A quotation for an outdoor swim spa rarely arrives as a single number. It arrives as a package: a shell size, a jet count, a pump list, a power figure and a set of options you are expected to accept or reject. The difference between a fair proposal and an awkward installation later usually comes down to whether the paperwork describes the same machine you intend to install. This guide walks through that check using the Outdoor Swim Spa WS-115AⅢ as a working example, so you can read any manufacturer’s proposal with the same questions.
Start With the Footprint, Not the Price
The catalog entry for this model lists overall dimensions of 3880 × 2200 × 1250 mm. Treat those three numbers as the starting constraint for every part of the discussion. A spa that measures roughly 3.9 m by 2.2 m externally needs more than a deck cut-out: you need working clearance for the control system, room for the filter pump access, a route for delivery, and space for anyone stepping in or out.
Ask the manufacturer to state which dimensions are external, which are internal water depth, and where the equipment compartment sits. If the proposal answers only “3880 × 2200 × 1250 mm” without that breakdown, request it in writing before you compare prices between suppliers. Two proposals with identical external figures can still differ in internal volume once shell thickness and seat geometry are taken into account.
Read the Equipment List Line by Line
The published specification for this model records one control system, one swim training system, one water pump, one filter pump, a jet total of 24 pieces and four LED lights. Those line items are the part of a proposal you should never skim, because they are where substitutions quietly happen.
- Jet count versus jet layout. A total of 24 jets says nothing about where they sit or which seats they serve. Ask for a jet map with seat positions marked.
- Pump quantities. One water pump and one filter pump is a specific arrangement. If a quotation lists different quantities, ask whether the hydraulic design changed or the specification was altered to hit a price.
- Swim training system. This model is listed with a swim training system as standard equipment. Confirm the make, the flow rate it produces and how it is controlled, because this single item drives much of the running behaviour of a swim spa.
- Lighting and sanitation. Four LED lights and ozone treatment appear in the catalog features. Where a proposal replaces ozone with UV sterilization, or changes the light count, ask for the revised list rather than accepting a generic “as standard” line.
Check the Power Figure Against Your Supply
Total power for this configuration is listed as 8.05 kW. That number should be matched against what your site can actually deliver, and against how the manufacturer proposes to wire it: single-phase or three-phase, dedicated circuit, breaker rating, cable run length and the location of the isolator. A proposal that quotes the spa at 8.05 kW but says nothing about supply requirements has not finished its job.
Power also tells you something about configuration differences. The closely related Outdoor Swim Spa WS-115AⅢ-U shares the same 3880 × 2200 × 1250 mm footprint but is listed with four water pumps, a jet total of 23 pieces, one LED light and a total power figure of 11.85 kW. Same shell, different machine. If two quotations from the same supplier look identical on size alone, this is exactly the comparison to demand.
Separate Standard Equipment From Options
Catalog-listed extras for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Each of those belongs in one of two columns on your evaluation sheet: included in the quoted price, or priced separately. Heat pumps and insulation deserve particular attention if the spa will sit outdoors through cold months, because they change both the purchase cost and the running cost, and a supplier who bundles them vaguely into “full package” makes that comparison impossible.
A clean proposal lists options with individual prices and states which are fitted at the factory versus supplied loose for site installation. Steps, in particular, are often quoted as loose items even though they affect deck layout.
Confirm the Configuration Before You Compare Prices
Because this range is configurable, two proposals can both be titled WS-115AⅢ and still describe different equipment. Before comparing numbers, put every quotation into one table with identical rows: external dimensions, internal depth, jet total, jet positions, pump quantities, swim system type, lighting count, sanitation method, insulation, heating method, total power and electrical requirement. Any supplier who will not fill in that table is asking you to buy on trust.
The same discipline applies across the wider range. In the Swimming Pools and Swim Spas collection, models run from compact single-zone units to long swim spas with separate relaxation areas, and each entry carries its own dimension and equipment list. Where a spa must fit an existing terrace or be shaped around a view, the Customizable Shape Outdoor Spa shows how square, round, oval and curved shells are specified for particular spaces — useful as a reference point when a manufacturer tells you a standard shape will not work on your site.
Questions Worth Asking in Writing
- Which items on the catalog specification are fitted as standard for this quotation, and which have been removed?
- What is the total power figure for the quoted configuration, and what electrical supply does it require?
- Who handles delivery to site, crane or forklift access, and the base preparation?
- What is covered if a pump, jet or control component fails in the first period of use, and who supplies the replacement part?
- Which water treatment items need regular replacement, and where do those parts come from?
None of these questions are hostile. A manufacturer who has done this work before will answer them quickly, because the answers are already prepared. The quality of that response is itself a useful signal.
What a Complete Proposal Looks Like
For an outdoor swim spa such as the WS-115AⅢ, a proposal you can actually evaluate contains the dimension breakdown, a jet map, an itemised equipment list matched to the catalog specification, a stated power figure with electrical requirements, clearly separated options with prices, and delivery plus installation terms. SANTERSON operates as a China-based manufacturer and one-stop supplier covering furniture and building materials for villa, hospitality and office projects, with services spanning design consultation, custom and OEM production, door-to-door logistics and after-sales support — so the same expectation of itemised documentation applies when spa equipment is bundled into a wider project package.
Compare proposals on that structure rather than on headline price. The quotations that look more expensive at first often carry the fuller specification, and the fuller specification is what prevents a change order after the spa has already shipped.
To discuss a swim spa specification for your project, or to request an itemised proposal for this model, contact SANTERSON: santerson@qq.com, phone/WhatsApp +86-13928214007 (PHILLIP).