which requires a protected wall edge and an agreed reveal width.
  • Whether floor thresholds, sliding tracks and pocket casings are included in the door price or fall to the flooring package.
  • Who supplies the finish sample sign-off: request a physical sample of the leaf finish before release for production, especially where veneers and lacquers must match adjacent joinery.

Step 4: Group doors with the rest of the fit-out to control cost

Concealed doors rarely stand alone in a project bill. They arrive as part of a package that also includes wardrobes, kitchen cabinetry, panelling, flooring and lighting. Ordering them as one consolidated purchase, rather than through separate subcontractors, removes three cost drivers at once: duplicated sampling and approvals, inconsistent finishes between trades, and the site variation orders that follow when dimensions from different suppliers do not agree.

Santerson supplies doors within a wider catalogue of windows and doors, furniture and building materials, and works with buyers on OEM furniture manufacturing where a project needs its own sizes, finishes or badging. For villa and hospitality schemes, Turnkey Interior Project Solutions cover the sequence from design coordination through production, shipping and installation, which means the door schedule is reviewed together with the joinery drawings instead of arriving after them.

Step 5: Where the money actually goes in a concealed-door budget

Cost line What moves the price How to control it
Leaf and frame, made to measure Number of unique sizes rather than total quantity; non-standard heights; double leaves Repeat standard sizes across rooms; fix finished floor levels before measuring
Finish Paint-ready is the least demanding; veneer and matched lacquer need sample approval and care on site Limit finishes to two or three per project; approve physical samples before release
Concealed hardware Hidden hinges and closers, integrated locks, handleless mechanisms — quoted separately from the leaf Specify one hardware family per project; confirm load rating against leaf weight and size
Wall preparation and installation Rebate detail, protective wall edges, pocket casings, sliding tracks, site access for a second visit Assign the interface in writing; confirm who installs and who makes good
Packing, freight and handling Distance to site, container mix with other joinery, protection of finished faces on long hauls Ship doors with the joinery package so one delivery covers both; check crate dimensions against site openings
Re-work and variation Late changes to opening size, finish or hand after production release Freeze the door schedule at drawing approval; keep one revision log for all openings

Prices depend on the specification you confirm, so a meaningful comparison between suppliers only becomes possible once every bidder is quoting the same build-up. Send the same schedule to each and ask them to state explicitly what is excluded.

Step 6: Sequencing and lead time

Concealed doors sit late in the making but early in the deciding. The order can only be released once finished floor levels, wall build-ups and the panelling detail are settled — but the frame depth and hardware pocket have to be known before those walls are built. That overlap is the reason door schedules get delayed: the door decision needs information from two trades that have not yet committed.

A workable sequence for a multi-product project:

  • Design stage — select variant and finish per room; agree reveal detail with the wall and panelling drawings.
  • Pre-production — confirm made-to-measure sizes against finished levels, sign off physical finish samples, lock hardware selection.
  • Production — doors are manufactured together with matching joinery so batch and finish are consistent.
  • Delivery and installation — book the door delivery after the wet trades and wall finishes have reached a clean, dry state; keep the schedule of openings on site for checking each leaf against its room.
Before releasing production, confirm in writing: opening sizes with finished floor levels, the selected finish sample reference, hardware model and load rating, opening hand and direction, and who prepares and closes up the wall.

A worked example of scoping two rooms

Consider a villa corridor where a study door must read as part of a veneer-clad wall, next to a store cupboard that only needs to sit flush with painted plasterboard. The study is specified as a decorative concealed door matched to the panelling, with concealed hinges and no visible architrave; the cupboard takes a flush wall aligned door in a paint-ready finish. Same supplier, same delivery, two very different scopes — and most of the difference in cost sits in the finish, the hardware and the reveal detail rather than in the size of the leaf.

Bidding them as one package with two clearly separated specifications lets the workshop batch the frames, keep one set of measurements, and deliver both leaves together with the wardrobes for the same bedrooms. Bidding them through separate suppliers means two sample rounds, two finish approvals, and a real risk of a mismatch on the study wall.

Common budgeting mistakes to avoid

  • Pricing concealed doors from a standard door rate. Made-to-measure detailing, concealed ironmongery and the wall interface are all additional.
  • Leaving handleless detailing to site. The opening mechanism and clearance have to be in the drawings before the wall is built.
  • Ordering doors separately from matching joinery. Two suppliers, two samples, two chances of a mismatch.
  • Measuring before screed and flooring are set. Made-to-measure sizing on a rough level guarantees re-work.
  • Not stating who installs. A concealed leaf delivered to site with no assigned installer becomes an unfunded variation.

Wrapping the schedule into one enquiry

Send one document containing the full door schedule, the wall build-up detail at each opening, the finish references you want matched, and the hardware intent. Ask for a quotation that separates leaf and frame, hardware, packing and freight, so you can see which line moves when you change a finish or add a size. If the project also needs wardrobes, cabinetry, panelling or flooring, include them in the same enquiry — coordinating the whole fit-out with a one-stop furniture and building materials supplier is what keeps one set of drawings, one approval trail and one delivery window.

To price concealed doors against your own drawings, send the door schedule, wall details and finish references to the SANTERSON project team. We confirm made-to-measure sizes, material and finish options for each opening before production, and coordinate doors with the rest of the joinery package from manufacture through delivery and installation.