A quotation for Santerson Wood Veneer Pocket Doors usually arrives as a short table: opening sizes, a leaf count, a veneer name and a unit price. Two suppliers can send very different numbers for the same drawings, and the difference is rarely visible on the first read. Before you sign a purchase order, work through the proposal line by line against your own room set-out, so that what you approve in writing is what reaches site.
1. Confirm the opening before you compare prices
Pocket doors are built around a wall cavity, so the proposal must describe the whole assembly, not just a leaf. Santerson lists these doors as made-to-measure for residential projects, with finish, layout and dimensions specified per space, which means nothing in the quotation is fixed until your openings have been measured. Check that every dimension quoted is tied to a numbered opening on your drawings, and that the sheet height, leaf width and wall build-up are stated rather than assumed.
Ask specifically how each opening was taken: finished floor level or structural slab, and whether the quoted height includes the frame and the track. Where a room has skirting, cornice or a tiled bathroom wall, say so in writing, because those details change both the leaf size and the pocket depth.
2. Read the veneer and finish description carefully
The phrase “wood veneer” covers a wide range of species, cuts and surface treatments. A sound proposal names the species, states whether the cut is crown or quarter, and identifies the protective finish. If it only says “oak, natural”, request a written clarification and a physical sample before you treat two quotations as comparable.
Grain direction and matching matter more on sliding leaves than on hinged ones, because adjacent leaves sit in one sightline. Ask whether the leaves for a single opening are selected from consecutive sheets, and how veneer panels for adjoining wood veneer panelling will be matched to the doors if both appear on the same wall.
3. Check the hardware schedule and what is excluded
Track, hanger, floor guide, stop, threshold and handles are often quoted as a separate line or quietly left out. Ask for each item to be listed with a make or specification, and confirm load rating against the leaf size in the proposal. Where the quotation is silent on ironmongery, treat it as excluded until the supplier confirms otherwise, then have the revised scope reissued.
Also check what is said about the pocket frame and the access panel for the track. If the proposal does not mention them, your site team will discover the gap at plasterboard stage, which is the most expensive moment to fix it.
4. Test the door type against how each room is used
A pocket leaf disappears into the wall, which frees a swing arc but takes up cavity space and limits what that wall can carry. For a main bedroom ensuite or a study entry, that trade is usually worth it. For a store with shelving on the same wall, it may not be.
Where the proposal applies pocket doors to every opening, ask the manufacturer to justify it room by room. If a wall cannot be opened out, Santerson Wood Veneer Hinged Doors in the same finish is the natural alternative, and matching veneer across both types keeps the joinery consistent. For a wide opening used occasionally, wood veneer folding doors may hold a better sightline than a single sliding leaf.
5. Match the proposal to the rest of your joinery package
Doors rarely sit alone. Veneer on the door, on the architrave and on nearby cabinetry should read as one family, so compare the door schedule against your flush interior doors and any wardrobe or cabinet package in the same project. A single supplier quoting doors and built-in joinery together can match veneer sheets across both; separate suppliers usually cannot.
Ask whether the proposal covers related openings on the same floor plan, including glass pocket doors for a study or media wall, and request one consolidated schedule. Consolidation makes substitutions obvious instead of hiding them across three documents.
6. Verify scope, delivery and site support in writing
Santerson describes its work as covering design coordination, custom and OEM production, door-to-door logistics, installation and after-sales support. Whichever parts you are buying, the proposal should state which of them are included for your project and which are not. Freight mode, packaging, delivery address and who unloads are all commercial points that belong in the document.
Ask how drawings are approved before production starts, what happens if an opening on site differs from the drawing, and which items fall under spare parts and replacement. Reorder lead times for a single replacement leaf should be quoted now, not requested after handover.
7. Score the proposal, then decide
Put the documents side by side and score six items: opening dimensions traceable to drawings; veneer species, cut and finish named; complete hardware schedule; door type justified per room; joinery matched across the package; and delivery plus after-sales scope stated. A proposal that answers all six at a slightly higher price is usually cheaper than one that leaves four of them open.
Send your questions back as a written list and ask for a revised quotation in response. The revision tells you as much about the manufacturer as the first document did: a supplier who answers each point precisely on request is one whose shop drawings you can rely on later.