Laundry is usually the last space a project team specifies and the first one where schedules start to slip. A washer and dryer bought off the shelf at a late stage rarely match the enclosure, the finishes or the services already drawn for the rest of the building. Our WasherDryer Cabinets are part of the Laundry Integration collection and are made to measure, so they can be specified once, together with every other built-in item, and stay consistent from the first drawing revision through to handover.

Why laundry joinery breaks away from the rest of the schedule

In most residential and mixed-use projects the materials schedule is organised by trade: cabinetry here, wall finishes there, sanitaryware somewhere else. Laundry storage falls between those lines. It gets listed as a loose item, priced late, and then matched to whatever enclosure happens to be available on site. Three problems follow:

  • Finishes drift. A cabinet ordered separately is matched by eye to the kitchen or wardrobe range, and small differences in veneer tone, handle style or edge detail become visible where the two meet.
  • Dimensions get locked too late. Made-to-measure casework needs a clear opening size, a floor level and a service route before it goes into production; if the appliance decision comes afterwards, the enclosure is rebuilt instead of built.
  • Responsibility splits. When the cabinet, the doors and the tall units come from different suppliers, site teams manage several tolerances and several defect lists for one small room.

Specifying laundry joinery inside the same schedule as the rest of the built-in furniture removes all three. The unit is drawn, quoted and produced against the same dimension set as the kitchen, wardrobes and Integrated Appliance Tall Cabinets, so it arrives with matching material, finish and hardware.

Where washer dryer cabinets sit in a whole-project materials schedule

A practical way to build the schedule is by zone rather than by trade. For each bathroom, laundry and service area, list the enclosure and the fixture together. That keeps the specification readable for procurement and avoids duplicate line items.

Zone Built-in items to schedule together What has to be confirmed before production
Dedicated laundry room Stacked Laundry Units, Laundry & Storage Combo, Pull Out Laundry Hampers Appliance footprint and door swing, access route to the room, worktop height
Bathroom or ensuite with a machine Compact Laundry Solutions, vanities, mirror cabinets Clear opening width and depth, water and drainage position, ventilation
Kitchen or utility run Multi Function Tall Cabinets, kitchen cabinets, pantry units Appliance dimensions, ventilation and electrical requirements, run alignment
Service corridor or plant area Utility Tall Cabinets, hampers, storage units Access for maintenance, door type and opening direction, load requirements

Grouping the lines this way means one supplier draws, quotes and produces everything that touches the laundry wall. For projects where the whole apartment or villa is being furnished at once, that single point of coordination is where the saving is made - not on the cabinet itself, but on the number of revisions it takes to get there.

What to fix before the cabinets go into production

Made-to-measure laundry joinery only works if a short list of inputs is frozen. Our product pages state that finish, layout and dimensions are specified per project, and that dimensions and selected specifications must be confirmed for each project - so treat the following as the sign-off checklist rather than as fixed figures:

  • Appliance selection. Model, external depth with hoses fitted, whether the door opens left or right, and whether the machine is vented or condenser. This determines the enclosure depth more than anything else.
  • Clear opening versus finished dimension. Record the structural opening and the finished floor level. A cabinet made to a structural drawing without the floor build-up will not sit correctly.
  • Services positions. Water inlet, drainage outlet, power point and any ventilation requirement, all dimensioned from a fixed wall face rather than from another fixture.
  • Worktop and load path. If the cabinet carries a counter or a sink above the machine, say so at quotation stage; the carcass and support are detailed differently.
  • Finish reference. Name the material and finish explicitly - veneer, lacquer, melamine or acrylic - and match it to the line item used for the kitchen and wardrobes so the whole joinery package reads consistently.

Keeping finishes consistent across the building

The most visible failure in a laundry is not the cabinet door but the joint where it meets adjacent joinery. When the same material and finish code run through the kitchen, wardrobes and laundry enclosure, those joints disappear. Where we manufacture both, that continuity is straightforward: the Custom Built-in Kitchen Cabinets range and the Laundry Integration collection can be specified to the same finish family, and doors can be detailed to align with Decorative Concealed Doors and wall panelling in the same corridor.

For multi-unit work this matters more than it looks on a rendering. Repeat a mismatched laundry enclosure across twenty apartments and every buyer will find it. Repeat a flush, matching one and nobody talks about the laundry at all - which is exactly the outcome you want from a service space.

Ordering laundry joinery inside a turnkey package

If the project already uses one supplier for furniture and interior fixtures, add the laundry line at the same time as the rest of the built-in furniture, not after. As a one-stop furniture and building materials supplier, SANTERSON handles design consultation and space planning, material selection and product specification, manufacturing and quality control, project management and site coordination, then final installation and handover - with custom and OEM work available where a project needs a non-standard layout or a specific finish.

For procurement that means one quotation covering the cabinets, one production window, and one packing list and container for the joinery package rather than three separate consignments. Logistics is arranged as door-to-door delivery with freight forwarding by sea, air or rail and the associated customs documentation; import terms, duties and transit times should be confirmed for each destination before the order is placed.

A five-step sequence that works on site

  1. Freeze appliance models and services positions for every laundry and bathroom location, unit by unit.
  2. Issue the enclosure schedule with clear openings, finished floor levels and worktop heights.
  3. Specify finish codes from the same family used across kitchen, wardrobe and door lines.
  4. Confirm dimensions and selected specifications per unit before production release, and record who signed them off.
  5. Inspect on delivery against that confirmed list, then close out snags with the same team that installed the rest of the joinery.

Laundry equipment is a small share of most project budgets, which is precisely why it gets left to the end. Put the washer dryer cabinets in the materials schedule at the same time as the kitchen and wardrobes, hold one supplier accountable for the whole joinery package, and the room stops being a source of variation.

Send us your enclosure dimensions, appliance selection and finish references for each unit, and we will quote the Laundry Integration items alongside the rest of the built-in furniture as one package. Contact details are on our contact page.