A kitchen package of Solid Color Acrylic Cabinets looks straightforward on a rendering: flat panels, one clean colour, no mouldings to argue over. The part buyers underestimate is everything that happens after the drawing is approved. Cabinets are made to measure, they cannot be re-cut on site, and the panels most likely to show damage in transit are exactly the ones you see every day. Below is the sequence we use on villa and apartment orders so that a container of coloured acrylic fronts arrives ready to install rather than ready for a claim.
Before production: what has to be frozen
Cabinetry is ordered against dimensions, not catalogue sizes. Our kitchen cabinets and interior fixtures are made to measure, with the layout, material and finish confirmed per project, so the first thing we need from your side is a set of as-built or site-verified measurements. Wall lengths, floor level variation, ceiling height, the position of the flue, water outlets and any appliance you intend to keep all change carcass sizes.
Three decisions should be closed before panels are cut:
- Colour reference. A solid colour name is not enough across batches. Send the RAL or Pantone code, or a physical sample you have signed off, and state which surface you mean: within this collection high gloss and matte fronts are specified separately, and the same colour reads differently on each.
- Panel construction and edge detail. Front thickness, edge banding or lacquered edge, handle or handleless groove, and whether appliance doors are hinged left or right. These are production inputs, not site decisions.
- The interface drawing. Where the run meets tiling, stone worktop, skirting, flooring and ceiling. If a scribe or filler panel is expected, note it now; if the tile finish is not yet fixed, tell us the tolerance you want allowed.
We also ask which rooms are in scope. A single order that carries the kitchen fronts together with white acrylic wardrobes or a laundry run can travel as one shipment and be installed by one crew, which is usually cheaper than splitting the joinery across two containers.
Production and pre-shipment checks
Once the specification is signed, the order goes into manufacturing with a quality-control stage before anything is packed. For coloured fronts we check colour consistency across the whole set under even light, because a single off-tone door in an otherwise uniform run of flat panels is visible from across the room. We also check edge adhesion and surface condition, and confirm that every carcass matches the approved layout drawing.
Two practical points matter at this stage:
- Sample retention. We keep a front sample from the batch. If a future phase or a second building needs a colour match, that sample is worth more than any code on paper.
- Spare fronts. For a multi-unit apartment job we recommend ordering one or two spare doors per colour. A front damaged after handover can then be swapped from stock instead of restarting a production run months later.
Packing: the part that decides whether the delivery succeeds
Acrylic-coated fronts are hard-wearing in use but vulnerable at the corners and to abrasion during handling. Our packing approach for cabinet shipments:
- Fronts packed flat, separated by protective interleaf, with corner protection on every panel.
- Carcasses knocked down and boxed, so nothing arrives as a bulky assembled unit that takes up cube and risks its own structure.
- Heavy hardware, hinges, runners and handles packed separately from panels, so fixings cannot work through carton walls.
- Each carton labelled with room, run and elevation number matching the drawing, plus a packing list that mirrors those numbers.
- Fragile glass or lacquered items on top of the stack plan, never under carcass cartons.
The labels sound like a small detail. They are the reason an installation crew can start on day one instead of opening a stack of identical boxes to work out what is where.
Choosing the freight route
Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, together with the paperwork side: commercial invoices, packing lists, certificates of origin and import permits. The route choice for cabinetry usually turns on timing and volume rather than cost per cubic metre.
| Route | Where it fits a cabinet order |
|---|---|
| Sea, full container | The default for a whole-apartment joinery package or a multi-villa order. Best cost per cubic metre, and the least handling of individual cartons. |
| Sea, part load | Works when the order is one kitchen plus wardrobes. Expect more handling at consolidation, so packing specification matters more, not less. |
| Air | Reserved for replacements, spare fronts or hardware that must catch a site programme. Panels are heavy for the volume, so air is rarely the right answer for the main order. |
| Rail | An option on corridors where scheduled services suit your window; useful when sea sailings are unreliable and air pricing is not justified. |
We handle customs documentation with the shipment and provide tracking, and cargo insurance can be arranged. Import duty, clearance charges and inland delivery on your side are quoted case by case against the agreed Incoterms, so confirm those terms in writing before production starts rather than after the container is booked.
Timing the arrival against site readiness
The most common avoidable problem is not damage, it is a container that arrives at a site that cannot receive it. Cabinets need a dry, lockable storage area and a first-fix that is complete: services in position, levels set, tiling and flooring resolved, and the trade sequence arranged so the joinery crew is not fighting painters for the same room.
On delivery day we ask your team to check cartons for damage before unloading, photograph any compromised cartons with their labels visible, and open those cartons on the spot. A clean signed receipt followed by a claim three weeks later is very hard to substantiate against the carrier.
Receiving, storage and installation
- Store cartons flat and indoors, off the floor, and keep them closed until the panel is needed. Open fronts sitting on an open site collect grit that scratches gloss surfaces.
- Check levels before fixing carcasses. Made-to-measure panels leave little room to absorb a wall that is out of plumb; scribe to the wall instead of forcing the run.
- Fit fronts last, and keep protective film on gloss surfaces until the room is otherwise finished.
- Clean with a soft damp cloth. Abrasive pads and strong cleaners are the usual way a coloured front loses its appearance, so follow the care instruction supplied with your selected finish.
Our installation and after-sales support covers on-site fitting, inspection with a snag list, spare parts and ongoing maintenance. Where local labour is doing the fitting, we can send installation drawings and guidance for the crew, and follow up against the snag list after handover.
Ordering as part of a wider package
If the kitchen is one line in a longer schedule, combining it with other joinery and finishes under one supplier removes a lot of interface risk. Through our one-stop supply service a project can carry cabinetry together with engineered flooring, wall panels and cladding, ceiling finishes, lighting, sanitaryware and outdoor furniture, coordinated through design consultation, specification, production, project management and handover. Where a design needs something outside the standard catalogue, our custom and OEM service covers bespoke design and prototyping, material and finish selection, and branding such as engraved hardware or packaging.
For a first enquiry on a cabinet order, send the room drawings or measurements, your colour reference, the appliance list, the target site date and the delivery address. From that we can quote the joinery, propose the packing plan and give you a shipping option with realistic timing.
Solid colour fronts are unforgiving of both colour drift and careless handling, which is precisely why the specification and the packing plan should be agreed in the same conversation. Send us your drawings and target date, and we will confirm sizes, finish, packing and the route that fits your programme.