Outdoor Swim Spa WS-PC04CH is one of the more compact hydrotherapy shells in our configurable swim and spa range, listed at 4500 × 3000 × 900 mm with 46 water jets, one LED light and an ozone system. Two questions come up on almost every enquiry about this model. First, what is the shell actually made of, and how is it reinforced? Second, what does the outside look like, and does that finish hold up outdoors? Those two answers — shell material and exterior cladding — decide how the unit wears over ten years, not the jet count.

This guide walks through the material and finish decisions you need to lock down for Outdoor Swim Spa WS-PC04CH, what each option changes in practice, and what to put in writing before a purchase order is raised.

Start with the shell, because it carries everything else

The shell holds the water, carries the jet fittings and takes the abrasion of daily use. The other outdoor spa and swim spa pages we publish are explicit about what they use: the Customizable Shape Outdoor Spa page states a durable acrylic shell with balanced structural reinforcement, and the Luxury Outdoor Swim Spa with Massage Jets page states a robust acrylic interior with a reinforced cabinet. Acrylic suits this category because it can be formed as a single moulded basin, so there are no internal seams for water to work through, and light surface marks can be polished out rather than patched. The WS-PC04CH product page itself does not state the shell material, so treat that as the first line item to confirm on the quotation.

What matters commercially is not the word "acrylic" but what sits behind it. Ask your supplier three things:

  • the sheet material and its thickness as supplied, and whether reinforcement is applied to the exterior face of the shell or only at load points;
  • how the shell is supported once filled — a 4500 × 3000 × 900 mm basin holds several tonnes of water, so the base support grid and perimeter frame have to be specified for the installation surface you actually have;
  • whether the reinforcement and support package is standard on this model or a priced option.

For WS-PC04CH, our catalogue record lists the shell dimensions and the equipment fitted — one control system, one water pump, one filter pump, 46 jets, one LED light, ozone, total power 2.45 kW — and states that included equipment and electrical requirements must be confirmed for the selected configuration. That note is deliberate: two units with the same model code can leave the factory with different options fitted.

The exterior cabinet is where visual comparison starts

The cabinet is what your guests and buyers see, and it is also the part exposed to rain, sun and cleaning. Two finishes appear on the pages we publish for this category: a wood-look cabinet described as durable on the Round Outdoor Hot Tub Spa with Hydrotherapy Jets & Underwater LED Lights, and a sleek grey exterior on the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool. Those pages describe the units as weather-resistant and structurally stable. The WS-PC04CH page lists no cabinet material, so the finish you want has to be agreed as part of the order.

When you compare cabinets side by side, judge them on four practical points rather than on the sample photo:

  • edge detailing — mitred or capped corners are where moisture ingress and lifting start on any outdoor cabinet;
  • whether the cladding is a single board material or an assembly of strips, because more joints mean more maintenance;
  • how access to pumps, filters and the control system is provided, since a sealed cabinet that hides the service points costs more over its life than one with removable panels;
  • the colour and texture range you can specify for a project, so the spa reads as part of the terrace rather than as equipment sitting on it.

If your project already specifies decking, screens or pergola finishes, send those references with the enquiry. We manufacture furniture and building materials in the same facilities, so cabinet colour and texture can be coordinated with the surrounding outdoor furniture scheme instead of being chosen in isolation.

Insulation and equipment options change the finish specification

The options catalogued for this range — control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps — are not only a plumbing decision. Insulation sits between the shell and the cabinet, so it changes the cabinet build-up and where service panels have to be placed. A heat pump or sand filter added to the specification also moves plant location and access clearances.

Two comparison points worth pricing carefully:

  • Insulation. The catalogue lists insulation as an option for this range rather than as standard on every model. Where the spa runs outside a warm season, ask what insulation package is offered for WS-PC04CH and how it is fixed, then compare like for like between quotations.
  • Power. The catalogue figure for WS-PC04CH is 2.45 kW total power. Compare that number only against configurations with the same options fitted — a heat pump changes the electrical load far more than the jet count does, and your electrician needs the final configuration, not the base figure.

How WS-PC04CH sits against neighbouring models

Material quality is broadly consistent across the range; what changes between models is size, jet count and whether a swim training system is fitted. That affects finish choices too, because a longer shell needs a cabinet with more runs of cladding and more access panels.

Model Catalogue dimensions Jets Total power Features shown
Outdoor Swim Spa WS-PC03 3000 × 3000 × 1000 mm 50 pcs; 4 water columns 2.75 kW Water jets, LED lighting, Ozone
Outdoor Swim Spa WS-PC04CH 4500 × 3000 × 900 mm 46 pcs 2.45 kW Water jets, LED lighting, Ozone
Outdoor Swim Spa WS-PC05CH 5000 × 3000 × 900 mm 30 pcs 2.45 kW Water jets, LED lighting, Ozone
Outdoor Swim Spa WS-PC06CH 6000 × 3000 × 900 mm 38 pcs 3.25 kW Water jets, LED lighting, Ozone
Outdoor Swim Spa WS-PC07A-T 7000 × 3000 × 1470 mm 56 pcs 11.55 kW Water jets, LED lighting, Ozone, Swim training system
Outdoor Swim Spa WS-PC08T 8000 × 3000 × 1500 mm 28 pcs 10.85 kW Water jets, LED lighting, Ozone, Swim training system

The specifications above are the figures published on each model's catalogue page. Jet counts and power do not move in step with length, which is why a specification-by-specification comparison beats comparing models by size alone. If you want the wider view of what is available, the full Swimming Pools and Swim Spas category lists every model in this range.

What to confirm before you order WS-PC04CH

  1. Shell build: material, thickness and reinforcement method for the unit you are buying, confirmed in writing against the model code.
  2. Cabinet specification: cladding material, colour or texture reference, edge detailing and which panels are removable for service.
  3. Option list: control system, filtration, sterilisation, heat pump, insulation and steps — each priced and marked as included or optional.
  4. Electrical load: the total power figure for the finished configuration, supplied to your electrician before first fix.
  5. Support arrangement: base and perimeter support detail for a ground slab, terrace or deck, drawn against your site condition.

SANTERSON has manufactured furniture and building materials since 2008 and supplies swim spas as part of a wider project package, so the shell and cabinet specification can be coordinated with the rest of the outdoor scheme. Our Custom & OEM Service covers bespoke material, finish and texture choices, while Logistics & Door-to-Door Delivery covers freight forwarding, customs paperwork and container loading, and Installation & After-sales Support covers on-site installation, inspection, warranty coverage and spare parts. Send the model code, your site condition and the finish references you want to match, and we will confirm the configuration and quotation for it.