A wardrobe line item that reads “moulded paneled, as per sample” tends to hold up right until the joinery package reaches production. At that point the difference between a smooth handover and an expensive variation has usually already been decided — in what the procurement brief says, not on site. This guide sets out what to put in that brief for decorative moulded paneled wardrobes, and how the same structure helps you coordinate the rest of the cabinetry scope with one supplier.
Why moulded paneled wardrobes need a different brief from flat-front joinery
Moulded and paneled doors carry profile: raised or recessed fields, mouldings, arrises and shadow gaps. Each of those features has a depth, a radius and a finish build-up that changes how the door reads in raking light. Flat-front slab doors hide tolerance problems; profiles expose them.
That is why the brief should describe the profile rather than point at a photograph. A reference image tells a manufacturer what you like. A dimensioned elevation tells them what to make, and gives your quantity surveyor something measurable to price.
The five items that belong in every wardrobe line item
1. Room-by-room schedule. One row per wardrobe run: room number, opening width, height to the ceiling or bulkhead, depth, and whether the unit is built into a recess or freestanding. Note structural columns, skirting, AC grilles and door swings that cut into the run — these determine how many doors you get and where the reveal lands.
2. Door construction and profile. State the panel type (raised, recessed or moulded), the frame width, the moulding profile reference, and the number and width of doors per run. If the design intent is a specific door style from the Classic Paneled Wardrobes collection, name that style in the brief and attach the elevation.
3. Substrate and finish system. Specify the board substrate, the surface treatment (paint, lacquer, veneer or laminate), the colour reference, and the sheen. For moulded components, ask what the finish build-up is on edges and profiled returns — a sprayed moulding can look different from a flat panel of the same colour, and this is the most common source of “that’s not the right white” disputes.
4. Interior layout. Hanging heights, shelf spans, drawer stacks, pull-out hampers, lighting provisions and any integrated mirror or glass element. Interior fit-out is usually where a project budget quietly grows, so decide it before quotation rather than during installation.
5. Interface conditions. Floor finish build-up, wall make-up, skirting treatment, ceiling level tolerance, and who supplies the scribe, plinth and cornices. State whether the wardrobe butts into a niche panel or an integrated door line, because those details change the reveal profile.
Reading a quotation: three columns worth insisting on
Ask every bidder to break the price into (a) carcass and doors, (b) hardware and interiors, and (c) packing, freight and delivery. If one supplier quotes a single lump sum while another quotes three lines, the two cannot be compared — and you lose the ability to take value out later without opening a variation.
Also request the make-to-measure confirmation step in writing. A made-to-measure wardrobe programme is re-surveyed against site conditions before production; that survey should be listed as a named activity with a responsible party and a date, not assumed.
Coordinating wardrobes with the rest of the fit-out
Wardrobe doors, interior doors and kitchen cabinetry usually share paint colours, veneers and moulding language. Splitting them across three suppliers means three colour-matching exercises and three sets of site tolerances. Consolidating the joinery scope with one custom and OEM service manufacturer lets you approve one set of finish samples that governs every timber element on the project.
Logistics follows the same logic. A joinery package arriving in one consolidated shipment, with a packing list keyed to room numbers, is far easier to install than three partial deliveries landing in different weeks.
A practical sequence
- Brief stage: issue the room schedule and profile drawings; request a specification response, not just a price.
- Sampling stage: approve one full-height door sample with hardware fitted, viewed under the actual room lighting before release.
- Survey stage: confirm dimensions and selected specifications against completed site conditions; freeze the layout.
- Production and logistics: agree packing, marking and delivery sequence at order confirmation, not at dispatch.
- Handover: walk the snags room by room against the approved sample, and record spares — mouldings, doors and hardware — on the same list.
Working with a single manufacturing partner
SANTERSON has been producing furniture and building materials since 2008 and supplies furniture and building materials for villa, hospitality and office projects, covering cabinetry and joinery alongside the finishes that surround it. Wardrobe programmes are made to measure with material and finish options selected per project, and dimensions and specifications are confirmed for each order before production.
If you are preparing a tender package, send the room schedule and elevations early — even at concept stage — and ask for a specification review. On moulded paneled wardrobes, the least costly variation is the one you never have to raise.