A rendering of a bedroom with a wardrobe in the return corner is not enough for a manufacturer to price the job. If you are specifying Sliding Door Corner Wardrobes for a villa or apartment, the enquiry you send decides whether the first quotation is close to final or whether you spend three weeks trading questions back and forth. Below is the information set we need on our side to take your brief straight into design and costing.
Start with the corner itself, not the door style
Corner wardrobes are built around two wall returns meeting at an angle, so the first thing we need is what those returns actually do. In your drawings or on-site notes, mark:
- The length of each wall return, measured in millimetres from the corner to the end of the run.
- The angle at the corner — a true 90 degrees, or off-square, which is common in older villas and renovation work.
- Room height at several points, plus any beam, bulkhead, duct or downlight that cuts into the top of the run.
- Skirting, architrave, cornice or floor trims that must be removed, scribed around, or matched.
- What sits on the adjacent walls: a bed headboard, a door swing, a window reveal, a radiator or a switch plate.
This matters more for a corner than for a straight run. The corner unit is where the internal layout has to work twice — one carcase turning into another — and it is also where sliding panels cross paths. Send us photographs of the corner from both ends of the room, with a tape measure visible in at least one of them.
Then define how the doors may travel
Sliding doors save the floor space a hinged door would need to swing, but they take depth in the headroom and along the wall. For each run, tell us:
- How many panels you want and how they should stack when open — one pocket behind the other, or two panels meeting in the middle.
- The clear opening width you need to reach the hanging zone comfortably.
- Whether the corner itself must be reachable with the doors open, or whether a fixed return panel is acceptable there.
- Ceiling and floor conditions: a level finished floor, underfloor heating, a tiled edge, or a floating floor that cannot be fixed into.
If the room is tight, say so in words rather than leaving us to infer it from a scale drawing. A line such as "the bed sits 600 mm from the front of the wardrobe" tells us immediately why hinged doors were ruled out.
Give the internal layout in your own terms
You do not need to draw a joinery schedule. Describe how the space will be used, and we will convert it into an internal plan:
- Long hanging for coats and dresses, double hanging rails, or short hanging only.
- How many drawers, and whether they should sit above or beside the corner rather than across it.
- Open shelving heights for folded linen, boxes, bags or shoes.
- Anything to be built in alongside the wardrobe: an ironing bay, a safe, lighting inside the carcass, a full-length mirror on a panel.
Tell us who uses the wardrobe and what it holds. A guest-room corner unit and a main-bedroom unit for two people are specified differently, and that single sentence changes how we allocate hanging space.
State the finish you want, and the finishes it must match
Our corner wardrobe range is made to measure, with material and finish selected per project. To keep the sample round short, send:
- The door face you are considering — Glass Sliding Door Wardrobes, mirror, lacquer, veneer or melamine — and whether the glass should be clear, frosted, smoked or ribbed.
- The carcass and interior finish, which does not have to match the door face.
- Existing items the joinery must sit against or repeat: L Shaped Corner Wardrobes already installed on another wall, kitchen cabinetry, doors and architraves, or flooring.
- Reference images with the make and model noted where you have them, plus any hardware brand you prefer for rails, soft-close drawers and handles.
Where a finish has to match an existing piece exactly, flag it as a matching requirement rather than a preference. Matching work is quoted and sampled differently from selecting a new colour from a palette.
Close the brief with the project facts
The last block of information is administrative, and it is where enquiries most often stall:
- Quantity — how many wardrobes or how many linear metres across the whole project, and whether other rooms need matching built-ins.
- Project type and location, and whether you are a homeowner, builder, designer or developer.
- Programme: when the drawings must be signed off and when the units must be on site.
- Delivery address and who receives goods on site; we arrange freight by sea, air or rail with door-to-door delivery, so the receiving arrangement needs naming early.
- Whether you want installation support, or whether your own fitters will install from our drawings.
What you get back from a complete brief
With the corner dimensions, door travel, internal layout, finish references and programme in one message, we can move directly into space planning and product specification instead of clarifying questions. You receive a layout proposal with the panel arrangement resolved, a quotation built on the actual run lengths, and confirmation of what needs your sign-off before production starts. If the same bedroom also needs U Shaped Corner Wardrobes on a third wall, or matching cabinetry, panelling and doors elsewhere in the property, send those drawings in the same enquiry — shared dimensions and one finish schedule keep the whole fit-out consistent.
Send us your floor plan, a few photographs of the corner, and the four blocks above. That is usually enough to turn a design brief into a firm quotation for sliding door corner wardrobes on the first pass.