A swim spa on a hotel site is not a single product purchase. It is a piece of plant that touches structure, power, water, drainage, insulation and daily operations long before the first guest uses it. The Outdoor Swim Spa WS-130Bⅱ sits in our configurable outdoor swim and hydrotherapy range, and its catalogue dimensions of 9950 × 3000 × 1430 mm make it a realistic option for resort terraces, villa poolsides and hospitality leisure decks where a full swimming pool would take too much ground area. The steps below are the ones we ask project buyers to work through before a purchase order is raised.

Start with the site condition, not the model number

Model selection follows from what the site can carry and how the spa will be reached. A unit of this length has to be transported, lifted into position and set on a prepared base, so access routes, crane or forklift points and the load rating of a terrace slab all need confirming with the local structural engineer before production starts. Where the spa is to sit on an upper-level deck or inside a building envelope, that conversation belongs in the design stage, not on delivery day.

  • Clear delivery and lifting path from the kerb or loading bay to the final position, including gate widths and overhead obstruction.
  • Slab or deck load capacity with the spa full of water, plus a drained weight case for maintenance access.
  • A level, fully supported base, and how the cabinet will be insulated or enclosed in cooler climates.
  • Drainage route for drainage and backwash, and where plant room or equipment access panels will remain reachable.

Power and water services drive the lead time

The catalogue entry for this model shows a total power figure of 10.85 kW, together with one control system, one swim training system, one water pump, one filter pump, twenty jets and seven LED lights. Treat those numbers as the starting point for coordination with the project electrical contractor: supply capacity, cable sizing, protection devices and the local earthing and bonding rules must all be verified against the configuration you finally order, because optional equipment changes the load. We confirm included equipment and electrical requirements in writing for each selected configuration rather than assuming a standard package applies.

On the water side, decide early whether the site will supply heated mains water, whether a heat pump is required, and where make-up water and drainage connect. These decisions shape both the quotation and the trades needed on site.

Specify the configuration the operation actually needs

Catalogue-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option should be checked against the specific unit. A hospitality buyer specifying for guest use will usually weigh a different set of options from a private villa: sanitisation approach, how often the water is turned over, whether guests need shallow steps or handhold positions, and what cleaning routine the operations team can realistically keep to.

Where the spa forms part of a wider leisure offer, it is worth pricing it alongside the surrounding outdoor furniture for villas and resorts — loungers, cabana daybeds and shade structures — so that delivery windows, packaging and container space are planned once instead of twice.

Compare the footprint options before locking the size

The same range covers shorter and longer hulls, which matters when a site can take the width but not the length. The catalogue dimensions below are for comparison only; confirm the exact configuration with us before ordering.

ModelCatalogue dimensions (mm)Features shown on the product page
Outdoor Swim Spa WS-130Aⅱ8000 × 3000 × 1400Water jets, LED lighting, Ozone, Swim training system
Outdoor Swim Spa WS-130Bⅱ9950 × 3000 × 1430Water jets, LED lighting, Ozone, Swim training system
Outdoor Swim Spa WS-130Cⅱ11830 × 3000 × 1430Water jets, LED lighting, Ozone, Swim training system

Where a project needs an outline that follows a curved terrace or an irregular deck, our Customizable Shape Outdoor Spa covers square, round, oval and curved forms in an acrylic shell with structural reinforcement, which sometimes solves a space problem that a straight hull cannot.

Coordinate the swim spa inside the wider procurement package

For hotel and resort work, hydrotherapy equipment usually arrives as part of a larger fit-out that also includes ceramics, showers, lighting, flooring, wall and ceiling finishes and loose furniture. Splitting those items across several suppliers multiplies the number of delivery dates, customs files and inspection points your site team has to manage. Our hospitality project furnishing service handles consultation, design and planning, production, logistics, installation and after-sales as one programme, with the six-stage workflow set out on our services pages.

Where a spa needs to match a bespoke surround, timber deck edge or branding detail, that work goes through our Custom & OEM service, which covers custom furniture design and prototyping, bespoke material finishes and flexible order quantities. Freight is arranged by sea, air or rail with customs paperwork, packaging and container loading planned together, and door-to-door delivery keeps the site team receiving one consignment rather than several.

What to have ready when you request a quotation

  • Site photographs, a plan showing the intended position, and the access route for delivery and lifting.
  • The single-line dimension constraint your site cannot exceed, so we can shortlist hull length honestly.
  • Available electrical supply details for the location, including what the contractor can provide now.
  • Your preferred options from the catalogue list, and any sanitisation requirement set by your operator or local authority.
  • The installation window, so production, freight and site trades are sequenced in one plan.
Specifications quoted above are transcribed from our product catalogue and describe the configuration shown on that page. Included equipment, power load and dimensions should be confirmed against your selected configuration before order, and structural, electrical and water compliance checked with local engineers and authorities for the specific site.

Send us the site plan and your target installation date, and we will come back with a configuration proposal, a dimension check against your access route, and a delivery plan that fits the rest of the fit-out. SANTERSON has been manufacturing furniture and building materials since 2008, and works with hospitality, villa and office projects from design through to handover.