A floor-to-ceiling bookshelf is one of the easiest built-in items to get wrong, and one of the most expensive to fix after it has been shipped. Most quotation delays on our side do not come from pricing arguments — they come from missing information. If you are preparing a request for quote (RFQ) for Santerson Floor to Ceiling Bookshelves, the items below are what we need in order to return a workable price, a realistic production slot and a shipping plan that holds.

Start with the wall, not the shelf

Our bookshelves are made-to-measure: finish, layout and dimensions are specified per project rather than chosen from a fixed size grid. That means the quotation follows the opening, not the other way around. Before you write a single line of the RFQ, take these measurements and note them on a simple sketch of the wall:

  • Total run length along the wall, and the height from finished floor level to finished ceiling level — not to the structural slab.
  • Whether the ceiling is level. On older villas and renovation sites the ceiling can drop across the run; tell us the high point, the low point and where they occur.
  • Skirting boards, architraves, cornices or recessed coves that must be cut around, removed or scribed to.
  • Obstacles: switch plates, sockets, air diffusers, sprinkler heads, downlights, radiators, pipework, and any structural column or beam set into the wall.
  • Whether the wall itself can carry the unit. Plasterboard, brick, concrete and timber stud walls are fixed differently, and we need to know which one you have.

Attach the sketch. A hand drawing with dimensions written on it is more useful than a clean-looking specification with no numbers, because it shows us where the runs break and where the scribing happens.

State the layout you actually want

Floor-to-ceiling is the vertical profile; the internal layout is a separate decision. Tell us, bay by bay, what each section should do:

  • Open shelving throughout, or a mix of open shelves with closed cabinets at the base or in upper bays — if you are weighing that up, our Santerson Closed Bookshelves range is the reference point for doors, carcasses and internal fittings.
  • Shelf spacing. Books, display objects, records and storage boxes need different depths and heights; give us the tallest item you intend to shelve so we set the vertical module around it.
  • Adjustable versus fixed shelves. Adjustable pins need row spacing decided at design stage.
  • Integrated lighting in niches or along shelf fronts, and where the transformer and access point should sit.
  • Doors: hinged, sliding or glass-fronted, plus the handle style or a handleless groove.

If your designer has issued elevations, send them. If nobody has, say so plainly — we work from project briefs and can go through layout planning with you before pricing rather than quoting an assumption.

Specify materials and finishes as a question, not a guess

Material and finish options are part of the configuration. You do not need to know every board code; you do need to give us enough to price the right grade. In your RFQ, list:

ItemWhat to write
Board / coreYour preference and the intended use — residential library, office, hotel lounge or villa living room. If you have no preference, ask us to recommend against the use.
Surface finishWood veneer, lacquer, laminate, melamine or paint; matte, satin or high gloss; and the colour reference (RAL number, sample photo, or a physical sample you can post).
Edge treatmentMatching edge banding, solid timber edge, or a shadow gap. Visible ends and returns need to be called out.
HardwareHinge and slide brand preference, soft-close requirement, load rating for deep shelves.
Fire or performance requirementsAny board or finish performance the project specifies. State the requirement — do not assume we will offer it unless you ask.

Where a finish has to match something already on site — an existing wardrobe run, kitchen cabinetry, a door set — say which item it must match and send its reference. Matching to a photograph is approximate; matching to a sample or a stated board code is reliable.

Quantity, sites and phasing

Give us the count of units and the count of locations. One bookshelf wall in one Sydney villa and eleven bays across four apartments price differently, because packing, container loading and site sequencing change with both. If your project is phased, mark which units are needed first. Where the same design repeats across rooms, say so — repeating modules are cheaper to produce and easier to check on site.

Delivery, access and installation

Our scope runs from design and production through door-to-door delivery, with installation and after-sales support available. That makes site information part of the price, not an afterthought. Include in the RFQ:

  • Destination country and city, and whether delivery is to the site or to a port or depot.
  • Incoterms you want quoted — FOB, CIF or door-to-door — so we are comparing the same basis.
  • Access conditions: lift dimensions, stair width, parking distance from the entrance, and any restriction on delivery times in the building.
  • Whether you need us on site to install and inspect, or a local contractor will fit the units from our drawings.
  • Who signs off measurements. On new builds, floor-to-ceiling heights move between the rough-in and handover; state when we may re-measure.
A practical rule: if your RFQ does not name the destination, the Incoterms and who is measuring, any price you receive from any supplier is provisional. Ask for a firm figure against stated conditions, and ask what would change it.

What to expect back, and in what order

For a made-to-measure item we reply with an itemised quotation — carcass, shelves, doors, finishes, hardware, packing and freight shown separately rather than as one lump sum — together with the drawing or elevation we priced against. Please read that drawing before you approve production; it is where shelf heights, bay widths and the direction of door openings get confirmed. Our cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up. Approval after production starts is where cost and delay appear.

Common gaps we see in RFQs for built-in shelving

  • A height quoted to the structural ceiling when a 60 mm cornice or a suspended ceiling sits below it.
  • Depth specified without saying what will be stored, so shelves end up too shallow for the books already owned.
  • No mention of skirting boards, which then have to be removed and made good on site.
  • One price requested for four countries with no Incoterms, making the comparison meaningless.
  • Lighting left out of the RFQ and added after production, when cable routes and transformer access were never planned.

Frequently asked questions

Can you quote from a photograph alone?

We can give an indicative figure, but not a firm one. A photograph shows proportions, not dimensions, board grade or fixing conditions. Send the sketch with measurements and we will price properly.

Do I need drawings from my designer before contacting you?

No. If drawings exist, send them. If they do not, tell us the wall dimensions and how the shelf will be used, and we will work through layout planning with you first.

Can the finish match my existing cabinetry?

Send the board code or a physical sample of what is already installed. A colour name alone is not enough to guarantee a match across different board types and sheen levels.

What if my ceiling is not level?

Tell us in the RFQ and give the range of heights. We design the top scribe or cove detail around that variation instead of cutting it on site.

Send your enquiry

SANTERSON has manufactured furniture and building materials since 2008, supplying residential, villa and hospitality projects with custom and OEM production, freight and door-to-door delivery. If you want a quotation for floor-to-ceiling shelving on a current project, send the wall dimensions, your layout notes, the finish reference and the destination — we will come back with an itemised price and the drawing we priced against. Contact details are on our contact page, and the wider shelving range is listed under products.