A quotation for flat panel hinged wardrobes is only as accurate as the information behind it. Because these units are made to measure — size, layout, door style and surface finish are all specified per project — a supplier cannot price them from a room name alone. Send the items below with your first enquiry and you will normally receive a firm, comparable price instead of a wide estimate range.

1. The opening to work from

Give the clear opening width, height and depth at three points across each wall: left, middle and right. Floors and ceilings in refurbished rooms are rarely square, and a single measurement hides that. Note anything that intrudes into the opening — skirting boards, architraves, door reveals, radiators, pipework, light switches, air-conditioning grilles or a ceiling bulkhead — and say which wall the wardrobe is on.

Also state whether the unit is built into a prepared recess, fitted against an existing wall with a scribe filler, or continued to the ceiling with a top panel. Each option changes the panels, the cutting work and the fitting time, so quoting them as one line item is where most surprises appear.

2. Layout and interior fittings

Send a simple sketch or a marked-up floor plan showing how the wardrobe will be used: long hanging on the left, double hanging for shirts in the middle, drawers and shelves at one end, a shelf run above the door line. State the number of doors and where the hinges should sit, plus anything you want inside — pull-out rails, trouser slides, shoe shelves, an ironing station, a safe shelf, interior lighting or a mirrored panel on a door inner.

Where several rooms repeat, list them by type. A villa or apartment package with identical bedroom layouts is priced differently from one-off units, and the same applies across built-in furniture such as wardrobes, tall cabinets and integrated storage walls.

3. Door style and surface finish

Flat panel doors are specified by panel construction, edge detail and finish rather than by a model number. Confirm the door core and panel material you want, whether the edges are square, eased or mitred, and whether handles are required or a handleless groove profile. Then name the finish — paint colour with a reference code, laminate or foil decor with its supplier code, wood veneer with its species and grain direction — and say whether the doors face a bedroom wall, a bathroom corridor or a hotel guest room, since surface wear and cleaning routine differ.

If you are matching existing joinery, send a physical sample or a photograph taken in daylight next to the item to be matched. Colour screens vary widely, and one small sample removes the most common cause of rework.

4. Hardware and use level

State the expected intensity of use: a private bedroom, a rental apartment turned over between tenants, or hotel guest rooms in daily service. That determines hinge grade, soft-close specification, drawer runner load rating and how the carcass is fixed. Specify what you want included in the price — hinges, runners, handles, legs, plinth, connecting brackets, wall fixings for masonry or timber stud — and whether hardware should carry a brand you already approve.

For projects ordered over several years, mention it at this stage. Repeat units need matching finishes and consistent hardware across batches, which is easier to lock in before the first order than to correct afterwards.

5. Drawings, standards and sign-off

Attach whatever documentation exists: architectural drawings, elevations, a room data sheet, an FF&E schedule or a builder's setting-out drawing. Where a project has a specification document, quote against it directly and flag any item you are substituting. Confirm who signs off the shop drawing before production starts, and how long that approval normally takes on your side — drawing approval is the step most often mistaken for a production delay.

6. Delivery, access and installation

Give the delivery address, the floor, lift dimensions or stair access, parking restrictions, and whether the site allows large panels on the delivery day. For fitted work, state who carries out the installation — your contractor or the supplier's team — and which trades finish around the unit, such as plastering, flooring and decorating, plus the order those trades will follow.

For overseas projects, add the destination port or site, the Incoterms you intend to trade on, and any documentation your customs broker requires. Our logistics service covers freight by sea, air and rail with the paperwork handled alongside production; terms, duties and transit times are confirmed case by case for each destination.

A short checklist before you send

  • Three width, height and depth readings per opening, plus obstructions noted on the drawing
  • Interior layout sketch with hanging, drawer and shelf zones marked
  • Door construction, edge detail, handle or handleless choice
  • Finish named by code, with a physical sample for matched colours
  • Hardware list and use level — residential, rental or hospitality
  • Quantity by room type, phasing and target on-site date
  • Delivery access, installation responsibility, trade sequence
  • Named approver for the shop drawing before production

How we quote these wardrobes

SANTERSON manufactures flat panel hinged wardrobes as part of the Hinged Door Wardrobes collection, made to measure for residential and hospitality projects. Send us the measurements, layout and finish above and we return a quotation covering panels, hardware, packing and delivery terms, with a shop drawing prepared for your approval before production. Our custom and OEM service covers bespoke sizes, finishes and branding, and the same team coordinates wardrobe joinery alongside custom built-in kitchen cabinets, flooring and other interior fixtures for villa, apartment and hotel projects.

Every quotation lists the dimensions and finishes confirmed for that project, so you can compare offers line by line rather than on a single total. Contact us with your drawings and we will price them.