A custom outdoor swim spa is not a catalogue item you simply order by model number. On the Outdoor Swim Spa WS-S07B-T, for example, the published catalog entry gives a starting footprint and a feature list — but the unit that finally leaves the factory is defined by the configuration your team signs off. Before production begins, we walk project buyers through a short confirmation list. Getting these items agreed in writing prevents rework, delayed shipments and on-site surprises.

1. Site dimensions and the clearance envelope

The catalog entry for this model lists 7000 × 2200 × 1365 mm. Treat that as the shell size, not the space you need. Before we cut any panel, confirm with your site team:

  • The finished internal dimensions after insulation and cladding are added.
  • Access routes for delivery — gate width, turning radius, crane or forklift access, and whether the unit ships as one piece or in sections.
  • Setout drawings showing position relative to the pool deck, retaining walls, planting and any overhead structure such as a pergola.
  • Working space left for the plant room, filtration equipment and routine servicing.

Send us your site plan with dimensions marked. If the location is tight, we will tell you honestly whether this model fits or whether a shorter hull from the Swimming Pools and Swim Spas range suits better.

2. Included equipment versus optional accessories

The published specification for WS-S07B-T shows a control system, a swim training system, one water pump, one filter pump, 44 jets in total, and LED lighting. Optional items listed in the catalog include UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps — but availability and compatibility vary by model.

So before production we ask you to sign a bill of materials that states, line by line:

  • Which pump set is included and which are quoted as extras.
  • Jet count and layout, and whether any jets are repositioned for your use case (rehabilitation, lap swimming, leisure).
  • Whether a heat pump is ordered, and its heating capacity relative to the water volume and the local climate.
  • Insulation package — relevant when the spa sits outdoors in cooler seasons.
  • Steps, handrails, cover and other access items, and who supplies them.

Specification note: figures such as total power consumption are transcribed from the product page for the standard catalog configuration. The number changes once optional equipment is added. We confirm the assembled specification with you before manufacturing, rather than assuming a published figure applies to your build.

3. Power supply and electrical interface

This is the item most often discovered too late. Before we produce the unit, agree with your electrical contractor:

  • Supply voltage, phase and frequency available at the installation point, and whether that matches the configuration being built.
  • Cable size, route and isolation requirements from the distribution board to the spa.
  • Earthing, bonding and residual-current protection as specified for the selected equipment set.
  • Location of the control system and how it will be reached for operation and maintenance.

Our engineering team issues the electrical requirement sheet for your confirmed configuration. Your local contractor then verifies it against local wiring rules — that division of responsibility should be written into the project programme, because electrical work at site is done locally.

4. Structure, base and water connections

A swim spa needs a competent base. Before production we confirm with you:

  • The bearing capacity of the slab or ground, taking the full wet weight into account.
  • Drainage around the unit, including overflow and backwash discharge points.
  • Fresh water supply connection, and drainage for emptying and cleaning.
  • Whether any excavation, retaining work or deck finishing is in your scope or ours.

5. Finish, branding and documentation package

Because the unit is made to order rather than picked from stock, you can also fix the appearance and paperwork at the same stage. Our Custom & OEM Service covers bespoke finishes and textures, prototyping support, and branding such as engraving or logos on the surrounding cabinetry and cladding. For hotel and villa projects we also confirm:

  • Colour and material samples approved before mass production starts.
  • As-built drawings and equipment lists in the language your site team works in.
  • Operation and maintenance manuals, spare-parts list and warranty terms for the assembled configuration.

6. Logistics sequence and who installs on site

Once the specification is signed, we plan backwards from your installation date. Logistics & Door-to-Door Delivery covers freight forwarding by sea, air or rail, packaging and container loading, customs paperwork and tracking to site. For this product group you should confirm early:

  • Incoterms and who handles import clearance and duties.
  • Delivery address access, and the delivery window your site can accept.
  • Crane or lifting equipment needed at site, and who arranges it.
  • Commissioning support: our Installation & After-sales Support service lists on-site installation, inspection and snagging, spare parts and maintenance — the exact scope for your project is agreed in the contract.

A simple sign-off sequence we recommend

  • Step 1: site plan, access route and base details from your side.
  • Step 2: confirmed bill of materials — pumps, jets, swim system, lighting, ozone, insulation, heat pump, steps.
  • Step 3: electrical requirement sheet matched to your supply.
  • Step 4: finish samples and branding approval.
  • Step 5: shipping terms, delivery window and commissioning scope in writing.
  • Then production is released.

Nothing above should be left to a verbal agreement. Every item that changes after production starts carries a cost and a delay, and the buyer usually absorbs both.

If your project needs a different shape or length

Where a standard hull does not suit the terrace, rooftop or garden layout, we also produce a Customizable Shape Outdoor Spa - Personalized Hydrotherapy Pool, and longer layouts such as a Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool for projects that want a genuine lap-swim lane beside the massage zone. Send drawings early in design, so the spa is coordinated with decking, lighting and landscaping instead of being squeezed into them later.

Send us your swim spa enquiry. Share your site plan, target configuration and installation date, and our project team will return a specification sheet and quotation for review. Contact PHILLIP, SANTERSON — Phone / WhatsApp +86-13928214007, Email santerson@qq.com, or reach us through SANTERSON. Business hours Monday–Saturday, 8:00 AM–6:00 PM (GMT+8).