A cabinet quotation is only as good as the brief behind it. Two projects can ask for the same white door panel and end up with completely different kitchens, because finish system, substrate, case dimensions, hardware schedule and delivery method were never written down. The checklist below is what we ask buyers, builders and designers to send when they are specifying white matte cabinets for a house, villa or apartment project, and it is the same information our production team needs before we can quote accurately.

Start With the Job, Not the Colour Swatch

Before any finish discussion, tell us what kind of job this is. A single villa renovation, a repeat-unit residential development and a show-home fit-out are handled differently in terms of sampling, packing, spare parts and documentation. State the project location, the internal handover date you are working to, and whether the site is occupied or vacant. Occupied sites change delivery windows and packaging requirements more than most buyers expect.

Then confirm who signs off on appearance. Cabinet colour always looks different under site lighting than in a sample box, so we need one named approver for the finish sample and one for the shop drawings. When those two roles sit with different people, approval rounds multiply.

Describe the White You Actually Want

"White" is not a specification. In our Matte Finish Kitchen Cabinets collection, white doors are made to order, and the appearance depends on three separate decisions:

  • Undertone. Warm whites sit with timber and stone; cool whites sit with glass, steel and pale engineered flooring. Send a reference photo or a paint code from your own palette if you have one, and tell us which surfaces it has to sit next to.
  • Sheen level. Matte ranges from a flat, chalk-like surface to a low-satin finish that reflects a soft glow. Tell us the sheen you expect and we will match the door to it; do not assume two "matte whites" from different collections will match each other.
  • Texture. Some matte surfaces read as smooth, others carry a fine grain or soft-touch feel. Fingerprints and cleaning method follow from this choice, so decide it before sign-off rather than at handover.

If your design also uses matching wardrobes or tall pantry panels in the same white, say so in the first message. Panel-to-panel colour matching across collections is a production decision, not something to fix on site.

Send the Layout and the Case Dimensions

Our cabinets are made to measure, so we can work from a plan, but the plan has to carry the right information. A usable brief includes:

  • A dimensioned kitchen layout, in millimetres, showing room lengths, wall angles and the position of windows, doors and any bulkheads.
  • Finished floor level and floor-to-ceiling heights, plus where service runs sit — water supply, waste, gas, exhaust ducting and electrical outlets.
  • Appliance schedule with make and model for built-in ovens, cooktops, dishwashers, fridges and rangehoods, including whether they are integrated or freestanding.
  • Countertop material and thickness, because the worktop sets the door height and the splashback detail.
  • Sink and tap cutout positions, and whether the tap is deck-mounted or wall-mounted.

If you do not have a set of cabinet drawings yet, send the room plan and your appliance list. Our team can work through layout planning with you and produce drawings for your confirmation before production starts. What does not work is sending a rendered mood board and asking for a price.

Specify the Interior, Not Just the Front

Cost differences usually sit inside the carcase. Tell us what goes in each run of cabinets:

Item to specifyWhy it changes the quote
Door style and opening typeFlat slab, shaker or handleless profile; hinged, sliding or lift-up. Handleless runs need a different front detail and clearance than door-on-hinge runs.
Drawer versus door-and-shelfDrawers cost more per metre but make deep base cabinets usable. Mark which runs you want as drawers.
Hardware and soft-closeHinges, runners and soft-close fittings are quoted as a schedule. Tell us the brand or grade you expect and where heavy doors sit.
Corner solutionsLazy Susan, pull-out carousel or plain shelf — each needs different case dimensions decided before the carcase is cut.
Tall and pantry unitsFull-height units need floor-to-ceiling heights, an appliance plan and a decision on integrated versus exposed panels.
Internal finishCarcase colour, edge banding and shelf depths should be listed so the inside of the cabinet matches your expectation.
Integrated lightingIf you want lit cabinets or open shelves, we need that at drawing stage to reserve wiring routes and transformer access.

Set the Sampling and Approval Route Early

For a matte white front we recommend approving a physical door sample before full production, especially on multi-unit work. In the brief, state how many samples you need, where they go, and who returns them. Then agree in writing what counts as approval: the signed sample, the approved drawing set, or both. That single line saves more rework than any other part of the specification.

Write Down How the Cabinets Reach the Site

Cabinets travel as flat packs or as assembled boxes, and that choice affects site labour. Include in your brief:

  • Delivery address and access. Floor level, lift dimensions, stair width, parking restrictions and whether a crane or hoist is available.
  • Incoterms and who clears customs. State the delivery term you want quoted, and name the party handling import clearance and duties.
  • Packing standard. Multi-drop developments need labelled, unit-by-unit packing so crates go to the right apartment.
  • Storage on site. A vacant, dry, lockable space changes how we pack and sequence the shipment.

We arrange freight by sea, air or rail with the customs paperwork, and our logistics coordinators track the shipment to the door. Transit time, duties and insurance are quoted per project once you give us the delivery address, so treat any figure from an earlier job as a rough guide only.

Say Who Installs and What Happens After

Tell us whether your own joiner erects the cabinets or whether you want installation support, because that changes the packing standard, the labelling and the level of pre-drilling we do in the factory. Either way, put the snag process in the brief: who inspects on handover, how defects are reported with photos and unit numbers, and what spares you want held locally — replacement doors, shelf pins, hinges and runners are far cheaper to ship inside the original container than one hinge at a time.

A Copy-Paste Brief Template

Send this as an email and we can come back with a meaningful quotation rather than a question list:

  • Project name, city, and whether it is a private home, development or display home.
  • Target handover date and any site access constraints.
  • Kitchen layout in millimetres plus appliance schedule.
  • Door style, undertone and sheen for the white, with reference images.
  • Hardware preference and which runs are drawers.
  • Countertop material and thickness.
  • Matching wardrobes or tall panels in the same finish — yes or no.
  • Sample requirement: number of door samples and who approves them.
  • Delivery address, delivery term wanted, and who clears customs.
  • Installer: own trade or installation support required.

If you are comparing several suppliers, send the identical brief to each. Quotations only line up when the case dimensions, hardware schedule and delivery term are the same on every sheet — otherwise you are comparing different kitchens at different prices.

Common Questions

Can I order a single kitchen, or is there a minimum?

We handle both single-home fit-outs and multi-unit work, and order quantities are discussed per project. Tell us the unit count and we will confirm what is practical.

Do you make other whites in the same matte range?

Yes. The matte collection covers handleless fronts, grey, black, wood-tone and two-tone combinations, so a warm-white island with a darker perimeter run can be specified from one family of doors: handleless matte cabinets, grey matte cabinets and two tone matte cabinets.

I have no drawings, only a floor plan. Is that enough?

It is enough to start. Send the plan with dimensions and your appliance list, and we will work through layout and material selection with you before drawings go to production.

Can cabinets be matched to other joinery in the same project?

Yes, when it is specified up front. Wardrobes, media walls, vanities and doors can be ordered with a shared finish so the whole apartment reads as one scheme; that decision has to be made at drawing stage.

Send the Brief, Get a Comparable Quote

A precise brief costs you an hour and protects the budget for the rest of the job. Once we have the layout, the finish decision, the hardware schedule and the delivery term, the quotation we return is one you can put side by side with any other supplier's.