A hidden cabinet looks simple on a drawing. A flush panel, no visible hardware, a door that opens without breaking the line of the wall. That simplicity is exactly why quotations for this type of joinery come back all over the place. Two fabricators can look at the same sketch and price completely different products, because the drawing does not say what is behind the panel.

If you want comparable numbers from more than one maker — and a price that does not move after the order is placed — send the same information package with your enquiry. Below is what we ask for on every hidden cabinet project, and why each item changes the cost.

Start With the Wall, Not the Cabinet

Hidden cabinetry is built to fit a specific opening in a specific wall. A made-to-measure piece cannot be quoted from a nominal length. For each run, send:

  • Measured dimensions of the opening — width, height and available depth, taken on site rather than read off a scaled plan.
  • Construction type of the surrounding wall — masonry, stud partition, or an existing built-in. This decides whether additional framing, packing or a support frame is needed.
  • Floor and ceiling finishes at the opening — skirting to be scribed around, cornice to be cut back, or a full-height panel that runs floor to ceiling like our full height storage walls.
  • Obstructions — downlights, switches, air grilles, radiators, pipes and structural columns. Photographs with a tape measure in frame resolve these faster than any description.

Where the wall also carries a concealed access door, tell us early. A decorative concealed door has to be detailed together with the panelling around it: hinge side, swing direction, gap tolerance and whether the panel is to sit proud or flush. Ordered separately, doors and panels are frequently delivered in different finishes.

Say What the Cabinet Has to Do

The internal layout drives more cost than the exterior does. A blank box with two shelves is a different product from the same box fitted with pull-out trays, an appliance bay and integrated lighting. Please specify:

  • What is being stored — linen, dry goods, tableware, books, cleaning equipment, luggage, or an appliance.
  • Open versus closed split — how much you want on display and how much behind doors. Our mixed open and closed storage wall systems are configured this way, section by section.
  • Hardware behaviour — handleless fronts, push-to-open, hinged, sliding or folding. Sliding fronts need pocket or track detail; hinged fronts need clearance for the swing.
  • Appliance integration — model numbers and cut-out dimensions for anything refrigerated, washing or vented. Ventilation paths have to be designed in, not added later.
  • Lighting — whether integrated cabinet lighting is required inside niches and shelved bays, and where the transformer and switch will sit.

Fix the Finish and the Substrate

"Matching the existing" is not a specification. Send a physical sample, a manufacturer code, or both. Veneered panels in particular vary board to board, so grain direction and sheen need stating before production starts. Specify:

  • Door and panel material — veneer, lacquer, melamine, acrylic or a painted substrate.
  • Colour or grain reference — supplier code plus a sample where colour match matters.
  • Sheen level — matte, satin or high gloss. Gloss panels show fingerprints in heavy-use areas and are usually avoided in a family utility run.
  • Edge and profile detail — square edge, eased edge, or a routed profile if the design follows a grey shaker cabinet frame rather than a flat slab.
  • Adjacent finishes — worktop, flooring and wall paneling, so the joinery can be sampled against them.

Quantity, Location and Delivery Terms

A quotation is also a logistics document. For multi-unit or project work, include:

ItemWhy it changes the price
Number of identical runs and number of sitesRepeating one layout across several units is cheaper per piece than designing each room separately.
Destination country and delivery addressDetermines freight mode, packaging grade and whether container loading can be consolidated with other goods.
Delivery terms you want quotedPort-to-port and door-to-door are different numbers. We arrange sea, air and rail freight with customs paperwork, but the Incoterms have to be agreed before we quote.
Storage on siteCabinetry delivered ahead of a finished room needs covered, dry staging, or it gets damaged before installation.
Installation scopeTell us whether you want the units supplied flat-packed for your own fitters, or built-up units with our on-site installation and snag inspection.

Send These Documents With the Enquiry

A complete package usually lets us come back with a real quotation instead of a set of questions:

  • Room-by-room plans and elevations, PDF, with dimensions marked.
  • A schedule of each cabinet run: reference, size, door type, internal layout, finish.
  • Photographs or a video walkthrough of the actual spaces.
  • Appliance and sanitaryware schedules where cabinetry has to fit around them.
  • Finish samples by post, or supplier codes with batch numbers.
  • Programme dates: when you need drawings back, when production must start, when the site needs delivery.

One caution on the technical side. Our published product pages describe configurable sizing and finish options; they do not fix a single specification for every project. Material grades, panel thicknesses, load ratings, electrical ratings and any local building or fire requirements should be confirmed against your drawings before anything is signed off.

How This Works With a One-Stop Supplier

Hidden cabinets rarely stay alone. Once the wall system is designed, the media bay, wardrobe and pantry normally follow the same language. Handling them as one package avoids the mismatched-finish problem and lets everything ship together. On our mid-century whole-house custom cabinetry project, for instance, the bay-window desk, staircase shelving and kitchen cabinets were measured on site and produced as one set, with a single delivery and installation programme.

Send what you have even if it is incomplete — a sketch and a few photographs are enough to start. As a one-stop furniture and building materials supplier, we work through space planning, detailing, production, freight and installation as one scope, and we will tell you which gaps in the information package actually affect the price and which do not.

Send your drawings, room schedule and finish references to our project team, and we will return a quotation itemised by run — so hidden cabinets from different makers can be compared line for line.