A parquet floor quotation is easy to compare on price per square metre and hard to compare on what actually arrives on site. This guide walks through the line items a manufacturer’s proposal for our European Oak Parquet Engineered Hardwood Flooring should contain, what each one means for installation and long-term performance, and which gaps you should ask us to close before you sign.
Start With the Product Record, Not the Price Line
Model 1848 is one entry in our engineered wood flooring range, and each entry carries its own build-up. Before looking at numbers, confirm the proposal names the exact product page or model code you approved, plus a current photograph taken from that page. Two parquet patterns can look close on a sample board and behave differently once laid across a large floor area.
For this item the published description states a solid oak top layer over a stable multi-layer substrate, a classic parquet pattern, and compatibility with underfloor heating. Treat those as the specification to be repeated in your proposal, in the same wording, so that what you sign for matches what is packed. Product pages in this range describe the top layer differently from one another, so ask for the exact figure for model 1848 in writing rather than assuming it.
The Line Items a Complete Proposal Must Carry
| Item | What to look for | Why it matters on site |
|---|---|---|
| Model and finish | Product code, surface treatment and grade as published on the product page | Fixes colour and grain character across later reorders |
| Wear-layer thickness | The stated solid oak top layer for this model, as a figure in writing | Sets how the floor responds to traffic and future refurbishment |
| Board format and pattern | Plank or block size, parquet layout, edge profile | Determines setting-out drawings, cutting loss and labour time |
| Quantity and packaging | Square metres per pack, total packs, pallet count, carton marks | Drives container loading and storage space at the site |
| Underfloor heating note | Whether the model is listed as compatible, and any install conditions attached to that | Heating affects acclimatisation and adhesive choice |
| Substrate and site conditions | Required subfloor type, flatness and moisture limits stated by the manufacturer | Site preparation is usually the buyer’s scope, so it must be written down |
| Fixing method | Adhesive, floating or mechanical fixing as recommended for this format | Wrong fixing voids support and causes noise or movement |
| Accessories quoted together | Transition profiles, end trims, adhesive, primer, maintenance oil or lacquer touch-up kit | A missing trim stops handover even when the floor itself has arrived |
| Spare allowance | Recommended percentage of extra material for cutting and future repair | Later batches can vary in tone, so spares bought with the order match better |
| Delivery terms | Incoterms, packing list detail, container loading plan, delivery address | Tells you where your responsibility for the goods begins |
| Inspection and after-sales | How pre-shipment inspection is done, what is covered, how claims are raised | Sets the practical route if a pallet arrives damaged or off-tone |
If any row above is blank, the proposal is incomplete rather than cheap. Ask for it in writing; a verbal answer during a call does not protect you at handover.
Reading the Specification Honestly
Wear layer and construction
A multi-layer substrate is what makes a parquet floor dimensionally calmer than a solid board in changing humidity, which is why engineered parquet is specified for renovation work and heated floors. Confirm the proposal repeats the top-layer thickness stated for the model you chose rather than a generic range figure, and check that the construction description matches the product page.
Pattern and setting-out
Parquet lives or dies on its layout. Ask for a setting-out drawing showing where the pattern starts, how borders are handled at doorways, and which direction the blocks run relative to the main light source. A proposal that includes this drawing tells you the manufacturer has thought about your floor plan, not just your order quantity.
Colour and tone range
European oak is a natural material with variation between boards and between production batches. Request the approved sample reference in the proposal, keep the physical sample until handover, and ask how batch consistency is handled across split deliveries, since tone can shift from one consignment to the next.
Underfloor heating
This model is described as compatible with underfloor heating. In the proposal, that compatibility should come with practical conditions: subfloor moisture checked before laying, heating switched off and the floor acclimatised during installation, and a gradual warm-up afterwards. Compatibility without those conditions is not a usable specification.
Comparing Proposals From Different Suppliers
Once two or three quotations carry the same line items, comparison becomes straightforward. Normalise everything to delivered cost per square metre for the same model, including packs, trims, adhesive and the spare allowance; a low board price that excludes profiles and fixing materials usually lands higher at handover. Then compare what each supplier commits to in writing: named product code, stated build-up, setting-out drawing, packing detail, inspection method and the claim route.
Watch for substitutions described as “equivalent”. An equivalent parquet may match on appearance while differing in wear-layer thickness or board format, which changes both durability and installation time. If a change is proposed, ask for it against the original product page so you can see exactly what moves.
How We Handle This Product From Enquiry to Handover
SANTERSON has manufactured furniture and building materials since 2008, and flooring is supplied as part of a wider fit-out package rather than as an isolated item. That matters on real projects, because the floor has to agree with the joinery, doors, skirting and lighting already specified for the same room.
- Specification review. We confirm the model, format and finish against your drawings and return a written proposal covering the line items listed above.
- Samples and colour approval. Physical samples are issued for sign-off before production, so the approved reference governs the whole order.
- Custom & OEM service. Where a project needs a bespoke format, finish or branded packaging, we quote it at enquiry stage instead of as a variation later.
- One-stop supply. Flooring can be consolidated with cabinetry, wall panels, ceilings, lighting and furniture in one shipment, which reduces the number of deliveries you manage on site.
- Logistics and documentation. Packing lists, pallet marks and loading plans are issued before dispatch so your receiving team knows what is in each container.
- Installation support and after-sales. Fixing recommendations are given for the quoted format, and any claim is handled through a documented route with photographs and batch references.
Projects we have supplied include villa interiors in Sydney, Melbourne, Willoughby, North Turramurra and Perth. Scope details for each case are on the published project pages, so check the case page for the room list and finishes actually delivered rather than assuming a floor specification.
Questions Worth Sending Before You Accept
- Which exact product page does this price cover, and can you attach the current photo and description?
- What wear-layer thickness and board format are included for that model?
- Can you provide a setting-out drawing for our floor plan?
- What subfloor flatness and moisture limits must our site meet before laying?
- Which adhesive and fixing method do you recommend for this parquet with underfloor heating?
- How many square metres per pack, how many packs, and what spare allowance do you advise?
- Which trims, profiles and maintenance products should be ordered with the floor?
- How is batch consistency handled if the order ships in more than one consignment?
- What pre-shipment inspection report will we receive, and how are claims raised after arrival?
Send us the drawings, room list and target programme, and we will return a proposal that answers each of these points in writing, with the model, format and accessories named so you can compare it line by line against any other quotation.
Request a written proposal for European Oak Parquet Engineered Hardwood Flooring (1848)
Contact PHILLIP, SANTERSON — Phone / WhatsApp +86-13928214007 · Email santerson@qq.com · Factory and office: Longjiang, Shunde, Foshan, China. The contact page states enquiries receive a response within 24 hours.