When a bedroom joinery package reaches the approval stage, the wardrobe submittal is usually the document that decides whether the design intent survives into production. For High Gloss Sliding Door Wardrobes, a reflective door face hides very little: every dimension, edge detail and fixing condition has to be stated in writing before the panels are cut. Below is the content we expect to see exchanged with a specifier or contractor, item by item, so that approval comments can be answered once instead of over several rounds.
1. Room dimensions and the clear opening envelope
Sliding doors travel on a track, so the submittal must record more than the width of the wall. We ask for the overall width, height and depth of the recess; the position of skirting, architraves, cornices and any door or window reveal that reduces the usable envelope; plus the floor-to-floor height measured at several points along the run. A high gloss wardrobe is normally specified to read as a flush wall plane, so an out-of-level floor has to be resolved with a scribe or packer detail on the drawing rather than discovered on site.
Please also confirm what sits above and beside the unit: bulkheads, curtain boxes, lighting coves, air-conditioning grilles and switch plates. These are the items most often missing from a first submittal and the reason a made-to-measure unit has to be re-cut.
2. Door layout, panel count and travel direction
The drawing should show how many door panels the run is divided into, which panel overlaps which, and where the leading edge stops at each end of the track. Two-panel and three-panel runs behave differently in terms of access to the interior, so the layout needs to be checked against the internal zoning behind it. Where a corner or an L-shaped recess is involved, we note the return dimension explicitly and state whether the sliding run continues past the corner or stops at a fixed panel.
Our Mirror Sliding Door Wardrobes are documented to the same level, which makes it straightforward to compare a gloss door face with a mirrored one when a bedroom scheme is still open at design stage.
3. Finish schedule and sample reference
A submittal that says only "high gloss" is not enough to approve. The schedule should name the door material family, the colour or decor code, the direction of any grain, and the edge treatment on both visible and concealed edges. Because a gloss surface reflects its surroundings, we recommend including an approved physical sample reference and stating which surface — door face, internal carcass, shelf edges — carries which finish. Where a scheme mixes materials, such as a gloss door with a timber-tone open niche, each surface gets its own line in the schedule.
For handleless or profile-pull details, the drawing should show the reveal between panels and how fingers reach the leading edge, since this affects the gap allowance between doors and the wall.
4. Internal layout and storage zoning
The interior is where the unit earns its keep, so it belongs in the submittal rather than being left to site judgement. We list hanging zones with their heights, shelf spans and thicknesses, drawer banks with their widths and load type, and any lighting provision. Long-hanging for coats and dresses sits at a different height from double-hanging, and trouser or shoe storage changes the floor zone. A Custom Minimalist Bedroom Wardrobe brief is normally resolved the same way: zoning first, door face second.
Where a project repeats the same layout across several bedroom types, the submittal should carry one typical section per type, each tied to a room schedule reference.
5. Hardware, track and operating detail
Please specify the track system, the hanger or roller set, the door weight assumption behind that selection, and the stop and buffer arrangement at each end of travel. For a full-height gloss panel, the hardware choice determines whether the door sits proud of the frame or is recessed into it, and that reading is visible in the finished room. We state the opening clearance required in front of the unit so that beds, side tables and other furniture do not block the travel.
6. Site conditions and interfaces
The submittal should record wall construction and fixing substrate, floor finish build-up at the track line, whether the unit bears on the finished floor or on a prepared base, and how the wardrobe meets plasterboard, joinery linings and adjacent cabinetry. Ceiling interfaces matter most on gloss runs: an uneven plaster line against a reflective panel is obvious under lighting, so the setting-out drawing should show the shadow gap or trim detail being proposed.
7. Tolerances, sequencing and responsibilities
We include the dimensional tolerance band we build to, the survey method used before final dimensions are released, and the sequence in which the unit is installed relative to painting, flooring and electrical fit-off. The submittal also states who supplies and installs each part — wardrobe carcass and doors, track, mirror or glass elements where they form part of the door face, and any integrated lighting — so that no interface is assumed by two parties or by neither.
8. Documentation to attach
- Elevations for every wardrobe run, with overall and panel dimensions marked.
- A horizontal section through the track showing door overlap and clearances.
- Internal layout sections per bedroom type, with shelf, drawer and hanging heights.
- Finish schedule with material codes, grain direction and edge treatment.
- Hardware schedule naming track, hangers, stops and any integrated lighting.
- Room schedule cross-reference so each elevation maps to a room number.
How our team supports the submittal stage
SANTERSON manufactures built-in furniture alongside the rest of the fit-out package, and dimensions, layouts and finishes for this product line are set per project rather than chosen from a fixed size range. Our design and coordination service covers space planning, drawings and production follow-up, so comments on a first submittal can be closed out before panels enter cutting. Where the wardrobe is part of a wider bedroom or villa package, the same documentation approach applies to cabinetry, wall panelling and doors, which keeps one consistent set of approval records across the project.
Production is followed by door-to-door logistics and on-site installation support, so the approved submittal remains the reference point from survey through handover. Dimensions and selected specifications are confirmed for each project before manufacture begins.
Before you send the first draft
A complete submittal for High Gloss Sliding Door Wardrobes answers eight questions in advance: what the space actually measures, how many doors travel where, which finish sits on which surface, how the interior is zoned, what hardware carries the panel weight, how the unit meets walls floor and ceiling, who does what on site, and what drawings back all of that up. Send those items together and approval usually closes in one round.
Share your room schedule and elevations with our team and we will return a submittal set prepared to this structure, ready for your comments.